Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

001981A9.001

of 69

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

uO             MCU Application 11/12/2008                                                                              Page   37

                                                                    accordance with the Institution
                                                                    of Engineers Australia
                                                                    (Queensland Division) Soil
                                                                    Erosion and Sediment Control
                                                                    - Guidelines for Queensland
                                                                    Construction Sites.
                     [os         SSCSC~™~C~CSCSCCSCC            YN slution provided.            it   NA                    SC—*S
                       05                                           $5.1 The footing of any         ¥ NIA
                                                                    building or structure is located
                                                                    clear of the zone of influence
                                                                    but no closer than 1.5m
                                                                    (measured horizontally) from
                                                                    infrastructure including sewers,
                                                                    water mains and storm water
                                                                    structures;
                                                                    AND
                                                                    §5.2 A registered easement in
                                                                    favour of Council is created
                                                                    over all underground
    @                                                               infrastructure located in private
                                                                    property;
                                                                    AND
                                                                    $5.3 The width of the
                                                                    easement is the greater of 3m
                                                                    or the width of the zone of
                                                                    influence;
                                                                    AND
                                                                    $5.4 The easement is centered
                                                                    over the centerline of the
                                                                    infrastructure.
                                                                    $6.1 Infrastructure is designed | ~ Complies
                                                                    and constructed on the
                                                                    preferred alignments in
                                                                    accordance with Section3 of
                                                                    PSP6 Engineering Design
                                                                    Standards ~ Water and
                                                                    Sewerage.
                        07                                          $7.1 Any alterations or repair | ~“ Complies
                                                                    to infrastructure as a result of
   @                                                                the development are completed
                                                                    at the developer's expense

                        Specific Outcomes          Probable Solutions (if code assessable}   Compliance v/*
                                                   $8.1 Sewerage reticulation infrastructure is | ~“ Complies
                                                  designed in accordance with Sections 4 and
                                                   5 of PSP6 Engineering Design Standards ~
                                                   Water and Sewerage.
                                                   $9.7 Sewerage reticulation infrastructure is | ~’ Complies
                                                   constructed in accordance with Section 6 of
                                                   PSP6 - Engineering Design Standards-
                                                   Water and Sewerage and As Constructed
                                                   data submitted in accordance with Section
                                                   7 of PSP6 - Engineering Design Standards
                                                   - Water and Sewerage;
                                                   AND
                                                   $9.2 Erosion and sediment control         ¥ Complies
                                                   measures are designed and implemented in
                                                   accordance with the Institution of Engineers

                 Material Change of Use                                                                  P. Conyers & K. O’Brien
                 34 Elanda Street, Sunshine Beach                                                                       Oct 2008

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001981A9.001.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.