MCU Application 11/12/2008 Page 12
under overhead electricity
transmission lines, or within
electricity easements:
AND
$2.3 A minimum separation
distance is maintained from the
electricity transmission line to the
closed boundary of habitable
building and child activity areas,
as follows-
a} 20m for transmission lines
up to 132kV;
b) 30m for transmission lines
between 133kV and 275kV;
and
c) 40m for transmission lines
greater than 274kV.
Hot Water Systems $3.7 All hot water systems Y Will comply
03 Hot water systems are installed and installed are -
@ operated to support the efficient use of natural | a) solar systems; or
resources and minimize consequent pollution | b) electric heat pump systems;
such as green house gas emissions. or
c) natural gas or LPG systems;
or
any combination of a), b) orc
Water supply and conservation $4.1 & $5.1 For a Class 1 ¥ each unit incorporates a
04 On-Site water storage is designed and Building other than a Detached 3000L water tank
operated to support the efficient use of water; | House or Multiple Housing Type 1
Relative or Employee, where
AND located outside a reticulated
water service area, a rainwater
05 On-site water storage is adequate for tank is to be installed with the
occupants everyday use and fire fighting following minimum storage
purposes. capabilities -
a) Where no more the 3
bedrooms — 45, 000 Litres; or
b) Where more the 3 bedrooms —
60,000 litres;
AND
@ ¢) There is on the Lot a dam,
swimming pool or water tank
accessible for use by the fire
brigade that contains at least 5,
000 litres of water.
Erosion and sediment contro! No solution provided
06 Development does not cause erosion or | AdvisoryNote =———C~*~«~**«SS:sé&Fril_ errcosiorn’ and sediment
result in transport of sediments off-site. ' Persons undertaking ~*~ | control will be employed to in
|, development, includings:;. %,.. | | accordance with Noosa
| building work, are required © Council requirements
under the Environmental * =**
|. Protection (Water) Policy 1997
t (EPP) to ensure that sediment
;-and other material including =
} building waste, sawdust, «
concrete, cement or paint are
-not deposited or released into
a roadside gutter, stormwater
- drain or waterway, or into a*
. place where it could. eae
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001981A9.001.pdfRelated documentPublic source context ↗
08/2093 - MCU - Mutliple Housing Type 2 - Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.