Dog Beach Sand Nourishment Project: Marine Plant Monitoring Plan

Monitoring Plan

2.9

2.10

* Site restoration (ground works to reinstate conditions suitable for marine plants; revegetation;

pest control);

* Direct offsets (onsite/offsite fish habitat enhancement/ restoration’ rehabilitation’ connectivity!

creation); and/ or
* Indirect financial offsets.

Any changes to this monitoring plan shall be made in consultation with and approved by DAF.

 

 

 

 

 

 

 

 

Reporting
Table 2-1 outlines reporting requirements under this plan. All reports are to be submitted to and
signed off by DAF.
Table 2-1 Monitoring Report Requirements
eae ary] Prepared By
Marine plant and fisheries « Within two months of Qualified ecologist
resource assessment in construction being
accordance with this plan. completed;
« Six months following the first
post construction monitoring
survey;
« Yearly for a period of three
years after completion of the
works unless adaptive
measures and corrective
actions are implemented.
Update of this plan to reflect As required Qualified ecologist
adaptive management measures
taken, if required.
Update of this plan to refiect As required Qualified ecologist
corrective actions taken, if
required, such as:
* Site Restoration Plan, and/or
+ Offset Delivery Plan.
Final Report: summary and Once it is demonstrated after a Qualified ecologist
conclusion of the monitoring minimum of three years there is
plan. no to very low potential for long-
term impacts on living marine
plants
Finalisation

The monitoring plan can conclude after a period of three years following completion of the works and
once it is demonstrated there is no, to very low, potential for long-term impacts on live marine plants.
Conclusion of the program shall be approved by DAF.

G:\admin-share\AdminiA 10342.9.mpb.NoosaSpitSEMPdesigniR.A10342.002.00.Marine Piant

MP.docx

Document Set ID: 22365982

Version: 3, Version Date: 06/04/2023

Gam

Page 29 of 31
Log in to download the original file

Attachment_A-P-EA-100375359_(MCU__OPW_and_EA_Combined).pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.