Amended Decision Notice MCU25 0059 & OPW25 0080
Plan No. Rev. Plan/Document Name Date
MS-05069-01 D SITE PLAN & WATER ALLOCATION 21/02/2025
MS-05069-02 F LAYOUT PLAN 25/02/2025
MS-05069-03 F ELEVATION 25/02/2025
Currency Period
2. The Currency Period for this development approval lapses if all conditions have not been
complied with, and the plan of survey lodged with Council for endorsement by 19 August
2027 unless an application to extend the currency period is approved by Council.
Performance Bond
3. Security in the form of a cash bond or trading bank guarantee to the sum of $2,000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
commencement of the works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of this approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
General Conditions
4. The maximum number of vessels that may be berthed, moored or attached on the structure
must not exceed 2.
5. The use of the landing must not cause any adverse effects on the amenity of the surrounding
areas including changes to light, views, air quality and noise.
6. All structures must be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall
7. All structures must have no detrimental effects on stormwater drains and/or easements.
8. A rigid handrail must be fitted on one side of the walkway. The handrail must be of an open
design and in accordance with the approved plans.
9. No posts or vertical supports of the proposed jetty are to extend vertically from the structure
unless they provide necessary support for the handrail.
10. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
elevating a vessel above the water without Council approval.
11. There must be no electrical reticulation system carrying electricity in excess of 24 volts
beyond the revetment wall unless all switches and power outlets are positioned above the
1%AEP flood level.
12. Lighting associated with the use must be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
13. The jetty is to be used for private purposes only with no commercial operations to be
undertaken.
14. Boat repair activities are not permitted on site.
15. Wastewater and sullage must only be disposed of at approved pumpout facilities.
16. The mooring facility must not be utilised for live-aboard purposes.
17. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 2009.
Page 2 of 12