Original source · versioned page text
RFI - Attachment E - SWMP Callaghan and Toth
Callaghan & Toth
Biobasin 1 will be:
a. Located in Lot 7 SP173177 in the same footprint of the existing biobasin
adjacent to Cooroy Creek.
b. Designed with a filter area of 144m2.
c. Filter layer depth of 0.5m, transition layer of 0.1m and drainage layer of 0.2m and
an extended detention depth of 0.3m.
d. The size and depth of the systems have been designed in accordance with
Water by Design Guidelines and IPWEAQ standard drawings in Appendix C.
Biobasin 2 will be:
a. Located in Mary River Road road reserve in the same footprint of the existing
biobasin adjacent to Cooroy Creek.
b. Designed with a filter area of 26m2 (3m wide x 8.65m long)
c. Filter layer depth of 0.4m, transition layer of 0.1m and drainage layer of 0.2m and
an extended detention depth of 0.3m.
d. The size and depth of the systems have been designed in accordance with
Water by Design Guidelines and IPWEAQ standard drawings in Appendix C.
Grass Swales will form part of the treatment train, with two existing grass swale accepting flows
from carpark areas adjacent the buildings and one new swale diverting flows to the biobasin
BB1.
Swale 1
Existing swale located in Lot 5 formalised,
Length of 60m, top width of 4.2m, base width of 0.2m with 1 in 4 batters,
approximate grade of 1.0%.
The size and depth of the systems have been designed in accordance with Water by
Design Guidelines.
Swale 2
Located in Lot 7 one new swale adjacent the new carpark,
Length of 40m, top width of 2.6m, base width of 0.2m with 1 in 3 batters,
approximate grade of 1.0%.
The size and depth of the systems have been designed in accordance with Water by
Design Guidelines.
Swale 4
Existing swale located in drainage easement between Lot 4 and Lot 5.
Length of 40m, top width of 4.2m, base width of 0.2m with 1 in 4 batters,
approximate grade of 1.0%.
The size and depth of the systems have been designed in accordance with Water by
Design Guidelines.
4.3.3 Rainfall Data
The meteorological data used for the MUSIC Model was the data for Cooroy from 01/01/73 –
31/12/83.
The mean Annual Rainfall for Cooroy 1973 – 1983 = 1600mm
The MUSIC Modelling Guidelines for South East Queensland – Version 1 December 2010
details that Cooroy data for 1973 to 1983 should be used.
13
2001 Lower Mill Carpark Extension SWMP July 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Attachment E - SWMP Callaghan and Toth.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.