Original source · versioned page text
Attachment_A-P-EA-100375359_(MCU__OPW_and_EA_Combined)
2212-32529 SRA Attachment 2—Advice to the applicant General advice 1. Terms and phrases used in this document are defined in the Planning Act 2016, its regulation or the State Development Assessment Provisions (SDAP) (version 3.0). If a word remains undefined it has its ordinary meaning. Removal, destruction, or damage of marine plants 2 The Notice of Election for the Significant Residual Impact should be submitted to [email protected]. An Agreed Delivery Arrangement must be entered into prior to any impact on the matter of State environmental significance. Marine Safety Queensland 3. Repair or replace of any navigational aid that are damaged due to the construction, operation or maintenance of the development will be required. Any replacement or repair of aids to navigation must be carried out at no cost to the Department of Transport and Main Roads and to the satisfaction of the Harbour Master. 4. The dredging operations are to be conducted in a manner that ensures a suitable navigation channel is always open to vessel traffic, 5. All navigation lights, buoys, marks, or signs associated with the development must be supplied, installed, and maintained in accordance with The Department of Transport and Main Roads through Maritime Safety Queensland 's requirements. State Assessment and Referrai Agency Page 3 of 13 Document Set ID: 22365982 Version: 3, Version Date: 06/04/2023 Page 13 of 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.