Original source · versioned page text
RFI - Attachment 2 - Permit Environmental Authority No. EPPR01855314
Permit
Environmental authority – EPPR01855314
Records
G4 All information and records that are required by the conditions of this environmental authority
must be kept for a minimum of five (5) years. All information and records required by the
conditions of this environmental authority must be provided to the administering authority upon
request.
Monitoring and Analysis
G5 An appropriately qualified person(s) must monitor, record and interpret all parameters that are
required to be monitored by this environmental authority and in the manner specified by this
environmental authority.
G6 All laboratory-based analyses required under this environmental authority must be carried out by
a laboratory that has NATA certification, or an equivalent certification, for such analyses. The
only exception to this condition is for in situ monitoring of water for pH, temperature, electrical
conductivity, turbidity, and dissolved oxygen; and methane gas monitoring conducted as per
condition A4.
G7 The following details must be recorded and provided to the administering authority when
requested for all complaints received:
a) time, date, name and contact details of the complainant;
b) reasons for the complaint;
c) and investigations undertaken;
d) conclusions formed; and
e) any actions taken.
Written procedures
G8 The activity must be undertaken in accordance with written procedures that:
1. identify potential risks to the environment from the activity during routine operations,
closure and an emergency; and
2. establish and maintain control measures that minimise the potential for
environmental harm; and
3. ensure plant, equipment and measures are maintained in a proper and effective
condition; and
4. ensure plant, equipment and measures are operated in a proper and effective
manner; and
5. ensure that staff are trained and aware of their obligations under the Environmental
Protection Act 1994; and
6. ensure that reviews of environmental performance are undertaken at least annually.
Litter
G9 All reasonable and practicable measures must be taken to contain litter within the waste
operations area, and retrieve litter released. As a minimum, litter must be retrieved within one
business day following wind events exceeding 25 km/hour and litter must not move beyond
the boundaries of the site.
Leachate
G10 A leachate collection system must be designed by an appropriately qualified person and
installed and maintained to:
1. collect leachate generated in the landfill unit;
2. convey the collected leachate out of the landfill unit to an appropriate leachate
storage facility; and
3. restrict the height of the leachate above the liner system to a maximum level of 300mm.
Page 6 of 22 • ESR/2016/3415 • Version 2.04 • Effective: 30 JAN 2017 Department of Environment and Science
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.