Council archive · source document
Development Application Part 1 of 2 - Cover Letter, Non Profit Organisation Proof Fee Calculation, IDAS Forms 1 and 6 - OPW13/0463
Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Noosa Flexi Learning Centre 13th June 2013 documentation from the Australian Government demonstrating that the Noosa Flexible Learning Centre is a charitable organisation. Construction Management Plan In accordance with Engineering Advisory Note 3: Preparation of a Preliminary Construction Management Plan, a Construction Management Plan will be provided to Sunshine Coast Regional Council for endorsement prior to the pre-start meeting. As advised by council, this plan will be compiled by the contractor (not yet selected) and supplied at the time of requesting a date for the pre-start meeting (minimum 5 days before the meeting). As such a draft Construction Management Plan does not form part of this package for Operational Works. Yours faithfully, Alan Hoban Principal Environmental Engineer BLIGH TANNER PTY LTO
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 1 of 2 - Cover Letter, Non Profit Organisation Proof Fee Calculation, IDAS Forms 1 and 6 - OPW13/0463Related documentApplication case desk ↗
About this file
- File size
- 12.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.