Development Application Part 1 of 2 - Cover Letter, Non Profit Organisation Proof Fee Calculation, IDAS Forms 1 and 6 - OPW13/0463
Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
-----::- ..,
’\ oe’-lC ’.
"r ’\
a..
\ ,\1" BLIGH TANNER
CONSULTING ENGINEERS
13 June 2013 \ Level 9, 269 Wickham St
PO Box 612 Fortitude Valley
Ref. no. 2012.164.600
OLD 4006, Australia
T +61 73251 8555
F +61 73251 8599
The Chief Executive Officer [email protected]
Sunshine Coast Council www.blightanner.com.au
Locked bag 72 ABN 32061 537666
SUNSHINE COAST MAIL CENTRE QLD 4560
Dear Sir/Madam,
PROJECT: Noosa Flexi Learning Centre (MCU 12/0133)
RE: Operational Works Application
Please find attached the Operational Works Application for the Noosa Flexi Learning Centre
(MCU 12/01336). This letter provides important notes in relation to this application
Negotiated Decision Notice
Council issued a negotiated decision notice was issued for this project on 6th June 2013,
which should be considered with this operational works application.
Earthworks into adjacent property
Minor earthworks will occur into the adjacent property immediately to the east, as shown on
Drawing C200. Discussions with Council’s Richard Hill and Ben Wallace have determined
this to be acceptable and the preferred option. The existing artificial mounding in that vicinity
will likely be removed as part of future works on that lot, and if no earthworks occurred into
the adjacent lot the access driveway would otherwise need to terminate at a retaining wall,
which would ultimately be demolished as part of future works on that lot.
Stormwater Management
The site has a unique approach to stormwater management, in order to minimise the risks of
environmental harm associated with changes to the quality and quantity of stormwater runoff.
The strategy maximises the permeability of the site, and detains and reuses stormwater
In addition to the Stormwater Management Plan (Bligh Tanner 8th August 2013), further
supporting information about the hydrology of the site is provided in an attached memo dated
10th May 2013.
Parking Facilities
The proposed parking and vehicle access facilities have been designed in accordance with
AS 2890.1-2004 and the relevant Council standards as well as the conditions outlined in the
development approval. Allowance has been made for the prescribed level of staff parking
spaces.
Charitable Organisation Status
In accordance with Section 1.3 of the Register of Regulatory Fees and Commercial Charges
for Sunshine Coast Region 2012-2013, the applicant requests a 50% reduction in the
application fee as they are a non-profit religious organisation. Please find attached
DIRECTORS I ROD BLIGH I CHRIS TANNER I PAUL CALLUM I DAVID HAMLYN-HARRIS I PAUL EASINGWOOD
/.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 1 of 2 - Cover Letter, Non Profit Organisation Proof Fee Calculation, IDAS Forms 1 and 6 - OPW13/0463Related documentApplication case desk ↗
About this file
- File size
- 12.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.