RFI - Attachment E - SWMP Callaghan and Toth
Callaghan & Toth
TABLE 4.1 MUSIC CATCHMENT AREAS (DEVELOPED)
Catchment Land Use Music Area (ha)
Impervious
Adjacent Industrial Catchment – former Lot Reconfiguration Model
Catchment 1a – Lots Future, 1, 2, 3 East & 4 Industrial 65% 0.68
Catchment 1b – Lots Future, 1, 2, 3 East & 4 Roof Roof 100% 0.25
Areas
Catchment 1c – Road Reserve North Commercial 35% 0.28
Catchment 2a – Road Reserve South West Commercial 35% 0.08
Catchment 2b – Road Reserve South East Commercial 35% 0.10
Catchment 5a – Lot 3 West Industrial 65% 0.44
Catchment 5b – Lot 3 West Roof Area Roof 100% 0.05
TOTAL 1.88
EXISTING & PROPOSED AREAS ON LOT 5 AND LOT 7
Catchment 6 – Camphor Shed and carpark Industrial 90% 0.06
Catchment 7 - Existing carpark + driveways – 100% 0.21
Industrial
formalising area
Catchment 8 – new pathway Industrial 90% 0.014
Catchment 9 – existing grass/gravel area Industrial 20% 0.08
Catchment 10 – new carpark area – part of grass 25% 0.05
area
Industrial
Ctachment 11 - new carpark area – existing grass 25% 0.25
Industrial
area
TOTAL 0.664ha
4.3.2 Treatment Nodes
The “MUSIC Modelling Guidelines for South East Queensland” Version 1.0 prepared by Water
by Design and dated December 2010 has been used to set the rainfall runoff parameters and
pollutant export parameters for the site.
The land use type used for this model was “Industrial” and the values in the guideline shown in
Table 3.7 and Table 3.8 of the guidelines have been used in this model. Figure 4.1 shows the
MUSIC Model layout for the site. Refer to IPWEAQ standard drawings WSUD 001 & WSUD
003 ( See Appendix C)
Bioretention Basins the existing biobasin in Lot 7 constructed in 2005 will continue to treat flows
from the existing carpark and hardstand areas and from the new proposed carpark, landscaped
areas, and pathways. The existing biobasin (BB1) in Lot 7 is 12m x 12m with a total filter area
of 144m2. The existing biobasin (BB2) adjacent Mary River Road is 3m x 8.65m with a total
filter area of 26m2. This treatment node has been updated to Version 6.2.1 MUSIC model node
and has been amended to reflect the proposed design changes to the biobasin detailed in
Section 6.0.
12
2001 Lower Mill Carpark Extension SWMP July 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Attachment E - SWMP Callaghan and Toth.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.