Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

1209 SWQMP Report_3 2013

of 114

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                      Callaghan & Toth

                         should be made for unsuccessful plantings. Ensure watering rates are adequate
                         and increase if necessary.
                         Replace geotextile where used, check and if necessary replace sand media with
                         coarser sand. Check that slotted pipe is not blocked and outlet free draining.
                         Replace and repair where necessary.
                         Erosion should be repaired and investigate measures to reduce erosion e.g.
                         install rock spalls upstream of the erosion so as to dissipate the flow across a
                         broad area.
                         Dominating weeds should be removed by hand and taken to the Council’s Refuse
                         Centre.

                                              Operational Phase

Objective                The Owner is to include the Bioretention systems into their maintenance
                         program.



Actions                  Inspect Bioretention systems every six months to determine maintenance
                         requirements.
                         Undertake general maintenance such as:
                              ¾   Remove accumulated litter / debris
                              ¾   Remove accumulated sediments
                              ¾   Remove weeds and dead plants
                              ¾   Replace plants where necessary
                              ¾   Water plants if necessary
                              ¾   Control erosion and sediment loss upstream or within system where
                                  necessary.
                         Routine clean outs of Bioretention Systems should be planned on a ten-yearly
                         basis.

Monitoring               The Owners Landscape Gardener will carry out six monthly inspections of the
                         Bioretention Systems. The following will be examined at each inspection:
                              ¾   Sediment build up on the surface under the river stones
                              ¾   Health of vegetation
                              ¾   Pondage during major storms not infiltrating into the sand
                              ¾   Erosion at the outlet
                              ¾   Pondage during minor storms

Reporting                Inspection Records are to be logged and kept for verification of compliance on a
                         need basis.
                         Records of any maintenance are to be logged and kept on site.
                         Records of environmental incidents and corrective actions should be kept on site
                         and Council notified of any problems.

Incidents                Sediment builds up on the surface.
                         The vegetation dies off.



                                                                                                     D
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                   SWQMP_REV_3
SEPTEMBER 2013
Log in to download the original file

1209 SWQMP Report_3 2013.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.