Council archive · source document
09/0152 - MCU - Mulitple Housing Type 1 - Relative or Employee [As Published] · 132009.152
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.3, 9 May 2008
REMOVAL™ DESTRUCTION OR DAMAGE OF. A MARINE PLANT: WILD RIVER AREA (i
4.14 |Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
[INo -Gotoos.15 (1 Yes
if yes, is thi is the proposed operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below)
ne The removal, destruction or damage of dead marine wood on unallocated State land, other than ina at No Oo Yes
wild river area, for trade or commerce
(ii) The maintenance of existing structures, including, for example, the following structures, ifthe | {INo (] Yes
structures were constructed in compliance with all the requirements, under any Act, relating to a
structure of that type —
* boat ramps, boardwatks, drains, fences, jetties, roads, safety signs, swimming enclosures and
weirs;
+ — existing drainage structures;
* — existing powerlines or associated powerline infrastructure
(iii) For educational or research purposes or for the monitoring the impact of development on marine o No “Cl Yes.
plants ee
(iv) For the construction or placement of structures, including, for example, swimming enclosures, safety [_] No CI Yes
signs, aids to navigation, fences, pontoons, public boat ramps and pipelines, if -
+ The extent of the removal, destruction or damage is minor; and
« The structures were constructed in compliance with all the requirements, under any Act, relating -
to a structure of that type
ci ee
(v) For the construction of runnels for mosquito control, removal of Lyngbya, seed collection for site oO No (Yes
rehabilitation or the collection of marine plants for fishing bait, or handicraft
(a) if yes to one or more of (i) ~ (v) above, does all the proposed operational work comply with any =oolnable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
(1 Yes - A permit for that aspect of the operational work is not required. Goto 04.15 [_] No - Goto (b)
(b) IF no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not
the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency.
O Yes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
oO Y@S - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries
(DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
ODPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
CINo
If no, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or
infrastructure required to support other development for which a development permit is not required or, if a
development permit is required, the permit is held or has been applied for?
O Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part 02) This application requires assessment by the Department of Primary industries and Fisheries
(DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
DPI8F is nol the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
o No - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
PA sopedi.o3 ptt eles 19m 3 PA sorties part2 iane 4s ten t F'srenes Reguaver 12955'134
Fegianen, soneduie | gait tabled om 3. Fgherrs Act 1294 soction “308 wd wer acca. Vd Bwess Ac!
2g 2 Regu'arer scvadue 2 9092 ee 29 P
JA x ovarhe'd va deca won vd Iwars Code
Page 37
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0152 - MCU - Mulitple Housing Type 1 - Relative or Employee [As Published]Related documentApplication case desk ↗
0019DC6E.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.