Original source · versioned page text
1209 SWQMP Report_3 2013
Catchment A +dam detention Q10 Coo noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Prepared by {enter your company name here} Printed 24/04/2013
HydroCAD® 10.00 s/n 05328 © 2011 HydroCAD Software Solutions LLC Page 3
Summary for Subcatchment 2S: Half catchment A
[48] Hint: Peak<CiA due to short duration
Runoff = 1.29046 [email protected] hrs, Volume= 2.105 Ml, Depth= 37 mm
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
noosa 10-Year Duration=20 min, Inten=127.9 mm/hr
Area (m²) C Description
56,815.0 0.74 LIGHT GRASS ON clay
56,815.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (meters) (m/m) (m/sec) (m³/s)
23.0 Direct Entry, GRASS OVER clay
Subcatchment 2S: Half catchment A
Hydrograph
1.29046 m³/s Runoff
noosa 10-Year
Duration=20 min,
Inten=127.9 mm/hr
1
Runoff Area=56,815.0 m²
Flow (m³/s)
Runoff Volume=2.105 Ml
Runoff Depth=37 mm
Tc=23.0 min
C=0.74
0
0 1 2 3
Time (hours)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.