Council archive · source document
001981A9.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
wo. *
MCU Application 11/12/2008 Page 38
Australia (Queensiand Division) Soil
Erosion and Sediment Control - Guidelines
of Queensland Construction Sites.
012 §12.1 The footing of any structure or ¥ NIA
building is located clear of the zone of
influence but no closer than 1.5m
{measured horizontally) from infrastructure
including sewers, water mains and storm
water structures;
AND
$12.2 A registered easement in favour of
Council is created over all underground
infrastructure located in private property;
AND
$12.3 The width of the easement is the
greater of 3m of the width of the zone of
influence;
AND
@ $12.4 The easement is centered over the
centerline of the infrastructure,
013 $13.1 Infrastructure is constructed on the ¥ Complies
preferred alignments in accordance with
Section 4 of PSP6 — Engineering Design
Standards ~ Water and Sewerage.
014 $14.1 Any alterations or repair to ¥ Complies
infrastructure as a result of the development
are completed at the developer's expense.
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001981A9.001.pdfRelated documentPublic source context ↗
08/2093 - MCU - Mutliple Housing Type 2 - Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.