1209 SWQMP Report_3 2013
Catchment A +dam detention Q10 Coo noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here} Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC Page 2
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Subcatchment 2S: Half catchment A Runoff Area=56,815.0 m² 0.00% Impervious Runoff Depth=37 mm
Tc=23.0 min C=0.74 Runoff=1.29046 m³/s 2.105 Ml
Subcatchment 6S: Half catchment A Runoff Area=56,815.0 m² 0.00% Impervious Runoff Depth=37 mm
Tc=23.0 min C=0.74 Runoff=1.29046 m³/s 2.105 Ml
Reach 4R: (new Reach) Inflow=1.90082 m³/s 4.176 Ml
Outflow=1.90082 m³/s 4.176 Ml
Pond 4P: (new Pond) Peak Elev=125.255 m Storage=0.685 Ml Inflow=1.29046 m³/s 2.105 Ml
Outflow=0.95041 m³/s 2.088 Ml
Pond 7P: (new Pond) Peak Elev=125.255 m Storage=0.685 Ml Inflow=1.29046 m³/s 2.105 Ml
Outflow=0.95041 m³/s 2.088 Ml
Total Runoff Area = 11.3630 ha Runoff Volume = 4.209 Ml Average Runoff Depth = 37 mm
100.00% Pervious = 11.3630 ha 0.00% Impervious = 0.0000 ha
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.