Kidd + Co- 10 Park Road Noosa Heads QLD 4567

44

5

5.1

 

 

 

 

Figure 11-12 In Maryland, an 18-unit, three-story condominium (right) was buili on a
foundation of 168 pilings (left). The pilings allowed trees to be preserved within 1.5 m

(3 ft) of the building. The pilings also permitted a gravel-retention system under the
building to handle rain water; therefore, trees did not have to be removed for a rain collec-
lion pond, Note the low lattice that screens the piling foundation (right). The wall con-
struction was prefabricated so that no scaffolding’ was needed on the outside of the build-
ing during construciion. The citing of and views from each unit were so enhanced by use
of piers that, even (hough the developer increased the price of each unit $30.000, more
units were sold the. first, year than was originully projected. (Photos courtesy of Steve
Clark, Brentwood, TN.)

Diagram 2- showing the use of pier foundations for construction close to trees.
(Harris 1999, page 323)

Site Slope Stability.

The report by Morrison Geotechnic (dated 10" of February 2004) states a site
slope of 31 degrees from the rear boundary to the front boundary. In the
previous development Morrison states that the rear garage. wall was intended
to support the dune slope, and that this removes the risk of a major slope
failure. Morrison also notes that the slope where the residence is to be built
(almost the same foot print as the present design by Kidd + Co Designers)
could slump from 32 degrees to 30 degrees under dry conditions and loss of
vegetation. Vegetation retention above the garage retaining constnuction is
therefore required as part of the slope stability.

Conclusions

Tree No 57

This tree is the property of Noosa Shire Council, therefore any risk assessment
of the damage caused by the sewer line construction is their responsibility.
There is the major possibility that the trees’ structural integrity has been
severely compromised by the loss of the tension roots during construction of
the sewer line, therefore requiring removal and replacement due to the high
target value present. Any further assessment of the impacts of the driveway
construction therefore cannot be undertaken until council’s final-decision on
the tree. ,

 

Leaf and Limb Horticultural Consultancy ©
Prepared by Samuel Cowie = - . . : 7" of May 2007

Used in these records

About this file

File size
4.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

22441 DA - Response to Information Request [As Published].pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.