Skip to the record
Every meeting, every word.

Original source · versioned page text

PA3660-Coastal Hazard Assessment - 4 arakoon

of 132

Page text read automatically using OCR, there may be inaccuracies

                                                                               Project related




 Performance outcomes                                                                                              Response
 3. are designed to accommodate the berthing of one vessel only per waterfront
     residence;
 4. do not interfere with access between navigable waterways and adjacent properties.
 PO16 Development does not reduce public use of and access to State coastal land and                               Not Applicable – Application is on private land
 ensures that erosion control structures, intended to protect a freehold or leasehold
 (not State land) premises, are wholly located within the lot:
 1. except where impeded by significant buildings or infrastructure that cannot be
     removed or relocated; or
 2. for revetments the development is:
     a. in a consistent alignment with adjacent lawful revetments; or
     b. consistent with an agreement with a local government that a revetment is
         appropriate in the proposed location.
 Matters of state environmental significance
 PO17 Development is designed and sited to:                                                                        Not Applicable – there is no MSES in the vicinity of the works
 1. avoid impacts on matters of state environmental significance; or
 2. minimise and mitigate impacts on matters of state environmental significance
     after demonstrating avoidance is not reasonably possible; and
 3. provide an offset if, after demonstrating all reasonable avoidance, minimisation and
     mitigation measures are undertaken, the development results in an acceptable
     significant residual impact on a matter of state environmental significance.
 Statutory note: For Brisbane core port land, an offset may only be applied to development on land identified as
 E1 Conservation/Buffer, E2 Open Space or Buffer/Investigation in the Brisbane Port LUP precinct plan.


Table 8.2: All operational work
 Performance outcomes                                                                                              Response
 Private marine development
 PO18 Private marine development is designed and constructed to maintain existing                                  Not Applicable – Application does not include development of
 waterway banks in their natural state and not require:                                                            private marine development
 1. coastal protection work;
 2. shoreline or riverbank hardening;
 3. dredging for marine access purposes.
 Disposal of solid waste or dredged material from artificial waterways



11 April 2024         4-6 ARAKOON CRESCENT, SUNSHINE BEACH                         PA3660-RHD-XX-ZZ-RP-Z-0001         53

Log in to download the original (PA3660-Coastal Hazard Assessment - 4 arakoon.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.