Council archive · source document
Referral Agency Response - Minor Change - RAP20 0003 01 [As Published] · RAP20/0003.01
20316Det - Detail Survey of Part of Lot 1 on N21830 04/03/2020
2 Kareela Avenue Noosa Heads
prepared by Noosa Cooloola Land
Surveys Pty Ltd (as annotated by
Council)
29211-SW1.1 D Civil Works: Stormwater Management March 2023
Prepared by SCG Consulting Engineers
29211-SW1.2 D Civil Works: Stormwater Details March 2023
Prepared by SCG Consulting Engineers
Amended Plans
3. The development must be amended in accordance with the following requirements
a. The built form presentation of the southern façade of the detached house must
include variation using a combination of additional colour, texture and contrasting
materials to at least 30% of the wall extending from the eastern extent of the
southern façade to the western edge of the lift well.
b. The existing sewer pipe in the road reserve is to be retained in place as part of a
non-destructive methodology for the sewer realignment to aid in protection of the
existing trees in the road reserve.
4. Amended plans demonstrating compliance with Condition 3 must be lodged with Council
prior to commencement of building works or issue of a Development Permit for
Operational Works (Non-standard Driveway and Crossover) whichever comes first.
Building Height
6. The maximum height of the development must not exceed eight (8) metres above the
finished ground level and the natural ground surface except as varied in the approved
plans relating to:-
(a) the overall height of the building at the north western corner of the first floor is not
more than 9.10m from the finished driveway level as indicated on Dwg. No SD3.04
Rev F prepared by Tim Ditchfield Architects dated 04/02/2020;
7. Certification must be submitted to Council from a Licensed Surveyor which certifies that
the building does not exceed the maximum height requirement of this Decision Notice
prior to issue of a Certificate of Classification.
Currency Period
8. The Currency Period for this development approval lapses if all conditions have not been
complied with prior to the expiry of 4 years from the commencement of this approval,
unless an application to extend the currency period is approved by Council.
Performance Bond
9. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000.00
must be submitted to Council, to secure performance of all conditions of this approval,
prior to commencement of construction. The cash bond or trading bank guarantee will
be returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right to
call upon the bond or guaranteed sum to effect compliance with conditions.
Landscaping
10. A minimum of 20% of the site must be retained as soft landscaping.
Page 3 of 8
Document Set ID: 22383616
Version: 3, Version Date: 27/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Minor Change - RAP20 0003 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 148 KB (small file)
- File type