Original source · versioned page text
sara-idas-checklist-2-material-change-of-use
• If yes to either of the above:
- A development permit is required
- The development application requires assessment by the chief executive of DSDIP as assessment manager or
concurrence agency
- You must complete IDAS form 24—Contaminated land
• If no to all of the above, this aspect of development does not require a development permit.
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 2, item 7
• Sustainable Planning Regulation 2009, schedule 6
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 23
Part 7—Aquaculture
7.1 Will the proposed material change of use of premises for aquaculture cause discharge of waste into
Queensland waters (as defined in section 36 of the Acts Interpretation Act 1954) ?
No • Continue to question 7.2
Yes • Go to question 7.3
7.2 Do any of the following apply?
The aquaculture is: Yes No
• of indigenous freshwater fish species mentioned in the Fisheries Regulation 2008,
schedule 10C
• in a catchment listed in that schedule for that species for aquarium display or human
consumption only
• carried out in ponds, or using above-ground tanks, that have a total water surface area
of no more than five hectares.
The aquaculture is of indigenous freshwater fish for aquarium display or human Yes No
consumption only, or non-indigenous freshwater fish for aquarium display only, and is
carried out using only above-ground tanks that have:
2
• a floor area, excluding water storage area, of no more than 50m
• a roof impervious to rainwater.
The aquaculture is of indigenous marine fish for aquarium display only and is carried out Yes No
using only above-ground tanks that have a total floor area, excluding water storage areas,
2
of no more than 50m .
• If no to all of the above, continue to question 7.3
• If yes to any of the above, a development permit is not required for this aspect of development, but the proposed
material change of use will be self assessable development and must comply with applicable codes
7.3 Is any part of the proposed material change of use of premises for aquaculture intended to be located in
a wild river area?
No • A development permit is required for this aspect of development and this aspect of development
requires assessment by the chief executive of DSDIP as assessment manager or concurrence
agency
• You must complete IDAS form 25—Aquaculture
• End of part 7 of this checklist
Checklist 2—Material change of use
Version 3.0—1 July 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.