Council archive · source document
09/0152 - MCU - Mulitple Housing Type 1 - Relative or Employee [As Published] · 132009.152
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008 WILD RIVER AREA 415 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005? LINo -Gotoos1s [1] Yes If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be assessable? () Agricultural activities as defined under the Wild Rivers Act 2005 CI No Ci Yes (ii) Animat husbandry activities as defined under the Wild Rivers Act 2005 LINo C1 Yes Ifyes to either (i) or (ii) above, is any part of the premises in the wild river high preservation area? Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it. ] No lf.no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005? oO Yes - An application for the operational work will be taken fo be not properly made and the Assessment Manager must refuse to receive it. oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive tt (Complete Form 1, Part Q if agriculture. Complete Form 1, Part R if animal husbandry) Subject to the declaration for the selevant wild river area, this application requires assessment by the Oepariment of Natural Resources and Water (NAW). If NAW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. DIRE am th hem OM nn ghee Drage ke A 42 5 det otes wid 4.16 STATE-CONTROLLED ROAD 2 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road? (CNo -Endofsectonad ([] Yes \fyes, is the proposed operational work associated with any of the following? (Tick applicable box/es) @ (i) Amaterial change of use that is assessable under the planning scheme Ono (Yes (ii) Reconfiguring a lot that increases the total number of lots, or increases the totalnumber oflots (JNo (] Yes abutting the State-controlled road If no to either or both (i) or (ii) above, and answers to questions in this section of the checklist indicate the proposed operational work is assessable under IPA, schedule 8 - Answer (a) - (c) below. (a) Is any of the proposed operational work associated with access to a State-controlled road? oO No O Yes - This application must be referred to the Department of Main Roads (OMR) as Concurrence Agency. (b) Is any of the proposed operational work for filling or excavation? LCINo C1 Yes Ifyes, is the operational work proposed in a future State-controlled road not defined by route? No - This application must be referred fo the Department of Main Roads (OMR) as Concurrence Agency. oO Yes - This application must be referred to the DMR as Advice Agency. (c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land, through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controtled road? CI No Yes If yes, is the operational work proposed in a future State-controlled road not defined by route? No - This application must be referred to the Department of Main Roads (DMA) as Concurrence Agency. e@ O Yes - This application must be referred fo the OMA as Advice Agency. Pee ee ng any Page 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0152 - MCU - Mulitple Housing Type 1 - Relative or Employee [As Published]Related documentApplication case desk ↗
0019DC6E.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.