Council archive · source document
22441 DA - Response to Information Request [As Published] · 132001.210331.2
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 13 e At the completion of the garage, driveway and foundation installations, the builder is to construct scaffolding (see diagram No 1) around the outside of the building to keep workers and contractors off the natural site soils. After the installation of scaffolding around the building, all traffic on the original site soils should be kept to a minimum and restricted to pathways protected with erosion control measures (eg. Jute matting). e Where scaffolding is installed around tree trunks, or construction works are in close proximity to tree trunks, the trunks are to be protected with hession wrappings. These wrappings should be sufficient enough to stop . impacts that may damage trunk tissues. All wrappings are to be secured by ties, and at no point is nailing or any other invasive method to be used. These are to be removed at the end of construction works. Protective fencing lin ~ accordance with 8.2.2 or 8.2.3) (may be attached to scaffolding) ly Platform level at {i _ first lift of brickwork Protective fencing t Toeboard (in accordance with te 8.2.2 or 8.2.3) a cq Ly jj eo woe ae Ld: Ground undisturbed and ? 4 protected by geotextile ° 1 y fabric, and side-but ting \ Protected 14 scaffold boards ‘ area H] I! ik Timber sole A plate r ————n = Lee tha, } SH Ss : | f Not less than distance - Not less than distance recommended in table! recommended in table 1 Ground undisturbed and protected by geotextite fabric,and side-butting scaffold boards (a) Initial stage : (b) Secondary stage with scaffolding - Diagram No I- showing scaffolding methods to minimise soil and root disturbance. e After installation of any floor or ground level, the site arborist is to identify any low branches that will intrude directly on the approved building structure. Any pruning required to remove low brariches that impede on the building shall be documented-and then removed by the tree contractor, as required and to AS4373-1996, _ « The area around the building shall not be used for the storage or dumping of any building materials (particularly cement based products), unless otherwise specifically designated by the site arborist and builder as above. -Leaf and Limb Horticultural Consultancy © . ~ Prepared by Samucl Cowie . . 7" of May 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
22441 DA - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.