Amended Decision Notice MCU25 0059 & OPW25 0080
18. Certification by a Registered Professional Engineer of Queensland that states that the
pontoon and gangway is constructed in accordance with best practice methods and is
structurally sound must be submitted to Council. This certification must be submitted to
Council within three (3) months of the completion of the works. A final inspection and
approval of the structure by Council’s Inspector is also required. Please contact Council’s
Development Assessment Branch on 5329 6500 to arrange the inspection.
19. This approval lapses where the construction of the jetty has not commenced within two (2)
years of the date of issue of the approval, unless application is made and approved by
Council for an extension.
20. After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans
5. REFERENCE DOCUMENTS
Not applicable.
6. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence SARA at DILGP SARA Planning Regulation The agency provided its
at DILGP Via MyDAS2 2017 Schedule 10, part response on
at https://prod2.dev- 17, Division 1 - Tidal 15/06/2025 (Reference
assess.qld.gov.au/suite Works or work in a No. [2506-46399
/ (for assistance, Costal Management SRA]). A copy of the
contact DILGP at 5352 District response is attached
9701 or
email:[email protected]
7. ADVISORY NOTES
General Advisory Notes
1. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
of the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
2. The approval or conditions do not absolve the owner of the land from complying with all the
conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant
statues and/or statutory regulations in the execution and/or performance of said works.
3. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
4. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Building and Construction Industry (Portable Long Service Leave) Levy
5. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Page 3 of 12
Document Set ID: 24095479
Version: 1, Version Date: 03/09/2025