PA3660-Coastal Hazard Assessment - 4 arakoon

of 132

Page text read automatically using OCR, there may be inaccuracies

                                                             Project related




 Performance outcomes                                                                        Response
 PO19 Solid waste from land and dredged material from artificial waterways is not            Not Applicable – Application does not include dredging
 disposed of in tidal water unless it is for beneficial reuse.
 Disposal of dredged material other than from artificial waterways
 PO20 Dredged material is returned to tidal water where the material is needed to            Not Applicable – Application does not include dredging
 maintain coastal processes and sediment volume.
 PO21 Where the dredged material is not needed to maintain coastal processes and             Not Applicable – Application does not include dredging
 sediment volume, the quantity of dredged material disposed to tidal water is minimised
 through beneficial reuse or disposal on land.
 All dredging and any disposal of dredged material in tidal water
 PO22 Dredging or disposal of dredged material in tidal waters does not adversely            Not Applicable – Application does not include dredging
 impact on coastal processes and coastal resources.
 Reclamation
 PO23 Development does not involve reclamation of land below tidal water, other than         Not Applicable – Application does not include reclamation
 for the purposes of:
 1. coastal-dependent development, public marine development or essential
      community infrastructure; or
 2. strategic ports, priority ports, boat harbours or strategic airports and aviation
      facilities, in accordance with a statutory land use plan or master plan; or
 3. coastal protection work or work necessary to protect coastal resources or
      coastal processes.



Table 8.3: Operational work for tidal works which is not assessed by local government
 Performance outcomes                                  Acceptable outcomes                                     Response
 PO24 Tidal works are sited and designed to operate    AO24.1 Tidal work is designed and located in            Not Applicable – The project does not involve
 safely during and following a defined storm tide      accordance with the Guideline: Building and             tidal works.
 event.                                                engineering standards for tidal works, Department of
                                                       Environment and Heritage Protection, 2017.




11 April 2024    4-6 ARAKOON CRESCENT, SUNSHINE BEACH           PA3660-RHD-XX-ZZ-RP-Z-0001      54

Log in to download the original (PA3660-Coastal Hazard Assessment - 4 arakoon.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.