PA3660-Coastal Hazard Assessment - 4 arakoon
Project related
Performance outcomes Response
PO19 Solid waste from land and dredged material from artificial waterways is not Not Applicable – Application does not include dredging
disposed of in tidal water unless it is for beneficial reuse.
Disposal of dredged material other than from artificial waterways
PO20 Dredged material is returned to tidal water where the material is needed to Not Applicable – Application does not include dredging
maintain coastal processes and sediment volume.
PO21 Where the dredged material is not needed to maintain coastal processes and Not Applicable – Application does not include dredging
sediment volume, the quantity of dredged material disposed to tidal water is minimised
through beneficial reuse or disposal on land.
All dredging and any disposal of dredged material in tidal water
PO22 Dredging or disposal of dredged material in tidal waters does not adversely Not Applicable – Application does not include dredging
impact on coastal processes and coastal resources.
Reclamation
PO23 Development does not involve reclamation of land below tidal water, other than Not Applicable – Application does not include reclamation
for the purposes of:
1. coastal-dependent development, public marine development or essential
community infrastructure; or
2. strategic ports, priority ports, boat harbours or strategic airports and aviation
facilities, in accordance with a statutory land use plan or master plan; or
3. coastal protection work or work necessary to protect coastal resources or
coastal processes.
Table 8.3: Operational work for tidal works which is not assessed by local government
Performance outcomes Acceptable outcomes Response
PO24 Tidal works are sited and designed to operate AO24.1 Tidal work is designed and located in Not Applicable – The project does not involve
safely during and following a defined storm tide accordance with the Guideline: Building and tidal works.
event. engineering standards for tidal works, Department of
Environment and Heritage Protection, 2017.
11 April 2024 4-6 ARAKOON CRESCENT, SUNSHINE BEACH PA3660-RHD-XX-ZZ-RP-Z-0001 54
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (PA3660-Coastal Hazard Assessment - 4 arakoon.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.