sara-idas-checklist-2-material-change-of-use
The proposed material change of use of premises is assessable development under the land use Yes No
plan approved under the Airport Assets (Restructuring and Disposal) Act 2008 for the airport land,
but is not inconsistent with it.
• If yes to either of the above, a development permit is required for this aspect of development. The chief executive
of DSDIP may be the assessment manager (see schedule 6 of the Sustainable Planning Regulation 2009).
• If the proposed material change of use of premises is inconsistent with the land use plan approved under the
Airport Assets (Restructuring and Disposal) Act 2008, you are also required to refer the application to the chief
executive of DSDIP as concurrence agency, if the chief executive of DSDIP is not the assessment manager.
• You must complete IDAS Form 5—Material change of use assessable against a planning scheme.
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 2, item 4
• Sustainable Planning Regulation 2009, schedule 3, part 2, table 5, item 7
• Sustainable Planning Regulation 2009, schedule 6
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 7
Part 5—Potentially affected premises
5.1 Do any of the following apply?
A suitability statement has been given for the premises, a site management plan has been Yes No
approved in relation to the proposed use and the material change of use only involves:
• the fit-out of a building, or
• minor site excavation (e.g. post holes for open-sided non-habitable structures).
The proposed use is industrial and only involves minor site excavation (e.g. post holes for open- Yes No
sided non-habitable structures).
• If no to both of the above:
- A development permit is required for this aspect of development
- The development application will require assessment by the chief executive of DSDIP, as assessment manager
or concurrence agency
- You must complete IDAS form 24—Contaminated land
• If yes to either of the above, this aspect of development is not assessable development but it is recommended that
you provide a copy of any suitability statement or approved site management plan to the assessment manager to
support your claim for exemption if any other aspects of your proposed use are assessable development.
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 2, item 6
• Sustainable Planning Regulation 2009, schedule 6
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 23
Part 6—Potentially sensitive material change of use
6.1 Do either of the following apply?
All or part of the premises is used for, or if there is no existing use, was last used for, an industrial Yes No
activity (other than a mining activity or chapter 5A activity).
All or part of the premises is in an area for which an area management advice has been given for Yes No
natural mineralisation or industrial activity (other than for a mining activity or a chapter 5A activity).
Checklist 2—Material change of use
Version 3.0—1 July 2013