Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Referral Agency Response - Minor Change - RAP20 0003 01 [As Published] · RAP20/0003.01

of 8

Text shows just the words. Original shows the document exactly as it was published.

                 11.    Existing vegetation in the road reserve must be retained in accordance with the
                        conditions of this approval.
                 12.    Trees to be retained must be protected from clearing or construction activities by:
                        a.      clearly marking vegetation to be retained with flagging tape
                        b.      installing protective fencing around the drip line of the vegetation
                        c.      restricting stockpiling, storage and vehicle parking to those areas which are
                                already cleared
                        d.      using low impact construction techniques around vegetation.
                 13.    The two trees identified as Euca 0.71515 and Euca 0.51208 on the Noosa Cooloola
                        Land Surveys drawing 20316Det dated 13/03/2020 must be retained.
                 14.    The alignment of the new sewer line and the decommissioning of the old sewer line must
                        be undertaken in a manner that avoids any works within the structural root zones (as
                        defined in AS 4970 -2009) of the two trees identified on the Noosa Cooloola Land
                        Surveys drawing 20316Det dated 13/03/2020 as, Euca 0.71515 and Euca 0.51208.
                 15.    Any excavation or filling works within the Tree Protection Zone (as defined in AS 4970 -
                        2009) of the two trees on the Noosa Cooloola Land Surveys drawing 20316Det dated
                        13/03/2020 identified as Euca 0.71515 and Euca 0.51208 must be supervised by an
                        AQF Level 5 arborist, whose lawful directions must be adhered to.
                 16.    Landscaping of the site must be in accordance with the Landscape Code, Planning
                        Scheme Policy 3 (PSP3) Landscaping Plants and Guidelines and must not use
                        undesirable species, as defined in PSP3.
                        Public Utilities and Services
                 17.    Any conflict between the approved development works and an existing or proposed
                        service (eg sewer main) must be referred to the relevant service authority for
                        determination prior to commencement of works.
                 18.    Any works in proximity to an existing or proposed service (eg sewer main) must be
                        carried out in consultation and compliance with the requirements and/or approval of the
                        relevant service authority.
                        Driveway and Pavement
                 19.    A sealed access driveway and crossover must be provided from the street to carparking
                        on the site generally in accordance with the approved plans. The works must be
                        undertaken in accordance with an engineering design and Operational Works approval
                        and must include/address in particular:
                        a.      A driveway crossover generally in compliance with IPWEA standard drawings RS-
                                049 and RS-050 with grades in accordance with the relevant requirements of
                                AS2890.1 and must have profile that ensure that standard vehicles entering or
                                exiting the site will not bottom down or scrape (the driveway surface or/and the
                                road pavement).
                        b.      The driveway shall be generally 3.0m wide and must not exceed 4.0m width at the
                                kerb line.
                        c.      The driveway within the road reserve must be constructed of an approved
                                pavement type.
                        d.      The works must not adversely impact on existing natural vegetation and trees.
                        e.      The works must include any necessary reinstatement of disturbed vegetation
                                along the shoulders of the driveway.




                                                                                                         Page 4 of 8
Document Set ID: 22383616
Version: 3, Version Date: 27/04/2023

Used in these records

About this file

File size
148 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Referral Agency Response - Minor Change - RAP20 0003 01 [As Published].pdf · 148 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗