Council archive · source document
22441 DA - Response to Information Request [As Published] · 132001.210331.2
Job No. 203E/194 2.0 FIELD WORK One borehole was dritled on this allotment in 1981 as part of a previcus investigation for a residential development, which did not include Park Road access, Two additional boreholes have been completed to provide design data for the present proposal. : Boreholes were drilled by hand on the steep slope and the materials encountered (sand only) are described on the racord sheets in Appendix A. At each location a dynamic cone penetrometer test (DCP) was carried out as a measure of the sand density. In this test a 9kg drop weight falling 500mm is used to drive a 30 degree tapered steel cone having a top diameter of 20mm and fitted to rods of smatlar saclion. For BH1 (1981) ‘ the penetration was measured as drop weight blows for successive penetrations of 150mm. tn the present (2004) tests, the blow count was recorded for successive penetrations of 100mm. DGP resulis are included in Appendix A. Test tocations are shown on the site plan. 3.0 RESULTS 3.1. The Site All three boreholes identified very loose sand from the surface to depths of 2.4m (BH2) to 2.7m . (BH1) over loose grading to medium dense sand. Borehole BH1 (1981) was continued to a depth of 14 metres in medium dens sand, Drilling in BH2 and BH3 was discontinued at 4 metres. DCP tesls in BH2 and BH3 were discontinued at a depth of 6 metres, 4.0 GEOTECHNICAL CONSIDERATIONS 4.1. The Site This is a very steep sand slope and the upper 2.4m to 2.7m ‘is potenilatly unstable. In an extrame event If trees were removed, the sand would adopt an angle of repose of about 30 degrees, similar fo that on exposed dunes in the Noosa areas. A minor unsupported excavation at the toe of the slape could cause a significant slip. 4.2. The Garage (BH2) 4.2.4, Genera! Comment Support to the toe of the slope by the garage removes the risk of a major slope failure. This is a significant and important structure and ils construction must, by necessity, have no impact on the slope as a whole. Any support wall requiring apen (unsupported) excavation or any construction involving significant vibrations should be avoided, A crib block wall, a reinforced earth wall or a sheet pile solution have no application on this sile. The use of a grout injected pile support is recommended. It Is understood that this solution is part of the present design. : 10096B Whaley Consulting Group (Robertson) MORRISON GEOTECHNIC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
22441 DA - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.