Skip to the record
Search everything, all in one place.

Council archive · source document

Construction Management Plan - Unit 15 The Hastings - 100217 · 51983.3225.06

Attached to the e-mail Construction Management Plan & Traffic Management Plan 51983.3225.06.

of 13

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Exported on 8 February 2017 11:53:44 AM AEST


[OCR of page images]
Bieter Duration TESA Predecessors Assigned To % Status

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Complete
29 Tiling 15d 09/10/17 27/10/17
30 Cabnetry install 5d 23/10/17 27/10/17
31 Painting inside 15d 30/10/17 17/11/17
32 Services fit off 10d 20/11/17 01/12/17
33, Final clean 5d 04/12/17 08/12/17
34 Landscaping downstairs 5d 04/12/17 08/12/17

 

Exported on 8 February 2017 11:53:44 AM AEST

Used in these records

About this file

File size
3.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Management Plan - Unit 15 The Hastings - 100217.pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.