Council archive · source document
Construction Management Plan - Unit 15 The Hastings - 100217 · 51983.3225.06
Attached to the e-mail Construction Management Plan & Traffic Management Plan 51983.3225.06.
Plans and drawings: the text below has words only, no drawings.
The Hastings Exported on 8 February 2017 11:53:44 AM AEST [OCR of page images] The Hastings CO MON OD HA BRB WN A MM NYY DY DY DYDD BSB BB sea aa aa a NO GH BB ON SF GCG WN DAB WON BS 28 Demolition Site set out Dig and pour footings Plumbing and electrical underslab Prep and pour slab Ground floor Blockwork Steel fabrication Sub floor framing Scaffold First floor blockwork First floor framing and steel work Second floor subframe Second floor blockwork Second floor framing and steelwork Scaffold Formwork Prep and pour roof top slab Window install Frame down ceilings Services rough in Pool install Cladding outside Landscaping roof top Painting outside Gyprock Lift install Dismantle scaffold Waterproofing Exported on 8 February 2017 11:53:44 AM AEST 20/02/17 06/03/17 07/03/17 09/03/17 14/03/17 20/03/17 20/03/17 27/03/17 17/04/17 17/04/17 24/04/17 15/05/17 22/05/17 29/05/17 19/06/17 19/06/17 03/07/17 17IO7/IN7 31/07/17 14/08/17 28/08/17 14/08/17 18/09/17 18/09/17 18/09/17 18/09/17 09/10/17 02/10/17 03/03/17 06/03/17 08/03/17 13/03/17 16/03/17 24/03/17 27/03/17 14/04/17 21/04/17 21/04/17 12/05/17 19/05/17 26/05/17 16/06/17 23/06/17 30/06/17 14/07/17 28/07/17 11/08/17 25/08/17 01/09/17 15/09/17 22/09/17 29/09/17 06/10/17 06/10/17 13/10/17 06/10/17 ¥ smartsheet
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Management Plan - Unit 15 The Hastings - 100217.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.