22441 DA - Response to Information Request [As Published] · 132001.210331.2

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Jab No. 203E/194
It is also understood that the garage roof will be used for construction material storage and the

site of a crane. The garage wall therefore will be propped at the top.

4.2.2. Design Parameters

i) Active Pressure

[
:

4

Very loose Sand

Pa = 11H;

Medium dense Sand

 

Ps = 7.2(H; +H.)

ps = 0.85 7H Ky

Where y = Soll Density = 17kN/m?
K, = Very loose Sand = 09
K, = Medium dense Sand = 0.65
il) Passive Resistance

The excavation will expose the medium dense sand where narmal Rankine pressure
‘esistance applies.

P, #70 K,

Where D = Pils depth below the excavation
y = SoilDensity = 18kN/m*
K,= 6.0

The passive pressure coefficient assumes wall friction /@ = 0.6

Propping loads can be taken by cantilever action on bored pile sunder the west garage
wall. mo,

For individual piles:-

br = 39D Kp
Pa = 1.5 yD?KpB
Mg = 0.5 70° KpB

Where B = Pile diameter

10096B Whaley Consulting Group (Robertson) MORRISON GEOTECHNIC

Used in these records

About this file

File size
4.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

22441 DA - Response to Information Request [As Published].pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.