Skip to the record
Accept no imitations.

Original source · versioned page text

1209 SWQMP Report_3 2013

of 114

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                       Callaghan & Toth

Actions                  The Consulting Engineer is to ensure that:
                              •   Buffers are sized in accordance with this Integrated Water
                                  Management Plan.
                              •   Buffers drain evenly and do not concentrate flows.

Monitoring               Developer is to review the Works Plans and Building Plans.

Reporting                Works Plans and Building Plans are to be provided to consultants, developer
                         and contractor.

Incidents                The Buffers are not approved according to submitted plans.

Corrective Actions       The Consultant will redesign the Buffer system to address any concerns.
                         Major changes will require further Stormwater Quality Management Modelling.

                                            Construction Phase

Objective                The Contractor will install the Buffers to ensure overland flow is evenly
                         distributed.

Actions                  Contractor to construct buffers as per the plans and ensure:
                              •   Buffers are well vegetated with no bare earth.

Monitoring               Design Engineer to review buffer construction to ensure in accordance with
                         design plans.

Reporting                Operational Works approval to be logged and kept for verification of
                         compliance on a need basis

Incidents                Approval is not granted for Operational Works application.
                         Buffers not adequately stabilised with vegetated cover.

Corrective Action        Contractor to review application and change to address issues raised.
                         Contractor to grass-seed or turf buffer to achieve required vegetation cover.

                                              Operational Phase

Objective                Ensure that vegetated buffer system is operating effectively and providing
                         treatment of overland sheet flow from catchments around Poultry farm.

Actions                  Owner to maintain vegetated buffers as follows and conduct six monthly
                         inspections:
                              •   Check for areas of erosion
                              •   Check for areas of concentrated flow
                              •   Check for vegetation cover over buffer area

Monitoring               Owner to monitor vegetated buffer systems as detailed above.



Reporting                Records are to be logged and kept for verification of compliance on a need

                                                                                                      H
1209 Animal Husbandry – Top Forestry Rd, Ridgewood                                    SWQMP_REV_3
SEPTEMBER 2013
Log in to download the original file

1209 SWQMP Report_3 2013.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.