Construction Management Plan - Unit 15 The Hastings - 100217 · 51983.3225.06
Attached to the e-mail Construction Management Plan & Traffic Management Plan 51983.3225.06.
Plans and drawings: the text below has words only, no drawings.
Construction Management Plan
The Hastings 15/30 Hastings St, NOOSA HEADS described as Lot 15
G TP 1 15 4
Application No: 51983.3225.06
Date: 2 February 2017
CONSTRUCTION MANAGEMENT PLAN – FEB 2017 RG STRATEGIC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 12 pages
Page 2
1 Introduction
1.1 Purpose
This Construction Management Plan has been documented to describe how the Project Management team shall
implement and conduct its allocated site management responsibilities during the Construction phase of the ‘Unit 15
The Hastings, 30 Hastings St” Project (the Project). A fundamental aim of this Plan is to ensure all construction is
properly facilitated, integrated and coordinated to deliver certainty to the objectives of the Project.
1.2 Scope of this Plan
This Plan provides a holistic approach that:
advises how the project management team will comply with the requirements of the contract relating to
construction;
defines the project objectives and targets of particular relevance to the construction phase;
describes constraints specific to the construction phase and the project in general;
describes the process for the identification and control of risks specific to the construction phase; and
details the proposed strategy for the construction phase, with particular regard to establishment resourcing,
site organisation and construction controls.
1.3 Proposed Works
The proposed works require the construction of:
Ground Floor including garage and lift – Refer Drawing DA.04
First Floor, bedrooms and bathroom – Refer Drawing DA.05
Second Floor, living, dining and kitchen - Refer Drawing DA.06
Roof Terrace, plunge pool and outside living areas – Refer Drawing DA.07
This type of construction will have several distinct phases that will require different material handling strategies to
optimise the construction works and minimise impact to surrounding streets, other stakeholders and neighbours. Our
material handling strategies and Construction planning will be consulted with stakeholders and authorities before
implementation.
1.4 Site Location
The proposed development site (refer Figure 1 and 2) is bounded by Noosa Parade and Hastings Street. The site is
known as “The Hastings”.
CONSTRUCTION MANAGEMENT PLAN – FEB 2017 RG STRATEGIC
Page 3
Figure 1
Figure 2
1.5 Contact Details
For all onsite operational and construction matters the Principal Site Contractor: Chris Smith – Builder – 0431 227
586
Project Management: Bark Designs – Lindy Aitken – 0412 127 904
CONSTRUCTION MANAGEMENT PLAN – FEB 2017 RG STRATEGIC
Page 4
2 Construction Management
2.1 Approach
The major external constraints on the project are:
Maintaining smooth traffic and pedestrians flow with minimal disruptions to Bay Village, Sofitel and The
Hastings access;
Undertaking works with minimal impact on neighbours, in particular, Bella Casa apartments; and
Ensuring Noosa Parade and Noosa Parade Service Rd are unaffected.
Upon commencement, our project team’s immediate tasks will be to:
Locate a project office, site accommodation and facilities;
Undertake a survey of the site and complete a dilapidation report of surrounding properties and assets;
Confirm the locations of existing services and obtain all necessary permits and licences and approvals; and
Arrange for the installation of temporary services – power, water and sewer to service the site works and the
amenities.
2.2 Approvals
A Development Approval has been issued for the proposed development - 51983.3225.06.
It is proposed that staged Building Approvals (BA) will be obtained from a qualified Private Certifier (PC). It is
proposed that the BA will be approved in the following sequence:
Demolition and site prep works.
Structural works for ground floor.
Structural works for first, second floor and roof top.
Services and Internal Fit Out
We do envisage that Staged occupation will be required.
The staging of the BA’s will allow works to commence, whilst affording time for those works requiring intense design
time such as structural and finishes works. The net effect is an overall reduction in total development construction
time.
2.3 Site Security
The site will be secured using appropriate fences and/or hoardings, with access gates manned with qualified security
guards/traffic control officers. The site will be secured out of hours and patrolled by qualified security guards. All
visitors to the site will be required to report to the site office, and will be appropriately inducted and registered in a
visitor’s log book.
CONSTRUCTION MANAGEMENT PLAN – FEB 2017 RG STRATEGIC
Page 5
2.4 Public / Worker Safety
All site staff and subcontractors will be required to complete a site specific induction before commencing work on site.
The induction will cover aspects relating to safety and amenity; including access, emergency evacuation procedures,
location of first aid facilities, location of amenities, site hours, material handling, noise and dust policies and
environmental management.
Prior to commencing works on site, all subcontractors will be required to submit a project specific Safety Management
Plan. This plan will be reviewed by Chris Smith Construction (CSC) for compliance with the overall Project Safety Plan.
A Safety Committee will be established during the early stages of the project. The committee will have representatives
from subcontractors and CSC. It will conduct regular inspections of the project, and will be actively involved in
reviewing Safety Management Plans and making recommendations with regard to health and safety issues.
The Contractor is to maintain access to all adjacent properties during the construction of these works.
2.5 Traffic Management Plan
To be submitted to Council for approval by the selected Contractor (Refer Appendix – Traffic Management Plan Ref
No:139614).
All temporary traffic control to be in accordance with the MUTCD.
2.6 Communications Protocol / Complaints Procedure
The appointed Contractor shall undertake a letter box drop to neighbouring properties providing contact details for
the site supervisor.
2.7 Existing Infrastructure
Existing infrastructure will be protected during construction. The selected Contractor shall clean off any debris
deposited on the road. Dial Before You Dig enquiries will be undertaken prior to all excavation works.
2.8 Fencing
The site Security Fencing will consist of temporary secure fencing – 2m high. Gates will be used on all access points
onto the site.
CONSTRUCTION MANAGEMENT PLAN – FEB 2017 RG STRATEGIC
Page 6
3 Construction Methodology
3.1 Demolition and Excavation
The site is currently The Hastings unit complex. 16 separately titled and independently owned units make up the
complex. Figure 2 presents and shows the layout and lot boundaries for unit.
The existing building of Unit 15 will be progressively demolished until bulk earthworks can commence (Refer to
Appendix – Demolition Plan DA.03).
The Demolition Plan details the two trees which will be required to be removed for demolition and construction.
Existing services within the site will be located and either capped if redundant or modified if they are to be used as
temporary services for the works.
3.2 Construction Sequence and Planning
The locations and types of plant may vary depending on the results of more detailed planning as the design solidifies
and the availability of plant is firmed up. There will be 3 distinct phases requiring different material handling logic to
construct the building efficiently and minimise impact on surrounding streets and neighbours.
The phases are:
Phase 1 Site establishment; Demolition; Excavation and pile installation
Phase 2. Structure Phase
Phase 3. Finishes and external works
Each Phase will not happen in isolation. Phase 2 and 3 will happen simultaneously once the structure is sufficiently
complete to allow the finishes trades to commence on lower levels (Appendix - Gantt Chart).
3.3 Rubbish Removal
Rubbish will be removed from site by a licenced waste contractor ensuring that it is managed to comply with Noosa
Council and their contractor’s requirements. It will be taken to the to a transfer facility.
CONSTRUCTION MANAGEMENT PLAN – FEB 2017 RG STRATEGIC
Page 7
4 Environmental
4.1 General
The objective of this section is to identify the proposed methods that will be employed to minimise the impact of
noise, vibration and air quality in the vicinity of the development.
4.2 Noise and Vibration Management
The normal hours of work will typically be 7.00am to 5.30pm, Monday to Saturday excluding public holidays. Noise
management will generally be in accordance with the QLD DEHP environmental noise management criteria. All plant
will be regularly maintained and log books kept ensuring that there are no excess noise emissions. Where it is practical,
electric machinery will be used in lieu of mechanical devices.
All subcontractors will be responsible for managing noise and vibration in accordance with their project specific
Management Plans.
It is proposed to undertake some after hour’s works for specific tasks to minimise impacts to pedestrians, vehicular
traffic or in the interest of safety. The works that are proposed to be undertaken outside of normal working hours
include the following:
Removal tree’s;
Fencing works;
Crane erection and dismantling; and
Footpath works.
All after hour’s works will be subject to the Communication Management Plan. Consultation with the Noosa Shire
Council will occur at all times prior to any works being scheduled. All businesses and surrounding residents will be
given notification via email, letter box drop and personal contact of all the proposed after hours works prior to the
works commencing which will include details of the works and the time to undertake each activity.
4.3 Air Quality / Dust Management
Dust control measures will be implemented as required, and will be in accordance with QLD Workplace health and
safety regulations and Environmental Protection Act.
Dust Management will be most critical during the demolition phase of the project, with the subcontractors for these
trades specifically dealing with dust management within their project specific management plans.
Measures that may be employed include:
Demolition – All trucks removing materials from site will be loaded whilst inside the site perimeter, with loads
covered before exiting.
Excavation – water down working surfaces as required. Minimise stock piling of material. Maintaining
stabilised access roads and driveway.
Construction – Maintain a high level of housekeeping to minimise likelihood of windblown dust.
CONSTRUCTION MANAGEMENT PLAN – FEB 2017 RG STRATEGIC
Page 8
4.4 Stormwater and Sediment Control
A stormwater and sediment control plan will be developed and will be implemented prior to works commencing.
This will ensure that stormwater from the development does not enter adjoining properties, and that all water that
enters the council stormwater system does not contain silt or other contaminants.
The following are possible solutions during each phase of construction. These options will be developed further and
consolidated into the overall management plan.
Demolition / Excavation – At the commencement of these works, screens and bunding at the perimeter of the site
where stormwater may run off will be installed. Bunding will also be implemented around stormwater drains.
Diligent housekeeping will be implemented to minimise risk of dust/debris being washed into pits.
Construction – The building slab drainage will be progressively installed and connected to council drains. Drainage
pits will be bunded or have filter cloth applied to ensure debris and silt does not enter the council’s drains.
CONSTRUCTION MANAGEMENT PLAN – FEB 2017 RG STRATEGIC
Page 9
5 Appendices
Demolition Plan
Construction Gantt Chart
Traffic Management Plan
CONSTRUCTION MANAGEMENT PLAN – FEB 2017 RG STRATEGIC
Page 10
wn
99a
10.
3.7
1.78
2tw
2.06
1.83
Existing Tree
grated 1.98
SW pit garden
1.77LL 0' 2.13
0°0
3.6
ry 8
unda 3.73
/ 1
2
1tf Bo 400
3.2
Site 11.
/ 27
2.08 2.46
0°0
3
1.8 1.79
9.48
'
Existing roof encroachment
3.7
3tw
2.21
2.21 1,996
w
Existing masonry fence to be retained 3. 73t
E 1,098
t
dui 2.21
1.85 con
2.18
Existing path to 2.11 Remove tree COMMON AREA
1.85 1.84
Hastings Street
2.34 Existing masonry fence
0.8 00'
2.11
90°
to be retained
00
h
pat 2.25
ed
pav
3tw
1.87
3.7
2.33 2.18
1.87
0' Extg Tree
180°0 2.17gl
/ 1.84 2.22co
00
3.7
2.11 2.11
1.96 Remove tree
ce 2.19
1.83 fen 2.08
ling
7.204 / 293°50'
pa
1.82
Edge of path
1.80
Roof above existing concrete
1.97 vehicle crossing
2.01 2.08
'
°00
Deck dotted over
0
RL4.75
9
2.02
UNIT 15
/
25
Retain existing crossover
To be demolished
4.0
Existing Deck Existing Internal Area
2.29 2.18
10.30 m2 36.50 m2 2.08
2.08
2.20 2.09
2.19 2.22co edge of path 2.23co
614
2.15 2.28
13.325 / 23°50' 2.29
2.23
3.73tw
2.16 existing roof outline encroachment dotted 9.45tog Existing Tree
2.21
2.16 2.19
Existing Tree
Existing Tree 2.36
2.19 2.29
1 Demolition Plan 2.20
- 1:50 Existing glolden cane
Rev Date Description Use figured dimensions
07 5471 0340
07 5471 0343
0418 876 394
0412 127 904
Email [email protected]
www.barkdesign.com.au
Australia 4567
Noosa Heads
Bark Design Architects
in preference to scale. All Project Drawing Title Project No.
A 15.02.16 For Client Review
B 26.02.16 For Development Application
dimensions to be varified
and checked on site. The Hastings, Demolition Plan 1524
These designs,drawings,
specifications and the
Unit 15 Drawing No.
copyright thereof are the RAIA Member 28409 30 Hastings St DA.03
property of Bark Design
Noosa Heads Qld 4567 Drawn By: PT
Steve Guthrie
Pty Ltd and must not be
PO Box 1355
Lindy Atkin
used, retained or copied
Queensland
Helen & George Proos Approved By: LA
Telephone
Revision
Facsimile
without the written Architects 3664 (LA)
authority of Bark Design Registration No. 3668 (SG) Date February 2016 Scale: 1:50 @ A3
B
Web
Pty Ltd.
Page 11
The Hastings Exported on 8 February 2017 11:53:44 AM AEST [OCR of page images] The Hastings CO MON OD HA BRB WN A MM NYY DY DY DYDD BSB BB sea aa aa a NO GH BB ON SF GCG WN DAB WON BS 28 Demolition Site set out Dig and pour footings Plumbing and electrical underslab Prep and pour slab Ground floor Blockwork Steel fabrication Sub floor framing Scaffold First floor blockwork First floor framing and steel work Second floor subframe Second floor blockwork Second floor framing and steelwork Scaffold Formwork Prep and pour roof top slab Window install Frame down ceilings Services rough in Pool install Cladding outside Landscaping roof top Painting outside Gyprock Lift install Dismantle scaffold Waterproofing Exported on 8 February 2017 11:53:44 AM AEST 20/02/17 06/03/17 07/03/17 09/03/17 14/03/17 20/03/17 20/03/17 27/03/17 17/04/17 17/04/17 24/04/17 15/05/17 22/05/17 29/05/17 19/06/17 19/06/17 03/07/17 17IO7/IN7 31/07/17 14/08/17 28/08/17 14/08/17 18/09/17 18/09/17 18/09/17 18/09/17 09/10/17 02/10/17 03/03/17 06/03/17 08/03/17 13/03/17 16/03/17 24/03/17 27/03/17 14/04/17 21/04/17 21/04/17 12/05/17 19/05/17 26/05/17 16/06/17 23/06/17 30/06/17 14/07/17 28/07/17 11/08/17 25/08/17 01/09/17 15/09/17 22/09/17 29/09/17 06/10/17 06/10/17 13/10/17 06/10/17 ¥ smartsheet
Page 12
Exported on 8 February 2017 11:53:44 AM AEST [OCR of page images] Bieter Duration TESA Predecessors Assigned To % Status Complete 29 Tiling 15d 09/10/17 27/10/17 30 Cabnetry install 5d 23/10/17 27/10/17 31 Painting inside 15d 30/10/17 17/11/17 32 Services fit off 10d 20/11/17 01/12/17 33, Final clean 5d 04/12/17 08/12/17 34 Landscaping downstairs 5d 04/12/17 08/12/17 Exported on 8 February 2017 11:53:44 AM AEST
Page 13
CONSTRUCTION TRAFFIC GUIDANCE SCHEME
0
117
RO D
WO AD
TC
EN
RK
Y
NOTES
EL
PRE
F
- This Traffic Guidance Scheme has been
SA
PAR
7
prepared in keeping with Evolution’s
50
117
TC
TC
IVE
and our clients’, commitment to traffic
TC
1
E TO
13
36
32
management, reporting and reviewing.
DR
2
NO
STO
- COMPLIES WITH THE MANUAL OF OS
AP 10- TC1332 WORKER SYMBOLIC (TC1332) MUTCD 3.4.4 ROAD
P
UNIFORM TRAFFIC CONTROL DEVICES AR 15m As this sign is used to warn of the presence of personnel, it
TC
WORK
PART 3 VERSION 7-1st July 2016 (MUTCD) AD
12
ES shall be only displayed when they are actually working, or are AHEAD
57
ER visible to traffic, or both, and shall be replaced with
- It is the responsibility of the Principal VIC ROAD WORK AHEAD (TC1169) when workers have left the REDUCE SPEED
and/or Contractors to ensure that all ER
OA
documentation and signage is checked 50 D
work area or are no longer visible to traffic.
and that all works are conducted in 30
accordance with the MUTCD. (Clause 1.5) m
ON
10 mi
-15 n
TC
SID
- All Signage to be positioned where
m
13
TC
appropriate space allows. (Clause 4.1.6)
25
E
13
RO
59
- Existing Signs & Traffic Control Devices
_5
AD
which are inappropriate to, or conflict
PR
with, the site SHALL be fully covered
TC
EPA
13
or removed. (Clause 2.4.4)
TC
32
RE
13
62
TO
- The use of hand held two way UHF radios
are to be utilised where required to UNIT 15
S
TRAFFIC CONTROL TO HOLD TRAFFIC
TO
communicate between traffic control &
30
P
site vehicles. (Clause 4.10.2)
m AS REQUIRED.
TC
mi TRAFFIC CONTROL AHEAD/PREPARE TO STOP
12
- Pedestrians, Bicycles, Wheelchairs & Public
n
57
Transport access to be considered where
necessary around work area. (Clause 4.14.4) SIGNS TO BE REMOVED/COVERED WHEN TCs ARE
- Traffic Guidance Scheme to be installed by NOT ACTUALLY CONTROLLING TRAFFIC.
a person with Queensland Department of
Transport & Main Roads 'Traffic
Management Implementation' Qualification
10-15
m min
LOCATION MAP Term
SITE DETAILS inatio
Area n
07
Ordered By: Chris Smith
11
TC
W OA D
Contact #: 0431 227 586
O D
R N
E
RK
Onsite Contact: Chris Smith
DRIV
Mobile: 0431 227 586
LY
Order / Ref#:
FE
The Hastings
SA
TC11
E SA
77
Term: LONG
E
11
77
IV
TC
Road Type: Two way
R
10
FELY
WOR
D
ROAD
Speed Limit: 50 kph
NO
TC11
EN
Travelled Path: PAST
Te -15 OS
K
D
rm m AP
70
Operation: Hold & Release
Workers To Traffic: > 1.2m AR
Proposed Start Date: 30/01/17 Ar inat min AD
E
Proposed Duration:
ea ion
Proposed Hours: 50
- Minimum Requirements:
1 Traffic Controller/’s
1 Vehicle/’s with Warning Device
NOOSA REGIONAL COUNCIL
LEGEND STREET VIEW 30m m 50
ACCREDITED TRAFFIC CONTROLLER
with Approved Stop / Slow Bat
in
TRAFFIC CONTROL VEHICLE
with Illuminated Flashing Arrowboard 10-15m
LATERAL HAZARD MARKER
57
either T5-Q02 (Vertical) or T5-4 (Horizontal)
TC12
P
59_4
E TO STO
TRAFFIC CONES
AD
TC13
per MUTCD Clause 3.9.1
62
O
TC13
IDE R
PROPOSED WORK AREA
PREPAR
25
32
as advised by Client
TC13
TC13
ON S
PROPOSED EXCLUSION ZONE
per MUTCD requirements
N REV. DATE DESCRIPTION TMD #: INIT. CLIENT: CHRIS SMITH CONSTRUCTION DRAWN BY: SIGNATURE:
ERIKO LUIS HALLARE
00 25/01/17 PRODUCED FOR CLIENT REVIEW 647 SJWR LOCATION: NOOSA PDE (UNIT 15/1)
REVISIONS
01 06/02/17 AMENDED AS PER CLIENT REQUEST 502 LOK CROSS ST 1: NOOSA DRIVE CHECKED BY: SIGNATURE:
STEVE JW ROBERTS
02 CROSS ST 2: WITTA CIR QDTMR TMD# 647
03 SUBURB: NOSSA HEADS TGS REFERENCE ID: TGS REVISON:
NOT TO SCALE 04
Ph: 1300 880 481
Email: [email protected] UBD MAP REF: 9:H12 139614 01
Used in these records
Construction Management Plan - Unit 15 The Hastings - 100217.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.