Kidd + Co- 10 Park Road Noosa Heads QLD 4567 ; 10 5.2 5.3 5.4 6.1 Garage Construction & Trees No 47, 48, 49 & 50. Currently tree No 47 is dead, therefore its interaction with the proposed — development is nil. Removal of the tree will be required prior to construction being undertaken, but due to slope stability issues retention of the stump and major woody roots will assist in erosion control. Planting of a replacement tree after construction is the best course of action. : Tree No 50 is in very poor condition, as the canopy has died, resulting in epicormic growth off the main trunk. Long-term retention of this tree is not viable. Removal (stump retention) and replacement with a suitable tree after construction is therefore the best course of action. Trees No 48 and 49 are is such close proximity to the excavation of the garage and lift construction that massive lateral root loss will result in either tree decline or death. As the garage/lift construction will support the slope after construction, the removal and replacement of these two trees is the best course of action. . Building Foundations Given the use of pile/screw pile foundation using the friction method instead of pads due to slope characteristics, installation of the foundations will have very little impact on tree root systems and the trees’ long-term retention on site. The retention of the trees above the garage construction (aside from Trees No 47, 48, 49 & 50) is required to assist in the stabilisation of the slope. It should be noted that several small trees or large shrubs currently occupy the foot print of the proposed development, if removed, their stumps and roots should be left on site for erosion control. The construction of the house along the top of the piles will help minimise disturbance to the soil surface, thus enabling minimum disturbance and retention of all trees after foundation construction. , The use of the tree management plan documented in the recommendations of this report will assist in maintaining the trees on the site during construction. Future Landscaping Additional planting of future replacement trees and vegetation is recommended for the long-term soil stability either above or below the proposed development. This should include the area underneath the building. Recommendations Tree Management Plan. Recommendation is made that the following Tree Management Plan (TMP) i is using prior, during and after construction to insure minimum impact on all trees and vegetation being retained. Leaf and Limb Horticultural Consultancy © : . ‘Prepared by Samuel Cowie. / .7" of May 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
22441 DA - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.