Amended Decision Notice MCU25 0059 & OPW25 0080

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

               18.    Certification by a Registered Professional Engineer of Queensland that states that the
                      pontoon and gangway is constructed in accordance with best practice methods and is
                      structurally sound must be submitted to Council. This certification must be submitted to
                      Council within three (3) months of the completion of the works. A final inspection and
                      approval of the structure by Council’s Inspector is also required. Please contact Council’s
                      Development Assessment Branch on 5329 6500 to arrange the inspection.
               19.    This approval lapses where the construction of the jetty has not commenced within two (2)
                      years of the date of issue of the approval, unless application is made and approved by
                      Council for an extension.
               20.    After completion, the proposed works must be maintained in a sound state of repair in
                      accordance with the approved plans
               5.     REFERENCE DOCUMENTS

               Not applicable.
               6.     REFERRAL AGENCIES

               The referral agencies applicable to this application are:

                Referral Status        Referral Agency and Referral Trigger                  Response
                                       Address

                Concurrence            SARA at DILGP SARA        Planning Regulation         The agency provided its
                                       at DILGP Via MyDAS2       2017 Schedule 10, part      response on
                                       at https://prod2.dev-     17, Division 1 - Tidal      15/06/2025 (Reference
                                       assess.qld.gov.au/suite   Works or work in a          No. [2506-46399
                                       / (for assistance,        Costal Management           SRA]). A copy of the
                                       contact DILGP at 5352     District                    response is attached
                                       9701 or
                                       email:[email protected]

               7.     ADVISORY NOTES

                      General Advisory Notes
               1.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
                      of the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               2.     The approval or conditions do not absolve the owner of the land from complying with all the
                      conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant
                      statues and/or statutory regulations in the execution and/or performance of said works.
               3.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               4.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Building and Construction Industry (Portable Long Service Leave) Levy
               5.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.



                                                                                                        Page 3 of 12
Document Set ID: 24095479
Version: 1, Version Date: 03/09/2025
Log in to download the original file

Amended Decision Notice MCU25 0059 & OPW25 0080.pdf · 731 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.