Council archive · source document
Appendix 5- Response to Planning Scheme Codes · MCU17/0027
Attached to the e-mail Engineering plans, Landscape Plan and Response to Code (Email 2 of 2) MCU17/0027 & OPW17/0119.
Specific outcomes and probable solutions for the Waste Management Code
SPECIFIC OUTCOMES/ PROBALE SOLUTIONS COMMENT
Waste separation O1 S1.1 Construction, operational and Complies
Development that generates demolition works are planned and Construction, operational and
several classes of waste is managed in accordance PSP1131; AND demolition works are planned and
designed so waste is
managed in accordance
collected, stored and
disposed of in a safe and PSP1131.
ecologically sustainable
manner30. S1.2 Adequate area is provided for on- Complies
site for the collection and separate
storage of recyclable, non-recyclable,
O2 Waste storage areas vegetative and hazardous materials in
provide for adequate their specific waste streams during
separation of all recyclable construction, operational and demolition
and non-recyclable works;
materials AND S2.1 Waste storage areas allow for Complies
the separate storage of different waste
materials for reuse or recycling by— a)
providing sufficient area to store all
recyclable material and recycling
containers required; and b) sign posting
the types of waste stored.
Design and location of S3.1 Waste storage areas are designed Complies
waste storage areas O3 and maintained in accordance with PSP
Waste storage areas are 9; Complies
located so that they are AND S3.2 Waste storage areas are
The waste storage areas are
convenient and safe to use designed and located so they— a) are
and provide for convenient easily accessed and convenient to use; designed and conveniently
and safe collection by b) have unobstructed access for the located so they are easily
service vehicles; collection of the waste by service accessible. The waste storage
vehicles; c) provide for sufficient space area will have unobstructed
for safe entry and exit and servicing by access for the collection of the
Council’s contractor without the need for waste by service vehicles and
manual handling; d) are clear of
will be clear of carparking bays,
carparking bays, loading bays and similar
AND areas; e) are clear of footpaths and footpaths and pedestrian
pedestrian access; f) are capable of access. The waste storage area
being serviced by the collection vehicle is capable of being serviced by
without impeding traffic flow; and g) have the collection vehicle without
a level area provided for the storage of impeding traffic flow. The
waste and recyclable materials in proposed development will have
standard waste containers;
a level area provided for the
storage of waste and recyclable
materials in standard waste
containers. Waste will be
collected via kerbside collection
along Grant Street. Each unit will
be supplied with a standard
green and yellow recyclable
waste container.
O4 The location and AND S3.3 For uses that do not comprise Complies
methods of waste storage a caretaker’s residence or central The distance from the storage
minimises any adverse management, the maximum distance area/s to the kerbside will not
impacts on adjoining or between waste storage areas and the
exceed 40m.
nearby properties; kerbside is— a) for Multiple housing Type
3 – 40m; b) for other uses – 70m; and
AND S3.4 Pathways used to transport bins—
a) have a maximum grade of 1:15; and b)
are free of steps, stairs or other
impediments; AND Complies
S4.1 Waste storage areas are— a)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 5- Response to Planning Scheme Codes.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.