Br MOJODESIGN 12-10-2009 Sunshine Coast Regional Council Operational Works Assessment Branch P.O, Box 141 Tewantin. QLD 4565 Dear Sir/Madam, Re: 2007/2174 - Proposed 5 Apartment Development - 43-45 Elanda St. Sunshine Beach On behalf of my client Oak Investment Holdings PTY LTD, please find enclosed the Operational works application for the proposed 5 Apartment Development at Elanda Street, Sunshine Beach. This application is to replace a previous application - reference no. 2008/1168 — which was lodged in July 2008. The currency period of the previous application expired in August 2009. The details of the proposed development are unchanged since the previous application and we request that Council utilize the drawings previously lodged for the original Operational Works application. | understand that this is possible following discussion with Council officers, however if this causes any difficulty please advise accordingly. Also included with this application is information as requested by Councils 8 this additional information will help Council assess this new Operationa below our response to the RFI and cross referenced back to same. - 30'h July 2008. | trust that have outlined This application consists of the following documents. Completed idas Form 1 - Part A Completed idas Form 1 - Part E Completed idas Form | - Assessment Checklist Our client's cheque for the amount of $6,684.00 being app! tan Gorton Design drawing numbered 0710.202 OPW indicall ; gor parking. (Previously submitted) Contour Consulting Engineers Operational works plans 5083-OPW sheefs T — EDAW Landscaping Orawings. (Previously submitted) 8. (Previously submitted) Additional information enclosed as required by Councils Information request dated 30" July 2008. Item}: Please refer to enclosed EDAW | AECOM written response and amended drawings which addresses Items 1.1, 1.2 & 1.3. Item 2: My client has engaged the services of surveyors Max Watterson & Assoc. to provide the services required to arrange for the amalgamation of the sites as required by condition No. 14 of the MCU decision notice conditions. Details of the amalgamated site have been lodged wit the SCRC and are currently awaiting endorsement. Item 3: Please refer to enclosed tan Gorton Design drawing No. 0710 WD.203 which shows the vehicular access driveway from Elanda St. having a width of 5.5m for the first 6.0m from the kerb line. Item 4: Tne negotiated decision notice dated 28 August 2008 has deleted condition 17. item 5: Enclosed is a copy of Duke Environmental - Stormwater Quantity Management Plan for Councils records. Also enclosed is a letter of certification from Duke Environmental stating that the design submitted complies with the requirements of the approved Stormwater Quantity Management Plan. MOJO DESIGN | ABN §7 891 982 116 | PO Box 1261, Noosa Heads QLD 4567 | T +617 5447 5394 | E [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 116 pages
Page 2
Item 6:
Item 7:
Item 8:
@ Item 9:
{tem 9.1:
Item 9.2:
Please refer to ‘Spice Consulting’ drawings numbered 693-OP 1, 693-OP2 & 693-OP3.
6.1 - Roof stormwater runoff, collection and control methods are detailed on Spice
Consulting Drawings.
6.2 - All site stormwater, including the roof water drainage, discharges to the rear of the
site via a detention basin and level spreader as recommended by Duke Environmental.
No stormwater discharge occurs to the street frontage.
6.3 - Contour Consulting Engineers operational works plans (ref: 5083-OPW1 to OPW8)
(previously submitted with Operational Works Application) indicate how the stormwater is
to be controlled and discharged, consistent with the recommendations in the report
prepared by Duke Environmental. Refer to Spice Consulting drawings which shows water
tank overflow connecting into this system.
Enclosed is a copy of the ‘Stormwater Detention System Maintenance Manual’ as
prepared by Duke Environmental who are also the designers of the system. A copy of the
approved maintenance plan shall be incorporated into the Community Management
Scheme for the development as required by condition 30 of the MCU negotiated decision
notice. A copy of the Community Management Scheme shall be provided to Council by
the developer prior to commencement of the approved use.
Please refer to the Maintenance plan prepared by Duke environmental as outlined in item
7 above.
Enclosed is a copy of Coffey Geotechnics PTY LTD - ‘Geotechnical Investigations’ for the
site of the proposed new development.
Contour Consulting Engineers have prepared structural design documents for the project.
Contour's design has given consideration to the recommendations of the Geotechnical
engineers report. Enclosed are copies of the relevant drawings showing details of the
retaining wall and footing system. (Contour Drawings numbered 5083 $ 9.0 & 5083 S$ 9.1)
Please refer to Coffey Geotechnics PTY LTD letter dated 11'* August 2008 which certifies
that Contour Consulting Engineer's structural design complies with the recommendations
of the geotechnical report.
All piers, retaining wails, etc are solely located within the subject property. No consent is required from
adjacent property owners for access to their properties.
My client will arrange for the relevant consultant to prepare an ‘existing conditions survey’ as required by
condition 46 of the MCU negotiated decision notice. My client will submit a copy of this survey to Council a
minimum of 10 days prior to the commencement of any works.
My Client will arrange for payment of all required bonds and contributions as required by the MCU decision
@ notice prior to issue of Operational Works decision notice.
I trust this constitutes a full and properly made application and request that Council proceeds with assessment
of same ASAP.
Please do not hesitate to contact the writer should there be any queries.
lan Gorton
MOJO DESIGN | ABN 57 891 982 115 | PO Box 1261. Noosa Heads QLD 4567 | T +617 5447 5394 | E [email protected]
Page 2 of 2
ee
Page 3
at
INTEGRATED PLANNING ACT 1997 - Part A, Version 3.1, 3 March 2008
c xy :
Company/organisation name (if applicable) oak INVESTMENT HOLDINGS PTY LTD
Individual applicant/Contact person (if there is more than one appficant, provide additional appficant details on an attachment to this form)
Title MR lI First name [ANDREW || Last name [ouTHIE i
Postal address Ic WMg\ DES PO. BOX 1261, NOOSA HEADS. QLO 4567
Contact telephone number lo7 5447 5394 | Mobile phone number [os0o 2 22 33 94
Facsimile number i] e-mail address Soon , = Fay
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A if the application is for a mobile and temporary Environmentally Retevant Activity (ERA), complete Table A only, Then go to Q2.
L Node i) Nate ofeach local goveirimeitareain. whic e
[4
OR
Table B Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
(i) (CJ Street address / lot on plan for the premises (Appropriate for most applications including building applications); OF
(ii) ([] Street address Alot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontoon ete (Note: Loton plan details may be obtained from tite documents, a ‘Rate’ notice, or from the local government.)
(0.9. Lo
Name i
Aerie
43-45 | ELANDA STREET, SUNSHINE BEACH. QLD
Cairns)
4567 SUNSHINE COAST REGIONAL COUNCIL
3998 | RP48112
400
AND/OR
Table C Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a Jot, in water (e.g. channel dredging in Moreton
Bay) efc.)
1 r DeDAs4
Cl WGS84
[[} Other -
2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may Involve one or more of these characteristics - complete only if applicable)
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated wath awater body, watercourse or ‘aquifer (e.g. river, creek, lake, canal
{1
[1
Table F Complete if the premises are in tidal water
[1
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)
ia m? ["] hectares (Tick appicable unit)
‘Existing use of.the:premises ‘|: Z ue eee, y
4, Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop. service station, school, sugar cane farming etc.)
[1 [vacant Lano |
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overtand flow, water etc.)?
aN [x] No a Yes - Ensuro the type, location and dimensions of each easement are included in plans, submitted with the application
Lane er are a od
6, Brief description of the proposal (e.g. 6 unit apartment rt bling, 30 lot residential subdivision, a bore, aquaculture)
§ UNIT APARTMENT BUILDING
7. Does the poposal include new buildings or operational work {including any services) on the premises?
(J No
esource'enti
x] Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
®
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
No - Goto Q9 oO Yes - compile Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
9. Complete Table H for or applications involving a material change of of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.
Table H
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner Is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .
ae
10d of deliver to.
Table |
ammount Es drawings: tepors) 285 5%
Part E of Form 1
2 Covering letter
Page 5
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
3 lan Gorton Design drawing 0710 .202 OPW AUG 2007 |Peevicog.y AbmT Eo
4 |EDAW landscape drawings 0851 2755.01 -L-001, L-LE-002, [03-Jul-2008 [Revo Ave (TS
L-PP-401, L-DT-901, L-DT-902,
L-DT-903 . .
5 | Contour Consulting Engineers Op Works | 5083-OPW1, 5083-OPW2, May 08 FRevheysuy SbemiyRe
drawings 5083-OPW3, 5083-OPW4,
5083-OP5, 5083-OPW6,
5083-OP7, 5083-OPW8, Ls
[6 _ | Cheque for application fee OS 19/09 | |
\Portable- Long Service Leave (PESL) levy. capntcabie io certain bulking and construction work valued ever $60,000 Only.
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ¢ Tick box if applicable)
(CJ the application seeks a preliminary approval only;
J the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);
L] all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
{J the work is being carried out under an owner-builder permit issued under the Queensiand Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit cen be given.
11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
(1 No - EndofPana
Yes - Answer Q12 below
12. Has the PLSL levy been paid?
No - (NOTE: An application can be lodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by
the Assessment Manager before 2 development permit may be given for this application. To pay the levy you will need to complete and submit a
Notification and Payment Form to QLeave.}
oO Yes - Complete Table J and submit, with the application, the “yellow” (Local Government's (Council) / Private Certifier's} copy of the receipted QLeave Form
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier} (Optional)
Receiving officer's Reference
Fee (8) Date received name numbers
ISA
a
1
Privacy Statement
The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation {including the Freedom of information Act 1992) or as
required by Partiament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Page 6
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 Advice for completing Part A General advice ° Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The Assessment Manger may refuse to receive an application that is not properly made. ° The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only. Applicant details . If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided under the IPA. Details of the premises . The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land. * Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. instead complete Table A. je The premises may be identified in a number of ways — « Street address and lot on plan are most common and will apply to most applications. Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum such as Zone Reference or GS84 may be provided. ° The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act. . StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand. StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to DAS Guide 14 (Development on strategic port land) and the Queensland Transport (Ports) website. ° “Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding applications for prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tidal work). Resource entitlement ° Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a prescribed State resource. Schedule 10 of the integrated Planning Regulation 1996 (\PR) prescribes the State resources, including State- owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Regulation. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be property made without the required evidence. . For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made. © For State-contralled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads. * Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water mark. Owner's consent ° Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport infrastructure Act 1994. js Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the processes of the application or in the event of an appeal about the outcome of the application. . “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent). . Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises. . Owners consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary ERA.
Page 7
Poe INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 Portable Long Service Leave (PLSL) Levy The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensland. The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry (Portable Long Service Leave) Requlation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction IndustryTrainingLevy. The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act} defines the building and construction work subject to the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land. The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may be issued. The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qid.gov.au. Far further information contact QLeave (Tel: 1800 803 481 Web: www. gleave.gid.gov.au ) a
Page 8
ree —
INTEGRATED PLANNING ACT 1997 Part E, Version 3.2
Building &/or operational works assessable
against a planning scheme’
1. Nature of work that requires assessment against a planning scheme:
(C] Building work - Complete Table A Operational work - Complete Table 8
Table B
(i) Whatis the nature of the operational work?
(1) Roadworks (1 Stormwater {(C] Water infrastructure ([] Sewerage infrastructure
(J Landscaping () Earthworks (Z Drainage Works L) Signage
([] Clearing vegetation under the planning scheme Other - Specify below
Landscaping, Carparking & Access, Frontage Works, Stormwater Drainage & Detention and Infiltration System, Road
Widening & Kerb & Channel, Erosion & Sediment Control.
(ti) What type of approval is being sought? (NOTE: !f you have indicated multiple operational works in questicn (i) above and your answers to this
question would be diferent for different operational work, if may be more appropriate to provide these details in an attachment fo this form)
Development Permit (J Preliminary approval (J Both (Spocity betow)
(iii) Is the operational work necessary to facilitate the creation of new lots (i.e. subdivision)?
No [[] Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alol)
[J No Yes - Complete Table Bia)
Table B(a) ist Of
1 MCU - Multiple Housing Type 4 - Conventional
2, Whatis the dollar value of this operational work? (i.e. the total value including GST, materials and labour) |$ 0.00
4,Confirmation of 31 thsthod of lodgement |
Les lodgeme Sem Anan tate
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the
extent of any cut and fill Confirmed
OFFICE USE ONLY
Date Received Reference Numbers
Page 9
INTEGRATED PLANNING ACT 1897 Part E, Version 3.2 Advice for completing Part E General advice «+ Part A must also be completed for all IDAS development applications.» ++ The applicant is responsible for answering all questions fully and correctly, following a response there is a statement to go directly to another question. Qi A development permit authorises development to occur, while a prefiminary approval is a step in the approval process and does not authorise development to occur ' This form is also used for building or operational work assessable against the land use plan for Caims airport land or Mackay airport land. Wherever planning scheme is mentioned, take it to mean the land use plan for the airport land.
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22 Assessment Checklist m| a alt: HS a 5 Answering the acaing aoc vil assis you in determining which sections $ of the checklist mal the completed for your application. If unsure, phone or visit your local government or log onto the DIP website www.dip.gid.gov.au for help For all IDAS development applications (except thase for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this checklist Does the application seek approval to make a material change of use of the premises? ifyes - complete Section 2 of this checklist C1Yes |[x] No Does the application seek approval to reconfigure a lot? Hfyes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Hf the premises are completely within a single |[] Yes |[x]No Jocal government area assessment Is by the local government. Does the application seek approval to carry out operational work? if yes - complete Section 4 of this checklist falYes |C)No Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Dyes |fR]No if yes - complete Section 5 of this checklist Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application? if yes - complete Section 6 of this checklist Yes |[x]No Does the application seek approval to carry out building work requiring assessment against a local government planning scheme? C1 Yes |[)No if yes - complete Form 7 Part E of (DAS Application Form 1. Assessment is by the local government. Does the application seek approval to carry out building work requiring assessment against the Building Act 1975? if yes - go to Appendix 1 of this chacklist for advice on building referrals. Complete Part B of (DAS Application Form 1. C1Yes |[x]No Assessment is by a building certifier Do you wish the application fo be assessed against a superseded planning scheme? if yes - complete Form 1 Attachment 1 Yes (No Is the application for development completely or partly on Cairns and Mackay airport land under the Airport Assets (Restructuring and Disposal) Act 2008? Hf yes - Assessment is by the Dapartment of Infrastructure and Planning. Complete Form 1 Part D of IDAS Application Form 1 # the C1 Yes |&]No application is for a meterial change of use, and Part & if for building or operational work. Also, the application must be referred to the local government as Advice Agency.
Page 11
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 22
SECTION!
[HERITAGE? eae és ; e
141A 1s any part of the proposal intended to be carried out on a Queensland heritage place under the Queensland Heritage Act 1992?
[XK] No-Gotor78 =] Yes
1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
No-Gotoar.2 ([] Yes
freon 2A, iF Paguts
hahite | pent 2. tab’e 5 tem 2.
jute 8 part 1, iabie $
'REMOVING. QUARRY MATERIAL; WILD-RIVER AREA.
12 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No-Gotoar.3 [_] Yes
tan 11, 1F Ry
13 Does the proposal involve an vcnvronmertly relevant activity ry (ERAY, other than a mining 9 activity or a petroleum activity?
[X} No-Gotoats [_] Yes
IPA, schexinte 4, part {, table 2, rem 2 4 tab fi 3 i 2. table 2, dems 7 and 23. Envaoninenial Motection Act 1994, 5a
1.4 Is any part of the premises within the tn limits of a port under the Transport Infrastructure Act 1 119947
[X] No -Gotoats
CO Yes
IP Requiation. sche
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
DX] No - Goto01.8
O Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI8F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
its 2, table 2. sion 25
16 ls any vat of the premises designated for community infrastructure?
No - Go to.Q1,7
C1 Yes
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
No -End of Section 1 (_] Yes
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
Biers zs
SECTION 4° secion 4 must
[PLANNING SCHEMES 8 nboe:
41 Is the proposed operational work assessable under any State planning regulatory provisions?
(1 No Yes
If yes, is the proposed operational work assessable under the planning scheme?
[7] No - Answer 04.1.1-4.17 ([] Yes - Complete Form 1, Part € and answer 04.1.1 - 4.1.7 below
eu
Pm ATEN ET one cH
TATE-CONTROLLED ROAD, er 5
4.1.4 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No {[] Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
(1) No -Got0.04.1.2
TD Y@8 - This apptication must be referred to the Department of Main Roads (DMR} as Concurrence Agency.
sie 2, fable 3. Rem SIP Reg
Is any of the operational work proposed in a local government area listed*!' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
(] No - Got 04.1.3 Yes
41 surukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Cabootture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redtand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
=
4.1.2
If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
No
(Yes
n. schedule 2. table 3. item 4:
pis, section 46
eatvinia Acid Suifsi
EASEMENTS AND SUBSTATIONS.
413
Is any of the proposed operational work for filling or excavation?
(1 No -Go1004.1.4
[x] Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
(1) Yes - Goto 04.14
No - Answer both (a) and (b) below
(a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?
No
L] Yes
{b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 1994?
{X] No (1) Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
2 fat Wuie 2 table 2 ten 10ibi
4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No -Gotoa41.5 [_] Yes
reddit 2, table 3,
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
(PUBLIC PASSENGER.TRANSPORT. 5, & FoF Us Se Se a GS
4.1.5 _ {s any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No-Gotoa4.1.6 | [_] Yes - This application must be referred to QueensiandTransport (QT) as Concurrence Agency.
RAILWAY: SAFETY. "AND. EFFICIENCY + ne
4.1.6 Is any of the proposed operational work isted in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
x] No- Ge fo 04.1.7 Oo Yes - This application must be referred to Queensland Transport (QT} as Concurrence Agency.
a)
IKOALA CONSERVATION (outside SEQ urban pan footprint) © 2
4.1.7 ts any part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
[K] No -Gotoas2 (C] Yes
schedule 2. table 3, dem 19
IP Regulation
4.2 Is any of the vroposed operational work associated with reconfiguring a it and the reconfiguration is also assessable?
[X] No -Gotoas3 [[] Yes
4.3A Is any part of the premises in an interim koala habitat protection area?
{X] No -Gotoas.38 [[} Yes
IP Raguiation, schadule @, table 2, item 444
WEGETATION. ‘CLEARING; KOALA CONSERVATION; WILD: }RIVER:AREA x
438 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
[x] No -Goioass [[] Yes
1G
4.4 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water, and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or fake?
No -Gotoas5 [_] Yes - Answer (a) and (b) below
8. Wales 4
45 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck fo pump water)?
No Go lo Q4.6 oO Yes - (Complete Form 1. Part K,) This application requiras assessment by the Department of Natural Rescurces and Weter
(NRW). IF NRW Is net the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
Page 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000. for taking
overland flow water (other than using a water truck to pump water)?
No - Go io Q47 oO Yes - Answer (a) and to) below
D softaade [ner St td vet HEE:
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000. for taking or
interfering with subartesian water (other than using a water truck to pump water)?
No -Gowoa3 [(] Yes
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
No -Got0049 [_] Yes - Answer both (a) and (b} below
6, schedda 2 tabs
shediée 1 par 3 tube d tes
:
49 Is the proposed operational work for the following?
() For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
—] No () Yes
Act 2008
(ii) To increase the storage capacity of a referable dam by more than 10% —] No L Yes
if yes fo either or both (i) or (ii) above - (Complete Form 1, Part Xs) This application requires assessment by the Department of Neturai Resources and
Water (NRW). if NRW is nof the Assessment Manager ior the appication. the agency has jurisdiction as
Concurrence Agency.
4 fable 4. tam 4 IP Reg
2 tem iD
IPA, schedule & pari
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the PA?
IX] No -Got0 oar 7] Yes - Answer (a) and (b) below
aduie 2. table 2, i
‘A fwil river ores)
2. P46 and 17: iP Reguialion, scheduie 1. pert 3 fabia 4
ICOASTAL MANAGEMENT DISTRICT; WILD- RIVER AREA: :
411 ls any of the operational work proposed to be carried out within a coastal management district?
[X] No -cotoass2 ([] Yes
tort SIP Ragu
at 2. fable 4. Reng 4A and 3
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 19947
XX No -Gotoa412 [[] Yes
fash IP Regulation suix
4.13 ls any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
No - Got 04.14
0 Yes
4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
No -Goteas.15 [[] Yes
& i PA
Page 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22 'WIED RIVER'AREA BX" eet no gate gee Eee 4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005? [K] No -Gowosis [7] Yes ipa table t tens 16 b 2008. see 4.16 1s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road? No -Erd ofsection 4 [[] Yes 2 tem} Disclaimer: While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your reliance on this process and the information contained on this form.
Page 16
EDAW | AECOM EDAW Level 3, Platinum Building, 14-18 Duporth Avenue, Maroochydore QLD 4558 T 07 5479 4405 F 07 5479 1832 www.edaw.com.au 11th August 2008 Sunshine Coast Regional Council PO Box 141 Tewantin QLD 4565 Attention: Glen Conforti Dear Glen, Further to our discussions please find Aurora Apartments amended drawing documentation issue Operational Works 2 and written response to your information request letter dated 30 July 2008 set out below; Application Details: Application No.: 2008/1168 Proposal: Operational Works - Landscaping, Carparking & Access, Frontage Works, StWater, Roadworks, Sediment & Erosion Control Street Address 43 Elanda Street SUNSHINE BEACH, 45 Elanda Street SUNSHINE BEACH Real Property LOT: 339 RP: 48112, LOT: 400 RP: 48112 Description Planning Scheme The Noosa Plan Response to SCRC Information Request: OPW08/1168 The Information Requested: 1 Amended Landscape plans indicating the following 1.1 The replacement of non-native species plants thal are included in the Planning Scheme . Policy 3 Landscaping Plants and Guidelines (preferably from the coasta! beachfront species list). It can be noted that around the pool area a maximum 30% can be a mixture of local origin and exatic species. Non native species listed in the plan include: « Alpinia Zermumbert Variegata » Doryanthes Exelsa « Rhapis Exelsa « Dianella Stampede e Festuca Gluaca e ixora Coccinea « Liriope “Evergreen Giant” e Spathiphyllum “Mona Lisa” e =Randia Fitzalanii Response to SCRC Information Request ' '
Page 17
Response: Non native species listed in the plan have been substituted, or justified, as follows: Alpinia Zermumbert Variegata substituted with Alpinia Caerulea Doryanthes Exelsa substituted with Crinum Pedunculatum Rhapis Exelsa substituted with Cordyline petiolaris Dianella Stampede substituted with Dianella Congesta Festuca Gluaca substituted with Hardenbergia violacea Ixora Coccinea substituted with Grevillea “Superb” e —_Liriope “Evergreen Giant” substituted with Lomandra Hystrix « Request to retain Spathiphyllum “Mona Lisa” in planting palette as it is the preferred species for the following reasons: o Suitability to Location; * Designated planting is situated against the side property fence in a very shade position. "The species is designed to be lush feature planting visible from the lower floors of the apartments. e Randia Fitzalanii substituted with Mefastoma Affine Refer to Drawings L-LE-002 and L-PP-401. The Information Requested: 1.2 The replacement of all undesirable species, which include Agave Attenuata Response Request to retain Agave Attenuata in planting palette for the following reasons: co Total of 10 specimens only o Suitability to Location; * Species are situated inside individual apartment gardens around the pool area (to be included in the 30% mixture of local origin and exotic species as stipulated in SCRC Request For Information 1.1). * This species is utilised as a sculptural feature plant and is visible only from inside the adjoining apartment. o Note: Agave Attenuata have been used in new and existing properties within the Sunshine Beach area. The following property is an example; Surfside Court, Sunshine Beach, 4567. Refer to Drawing L-PP-401. The Information Requested: 1.3 The replacement of plants species thal is not appropriate to the biophysical conditions of the site as they are not tolerant to the sall conditions. These specifically include « Archontophoenix Cunninghamania ; and « €laeocarpus Eumundii Response to SCRC Information Request 2 LDAW } AECOM
Page 18
Response Plant species not appropriate to the biophysical conditions of the site have been substituted, or justified, as follows; « Request to retain Archontophoenix Cunninghamiana for the following reasons: o Suitability to Location; * The species is situated at the back of lot where the land slopes away sharply and is protected from coastal breezes. * Coastal breezes are also buffered by three-storey apartment buildings on all sides of the new development. o Note: Archontophoenix Cunninghamiana is listed in table 5.1 of the Planning Scheme Policy 3 Landscaping Plants and Guidelines for the Noosa area as an approved rainforest species. e Elaeocarpus Eumundii substituted with Efaeocarpus reticulatus Refer to Drawings L-LE-002 and L-PP-401. Should you have any queries contact me directly to discuss. Yours sincerely, fboban Albers Shohan Kain Senior Landscape Architect [email protected] Response to SCRC Information Request 3 j &DAW
Page 19
_ oan AURORA APARTMENTS - SUNSHINE BEACH LANDSCAPE DOCUMENTATION Drawing Register DRAWING No. DRAWING TITLE REVISION No. [LCO.001_ COVER SHEET __ ne ee ee ep OP i -LE-002 LEGEND SPECIFICATIONS & SCHEDULE OP2 . OP?’ L-PP-A01 PLANTING PLAN o. [9e2- i OP2 L-DT-901 IDETALS _ OP2 L-DT-902 DETALS _ ‘OP2 L-OT-903 DETALS OP2 0851 2755.01 - L-001 ISSUE: OP2 - OPERATIONAL WORKS ISSUE DATE: 11.08.2008
Page 20
1 MAC wn
(8 GRE sup
@--
34 DA jes
7 TBA
17 OWAjes
ELANDA STREET
28 DIA jas
60 TIRE
2 PAN tac
15 DUA jas
7 OlAjss
13 TIA
10 ALP cao
DRIVEWAY TO
ARCHITECTS
SECIFICATION
2 AlPae
EXISTING EOGE OF BITUMEN
EXISITNG TREE TO BE
REMOVED
2 LOM hys
2 MEL aff
3 AGAat.
3 CORD
15 HAR vio
4 AGA att
2 MEL aft
4 LOM bys
19 SPA mon
4 LOM hys
RETAINING WALL TO
ARCHITECTS
SPECIFICATION
EXISITNG TREE
NATURAL, "MARY GOL”
ROCK
4 CYA coo
2@ SPA mon
\
worn) es
.
te
Gere
es ne a amgetemee ars
toe
ARC cun
3 MEL af
262 HAR vio
11. LOM lon
1 ACMhem
38 ALP cae
8 ARC cun
EXISITNG TREE
4 SYZ bs
POOL FENCE TO ARCHTECTS
SPECIFICATION
2 ACMhem
3° LOMIon
3 ARC oun
a LOMion
1 ALPoae
6? Ds
2 CUPen
143 LOM bon
LANDSCAPE ARCHITECT
EDAW AECOM
wes rey
ATI ALDI ree
$18 DLO AVE MERCURE,
SARQOCYEORE OLD AR ANSE CONT
TELEPHONE 017 HE 008
FORME ATMO E
ane oe ry
: BRO
‘ARH Wom 008308
CUENT
KEY PLAN
NOTES
SHEET DETAILS @ a
= (H)
a
o not oe am rm i. "
Yenay a demamaigrs on 1 peat gorenuston
[Ai drcarasone peo [a ritieraan how obras Fed
"AMENDMENT / ISSUE REGIST!
acon" [Doeosonn [ae So
=i
~ Ty
PROJECT ==
AURORA APARTMENTS
SUNSHINE BEACH
TALE
PLANTING PLAN
DRAWING INFORMATION
Cee Draren Oe Seal ‘Checkat
SK [ 11.02.2008 ]1-100
‘Progect No Drawn Be toe
0851 2755.01 |L-PP-401 oP2
Page 21
*. LEGEND 4 i EDAW | AECOM 1 EXISTING TREE TO SE RETANED ' MASTER PLANT SCHEDULE ! J ao was soe = oe ll ieelaetiainaat i cee, i so RAT BULOeD PROPOSED LARGE TREE Er ; tancaooore Gat wenecoaT CODE [BOTANICAL NAME [COMMON NAME l SIZE __ [DENSITY/m2[ NUMBER “ee PROPOSED SMALL TREES TREES & PLAMS - Weegee ween ne we PROPOSED SHRUB ARC .cun [Archontophoenix cunninghamiana Bangalow palm 7.5nv 2.5rv 4m trunk heights] as shown B arabes ath PROPOSED PALM BAN int [Bank sia integritolia Coast Banksia 200L as shown. 3 siheabealeal CUP ana Cupaniopsis anacardioides Tuc keroo 200L, as shown 2 CUENT PROPOSED FEATURE SHALE ELA ret [Elaeocarpus feticulatus Bluebeny Ash 200L o as shown 4 ‘SPECIMEN GRASSES MAC tan (Macaranga tanarius Macaranga 200L . as shown 1 PAN tec Pandanus tectorus Pandanus Ex. Ground i as shown 4 BOULDERS : (3 trunks per tee @ Imtrunk :aoty MEL aff Melastoma affine Blue Tongue 200L 2 as shown 7 ‘ t O we. craven necessean WAT flo Waterhousia floribunda Weeping Lilly Pilly 200L ‘ as shown 3 : NATURAL "MARY RIVER GOLD! RIVER ROCK Bie wantin ee we eee ee ee ee er ne eat ~4 Fn anes ie ee ee Se on Jn TURE ‘ Tt KEY PLAN PLANT: MIDDLESTORY - SMALL TO MEDIUM TREES & SHRUBS ‘ bd NG WEA ACM hem «[Acmena hemilanpra Broad Leaf Lilly Pilly 45L * as shown 3 —FI— FENCE REFER TO ARCHITECTS DETAIL AND SPECIFICATION ACM smi Acmena smithii Lilly Pilly 45 2.5 1 -—TE—— TIMBER E0GE REFER TOCETAL ALP cae + [Alpinia caerulea Native Ginger 200mm 3 316 COR pet Cordyline petiolaris Patm Lily as shown 6 ee OeNaIEne rime GOR rub Cordyline terminalis rubra Palm Lily 200mm 3 28 CYA coo Cyathea cooperi ‘Tree Fem 45. as shown 10 : SYZ leu Syzygium feuhmanii Riberry 45L as shown 15 NOTES GENERAL NOTES: SYZ cas Syzygium "Cascade" [S. leuhmanii x S. wisonii 45L. as shown 13 1. Nlsawce locaton shown are indetve ony, Refer to fo engheers desing for mare SYZ pan ‘Syzyium paniculatum minor 'S. australe 45t ‘as shown 4 detail Contem service loca tons an site prior © any consmucton 7H ” _ @ 2, Refer w Engineers drags fr fished surlace Lvebs unless chow on Landscape Oras 7” -~ ee ~ | @ “* . ' 3. All setout on sie to be by buider end confirmed by landscape architect prior to any constuction, a eles to Elect Consutant and Eel om UNDERSTOREY SMALL SHRUBS, GRASSES & GROUNDCOVERS orig fer Beene Coneitana end Evil Exgnoas Orgs AGA ait Agave attenuate Centurt Plant 300mm 3 10 5, Allirees win / adjacent i> vehicle sightines are 0 be fet out on site pri’ io nstatation and CRI ped ‘Crinum pedunculatum River Lily 300mm as shown 3 Sprrvedby ie nesinendent and Yel engres, DIA con Dianella congasta Beach Flax Lilly 740mm 3 155 6. Fina) planing localion and nunburs subject 1 fred services cations DIA jes [Dianella caerulea “Little Jess” Form of D. caerulea 140mm § 343, ‘surtacet) i architects specticaton IGRE sup Grevillea "suparb” IG. banksii x G, bipinnatifida 200mm 3 18 7. Al wats ond hand: doot cod hagtiape (eaade eapahsend denny “e bal HAR vio Hardenbergia violacea Native Sarsparilla 140mm. 5 371 . LOM hys + [Lomandra hystrix Matt Rush 140mm 4 M4 8, Al swales and stom water pita het perfor a stonnuatr functon onsea are tbe instal by = he able one wargineoe Tpocikavon Alaeshob indices emcee poe " LOM lon Lomandra longifolia Long-Leaf Matt Rush 140mm. 3.5 176 approved by the censuling engineers end nsiatedby the bute. Laycutte be epproved by SPA mon ‘Spathiphyllum “Mona Lisa” 200mm 3 120 tendscape wchtec in carhecion wf so angno TB jul Tibuochina “ules” 140mm 4 140 | ee . ae . a Sos peewee ee mere ees nee rea ter eat TECHNICAL SPECIFICATION *F os wets he meee eed - NOTES; i 7 a | ee \ awort topes 1. Efsure Crowns of ali grasses (Dianella, Lomandra etc) are kept clear of all mulch. ~ | ne ‘All work to be camed out by sutably qualified vadesman with experience in Landscape Construction works. All planting works ore to be cared out by 8 CALI registered fandscape conuactor. ar cs T 2 1 — - 12 WEEO ERADICATION Herbicide: Eradicate woeds using environmentally accoptable methods, such as 2 nan-rasidual glyphosate herblokde in any of its registered formule, at the recommended maximum mie. k | 13 EMBANKMENT STABILISATION * Stabilise ambankmonta exceading 1:3 with an approved biodegradable fibre mintoroad lightweight polymer mesh (Envirosiat netling or approved equivalent), Re 14 CULTIVATION A Break up the subsollto a depth of 150 mm. Ws TORSO Supply and insta 300mm topsoil depth to all planting bods and 100mm tapsoil depth to af turf araas, Imported topsod shell be from an approved supplier cenilying specified composition. Topsot shall be imerpreted 08 508 which contains organic matter, supports plant lie, is free of unwanted matter such as stones ovat 25aWn in diameter, clay lumps, woeds and weed propagules, lee roots, sticks, aubbish, materials e taxie to plant growth and the Lika, complying with AS 4419. Topsoil mix and nutrients tavels are to be optimised (or use with the native species shown on the dawings, wos SHEET DETALS 16 FERTILISER Fenilisa a¥ plants with orpanic based saw relense fortiisar, Release perod is toa minimum 6 weeks, Ferttise wrt wih Nitrophosha Blue 7.6. al # rate of 1kg/2Gm2 over prapared turf base, Top dress tur with Natcam at tha rate of 1kg/40mz at the end of the maintenance panod. WW TURF Turf species shall ba ‘A’ giada Wintergreen tur, The turf shall have 90-05% of the species type specified, The remaining percentage may contain grass species other tan the specified type. No broad teaf species am acceptable. Upon plicement of topsoil bring suriace to smooth even grades, free fram mounds and hollows such that the whole surface drains in acconiance with the finished design loves, Protect newy tured areas against traffic unti turt is established, When turf @ established mow al regular intervals to maintain an average height of 30mm. Remove weeds that emerge in the tuifed areas. (be aot gente bar a donarg Vetly ol darsiors on 3 pee tocetesnasn 18 TREE SUPPLY ‘Ai cinaralore are i roots tees Gouciny rhe Selection, insialoton and maintenance of all wens wil by of the highest qualdy. All trees wil be obtained from a QALI ragistarad supper with an A Approved Quafity System Trees AMENDMENT ISSUE REGISTER will conform with Naispec Guidolinas for Growing Trees by Ross Clark. Tree wil conform to the requirements of PLANTING’, Trees are to be single trunked with a vigorous central leader and healthy branching ; ins |Descreten aw _ [Sion structure. foes [OPERATIONAL Wars: loner [or __[OPeRATiCN WORKS voce 19 PLANTING ‘Supply plants In weed-froe containers of the required size. Open rooted siock is not to be eupplied. AR plant are to be healthy and vigorous, Root bound, ditea zed and poor stock will not be acceptod, 1490 MULCHING Provide 25mm graded hoop pine muich from an accredited mulch suppber, Place mulch to the required depth, clear of plant stems, and ake to.an even surtace flueh with the surrounding finished levels, Spread and rol mulch 50 that afta sailing, or afer foling, tis smooth and evenly graded between design surtace levels sioped towards the base of ptani stems in ptntation beds, and not closer to the siem han 50 mm. Mulch depth to be 75mm, 1a STAKES AND TES Provide stakes and tics #8 required to suppon and protect teas AUG 251 Uees- tna, 25 x 25 x 1800rmm hardwocd stakes Zl pee ine Devi (eterna AURORA APARTMENTS 100L tee - 2n0. 60 x 60 x 1800mm hardwood siakes Stakes to be embedded 600mm into the ground. SUNSHINE BEACH 442 ROCKWORK Provide rounded sandstane bouklers ranging from 300- 700mm in diameter 10 edges of rock channels and to festure rock Walls shown on tha drawings and devas. Provide 50mm - 150mm rounded washed river gravel to the base of all rach channels tu tnesied on Ow amine and eats LEGEND NHAC dn we concrete paw Aciects detland apecfeoton SPECIFICATION & SCHEDULE 444 SAMPLES Provide repmsentative samples of all materiais (0 be used fn the landscape works (sod, mulch and swale fockwork} @ minimum of 15 working days prior to their incorporation nto the works. All plant materiatis to be available for inspection end approval prix im dekvery to sits. DRAWING INFORMATION Dean ‘Orwmn Dee ‘Seale ‘Checked sx [= 1109 2008 | $:100 Projecto. Drawing Ho te 0851 2755.01 |L-LE-002 OPp2 145 ESTABUSHMENT The pisriang establish ment period cammences 81 the dete of practical completion fora period of 13 weeks. Thi 1 he planting period, carry out work mewng, weeding, rubbish removal, feriising, pesi end disease control reuing, saking and tying, replanting, aulvatng, pruning, hedge ckpping, aerating, reinstatement of muich, renovating, top dressing, and hesping the he neat and tidy,
Page 22
HWD STAKES AS SPECIFIED, MIN 2.80
PER TREE, ENSURE STAKES ARE.
FIRMLY SECURED MIN 600mm (NTO
GROUND
{ TYPICAL TREE PLANTING IN GARDEN BED
‘SCALE 120
—— 100mm LAYER OF MULCH AS
WITH SURROUNDING MULCH LEVELS IN
GARDEN BED, FOOTPATH AND SUB SURFACE
AGGREGATE BY CIVIL CONTRACTOR
5 ‘OR AS SPECIFIEED, REFER TO
KERB BY CIVIL CONTRACTOR ‘SURFACE FINISHES PLAN,
50mm WIDE GREEN RECYCLED TIE AS. SPADE CUT EDGE 10 TREE ATS
‘SPECIFIED WHERE SPECIFIED. REFER TO
SURFACE FINISHES PLAN
100mm LAYER OF MULCH AS SPEGFED,
KEEP MULCH CLEAR FROM TRUNK OF
TREE, MULCH TO BE FLUSH WITH
‘SURROUNDING MULCH LEVELSIN ‘TURF AS SPECIFIED. MN 100mm
GARDEN BED. TOPSOIL TO TURF AREAS AS
SPECIFIED
BACKFILL TREE PIT WITH MOOD SITE
TOPSOIL AS SPECIFIED, FORM
SHALLOW BERM TO TRUNK FOR WATER
RETENTION, TOPSOIL TOEXTEND MK
300mm DEEP THROUGH GARDEN BED pu
‘AS SPECIFED Ud NOTE LDA,
oY Yes CAG
150mm CULTIVATED SUBGRADE Aipefety
Chih,
BACKFILL TREE PIT WITH MOOIFIED he,
EXCAVATE EACH TREE PIT TO ALLOW SITE TOPSOIL AS SPECIFIED, FORM 7 N72)
FOR MIN 1m OF SITE TOPSOIL TO BE SHALLOW BERM TO TRUNK FOR “oy oY OG,
INSTALLED. TREE PIT MUST BE MIN3OO WATER RETENTION, TOPSOIL TO. Lops Vo7
LARGER THAN ROOT BALL ON ALL ‘EXTEND MIN 300mm OFEP THROUGH Obed
SIDES. GARDEN BED AS SPECIFED Ay At a (
LNs
CULTIVATE SUBGRADE TO MN 150mm
DEPTH
SUBGRADE AS PROFILEO BY CML
CONTRACTOR T
2 TYPICAL TREE IN TURF
‘SCALE 1720
100mm LAYER OF MULCH AS SPECIFIED.
KEEP MULCH CLEAR FROM STEM OF PLANT.
MULCH TO BE FLUSH WITH SURROUNDING
MULCH LEVELS IN GAROEN BED.
PLANT AS SPECIFIED - REFER TO PLANTING
PLANS, PREPARE PLANTING HOLE 100mm
OM Me OY,
Ae Ye
BACKFILL TREE PIT WITH MODIFIED Ti
EXCAVATE EACH TREE PIT TOALLOW SITE TOPSOIL AS SPECIFED. FORM Geen A
ABR. FOR MIN m3 OF SITE TOPSOL TOBE ‘SHALLOW BERM TO TRUNK FOR PUA AV, f,
A INSTALLED. TREE PIT MUST BE HN'00 WATER RETENTION TOPSOL TO Neg y WH,
LARGER THAN ROOT BALL ONALL EXTEND MIN 300mm DEEP THROUGH CHA vara
SIDES, GARDEN BEO AS SPECIFED MMi MN edibibe yee
ey upp ies
CULTIVATE SUBGRADE TOMN 160mm y M
HWD STAKES AS SPECIFIED, MIN 2 No.
PER TREE, ENSURE STAKES ARE
FIRMLY SECURED MIN 600rmn INTO
GROUND.
‘SOmm WIDE GREEN RECYCLED TIE AS A
SPECIFED
SPECIFIED, KEEP MULCH CLEAR FROM
TRUNK OF TREE. MULCH TO BE FLUSH
OEPTH, = eat
SUBGRADE AS PROFILEO BY CML
f} CONTRACTOR
anne
LANOSCAPE ARCHITECT
EDAW| AECOM
(3) TYPICAL TREE ADJACENT PAVEMENT
‘SCALE 1:20
wer ener
-PLATUNGULONG REE
a POT seauNe
NAAOCCHYOCRE CLD ats ‘sm 008T
TREE 667074 ak
Fae G18 1D
ua
mraibacanemnconel =
. Recre
Aan ecm
HWD STAKES AS SPECIFIED. MIN 2 Ho TUIENT
PER TREE. ENSURE STAKES ARE
FIRMLY SECURED MIN 600mm INTO
(GROUND.
‘SOmm WIDE GREEN RECYCLED TIE AS N ty4y 1 A
SPECIFED o ae ES .f
YOOmm LAYER OF MULCH AS . . .
SPECIFIED, KEEP MULCH CLEAR FROM
TRUNK OF TREE, MULCH 70 BE FLUSH
WITH SURROUNDING MULCH LEVELS IN “KEY PLAN
GARDEN BED.
KERB BY CIVIL CONTRACTOR
NOTES
EXCAVATE EACH TREE P{T 10 ALLOW
FOR MIN im3 OF SITE TOPEOM TOBE
INSTALLED, TREE PIT MUST BE MAN 300
LARGER THAN ROOT BALL ON ALL
SIDES,
CULTIVATE SUBGRADE TOMN 150mm
DEPTH,
SUBGRADE AS PROFILED BY.OML
CONTRACTOR
-_
‘SHEET DETALS _ @
DEEFER ANO 100mm WIDER THAN ——— ™*
POT BACKFILL WITH PLANTING MIX . wou OO var eet
AS SPECIFIED ENSURING SOIL IS é : -
LEVEL AROUND BASE OF PLANT. ‘ t af
100mm MULCH OISH DRAIN TO i 4 ut
BASE OF EACH PLANT { Veutyct aeretons ora wb sorehacon
Kies te redlomates wae ere fe
i i "AMENDMENT /ISSUE REGISTER
300 DEEP TOPSOIL AS SPECIFIED ae Treso [Dever = eso"
oo fort [oreRanonac Worms jeneras
i [ora __[OrEAATIONA. WORKS free
i
i
4
‘
t
f PROJECT
t AURORA APARTMENTS
. SUNSHINE BEACH
1
SUBGRADE AS PROFILED BY CML ‘
CONTRACTOR - TITLE
150 DEEP CULTIVATED SU8GRADE AS: , DETAILS
SPECIFIED .
4 NATURAL GROUND PLANTING - TYPICAL DETAIL
SCALE 1:10 DRAWING INFORMATION
Dos Dawn oaw [Sea checkaa
{ sk a 11.08.2008 | AS SHOWN
t Trop Daarate Treo
j 0851 2755.01 L-DT-901 OP2
Se
‘gee. & OO
Page 23
i LANDSCAPE ARCHITECT
i
EDAW | AECOM
PLANTING AS SPECIFED
45 x 45 x 600 HWD STAKES AT 1750 CENTRES PLACE CLOSER TOGETHER
ON TIGHT RADH
19 x S0mm HW TIMBER EDGE WITH 45x45x600mm LONG
HWW TIMBER STAKES LOCATED AT MAXIMUM 1500 CCS,
PLACE ADDITIONAL STAKES ON CURVED CORNERS TO
t MAINTAIN EVEN CURVE,
TIMBER EDGE, SIZE AS SPECIFIED, NAIL FIXED TO STAKES
AS SPECIE JOIN TIMBER EDGE WITH 194 75 x 450mm LONG HW
JOINER GALVANISED NAIL FIXED TO EDGING
‘ KEY PLAN,
TURF AS SPECIFIED
MULCH AS SPEGFED.
TURF AREA AS SPECIFED
75 x 15 x 450 JOINER TIMBER NAIL FIXED TO EDGE TIMBER JOINER
TIMBER TO BE FINISHED 25mm BELOW TOP OF EDGE TIVBER. PLANTING AREAS AS SPECIFIED
NOTES
‘SAW CUT AT REGULAR INTERVALS TO OUTSIDE CURVE OF TIMBER EDGE.
‘TO ACHIEVE TIGHT RADI.
SCALE 1:10
(4) TMBER EDGE - TYPICAL PLAN “ (2) TIMBER GARDEN EDGE - TYPICAL SECTION
4 i
SCALE 1:10 7
_ = ome *
. : SHEET DETAILS
} ee eee _
Ee
20 Gate
‘AMENDMENT / ISSUE REGISTER
Tasca [Descronn [ean Jom
“| 2
t ore OPERATIONS, WORDS Tier
rt
| ‘
PROJECT
AURORA APARTMENTS
SUNSHINE BEACH
THRE
DETAILS
t
DRAWING INFORMATION
Dem Dan [oa Sea Cracks
SK |e 11.08.2006 | AS SHOWN
Drawing Ne Tas
Project.
0851 2755.01
Page 24
PLANTING IN MULCH WITH BOULDERS. TO BE PLACED IN NATURAL OUTCROPS TO ACHIEVE A NATURALISTIC EFFECT AS SPECIFIED SCALE 170 G) SECTION A - DETENTION BASIN ROCK RETAINING WALL TO ENGINEERS DETENTION BASIN 70 ENGINEERS. REFER PLANTING PLAN FOR SPECIES, DETAIL AND SPECIFICATION DETAIL AND SPECIFICATION WITH TURF LOCATIONS, TYPES AND QUANTITES. SURFACE TREATMENT TURF SURFACE TREATMENT TO LEVEL SPREADER TO ENGINEER'S DETAL& SPECIFICATION nates PLANTING TO PROPERTY BOUNDARY AS SPECIFIED LANDSCAPE ARCHITECT EDAW | AECOM wma EEK PATI BLDG RENE eM OLPCRTH AE NELSOUE NACHOS CLO 688 arene ome TELEPHONE 01 7 6070 FORME TEED wa ercheceteines ah anor ADL oD eA CLIENT KEY PLAN. NOTES PROJECT AURORA APARTMENTS SUNSHINE BEACH THLE DETAILS DRAWING INFORMATION se [x |ttwams [as sian 0851 2755.03 07-803 Ope | a,
Page 25
landscaped bank © 13°[email protected] { Tse fence 2s ched, ofr o dota dug,
TT ow «=. 1.0m high handrail {also shown on Plans balow)
tf stone SE] as eched. \
vas | ee
tched.
up— U1 8 U2 PATH fet saring vee
— 1 U2 PATH | a
(Ox136 conc. with exposed agg, a a
in “owe 71
LANDSCAPING 1 be of roof over
‘ew 1.5m wide cone, path Tow 53.500 . uum! ‘tm high handrail as sched.
in eer? tanoscarinc || 7 masonry block wal t eng. l wep, ae hes oe ! [ Pr cone cok to ong ©
ploase rotar to the MCU LANDSCAPING Qe SL Boot oon + Pel) ne 5 ope
mY Jape ine ottbinead over Eine of foor by. owe LIVE ' ——
ten [fT aos y Lo — walor connection required to tdge tes ' — | -
! guy - : eS
B] [7 rater to Hye Eng. dwgs. . 1 Tr t z {|
Bie Et opel |_| 7 : UNIT 4 witbestonr >: |
& my TO a U2D10 ~ U7 : 4 [FFL51850] ; A <— im high handrail as sched.
“ITT pooL2 ) fon HALL :] KIT |e FA | fru (DECK): if
i | . ey ties L-4 ; | [NoTE:FORJONERY DETALS, PLEASE | : Tes
iS i {refer to detail dwg. : cigs ‘_«_| [REFER TO 800 DRAWING SERIES ! £
| | J 8 fish as ached. a | = aber eae as ached, eer
400 w ‘ 5 4 ae
‘oe | UH oy gin al itl t
l J j ae | rater to Hyd. Eng, : |pantey [fe lox . ] €
sched. wi EIS i | tes | lie 7ssherahanthal of el rf el st al st off : Yo T
_ LF tet Ye
Y _ = eT TE Ae
= et : SD iPSsrce e
@ U4 + US PATH TN _[entry.pat Patt | Mie ann aaa
uP: ' beel\- } : : }
” cde cove. with exposed 439 tes UNIT 2 : : ‘il.
_ :
= kK ©
Ef & one SH) uve ‘ ||vewe) DECK! | |
o i fies ties oye “oat :
5 Z LANDSCAPING yh fies 6)
i D NOTE: FOR JOINERY DETAILS, PLEASE ine ot _y: | a5 etep) tas >
<{ =§ © REFER TO 800 DRAWING SERIES bord over TS TD enna =P
i g ‘ a ‘ 4
z . =
C) © meee Im high handral low wal as exhed, | = ceed Ee A ©
18ON i : :
| r { z
new 1S wide con. | POOL3 Tian Fey pase TT Bs | Hoop
ath in accordance to eng. { cut MN 57 sshachanhdaleesidal2yy i
<< <— with SCRE 1 (rte to dota wg.) d ipy eer yo I a
requirements / + finish as sched, o| iH 6\ weqiaiai ni STUDY : 2 :
please refer fo the MCU g Ses ‘Th. ; :
teter to Z : se bat sy ts x ab = tes he
J 400 w stone |. refer to Hyd. Eng, alwoe tf i
v ! JOTE: FOR JOINERY DETAILS, PLEASE | am ky '
wall es sched. {4 FIT! 1.amh poo! fence i" us oe | Il mech vent to PAR to AS16682 - AEE TO eae OES PL : DECK: |< 1m high handrail as sched.
L | J TOW s3.590 aa o. : = refer to Mech, Eng. dps. ties -
USPATH®), [face ; UNIT 3 - @
ra
ine of : .
tt butthead over 7) 4 i
fi UVE fk ! fal
bt F : tes af = =] oop
TS Seopa TT "Hope T A
Spe. : | | 1 La cone. cot tng, <A> oo
: ae 1 [juss 4
Tay Ase Soe! | U sm high heparall 2s eched.
ae —o
ems _ _t
7 tne ctroot over
cure USKITCHEN BULKHEAD | | masonry Mock taining wal to eng, below |
DETAIL SECTION - refer to} | <— (also shown on Level 1 Pian) :
Big a) g WD.604 for detat u . afar to dat tg,
Fou 60* = masonry block fence to eng. tember fence as sched. tg :
Se (io chowan Pere tt] (en Psat] ba
New Footpath to [ PLANTER PLANTER PLANTER LANDSCAPING —o 7 . r 9.76 r x T I 1 = :
54 vwith existing In t i oan i
Fea “ew sa0e TOW 52.750 TOW 52.850 TOW 52.150 & ® ® 223°00' © 0) { iz
gras se oye aie > : AND TIMBER FLOOR NOTE: WATER TANKS TO SE PLUMBED TOALL NOTE: PLEASE REFER TO REFLECTED CEILING | =
of frontage works. kno of existing NOTE: PLEASE REFER TO THE Sete anD aus SYSTEMDEIALS 70 Be supine 15 UNINGs SFORALLAREAS wren Fine COVERINGS TO MEET THE MINIMUM CRITICAL EXTERNAL HOSECOCKS & SHOWERS, WC CISTERNS | | PLANS FOR CEILING HEIGHTS, BULKHEADS AND x Sete Smoke Alarm pm aS a
Footpath ENGINEER'S DRAWINGS FOR ALL LEVELS AN : ce AND WASHING MACHINE COLD WATER TAPS Iv RAKING CEILINGS te: Smoke atarns to Stab wd
ST .__| | SEPARATION IS REQUIRED IS TO BE DONE BYA | | RADIANT FLUX REQUIREMENTS AS ee
FALLS TO CONCRETE SLABS AND DRIVEWAY BUILDING CERTIFIER PRIOR TO INSTALLATION TT ene, | | RADIANT ELUX REGURELENTS AS PER BCA secoDNCE WTEC ON SN srercercat 3
{ \ LEVEL 2 PLAN NOTE: ALL FINISHED FLOOR SURFACES FNAL BUILDING CONTIG Cn eee INTERIOR FINISHES SCHEDULE ALL HOSECOCKS SIGNED IN ACCORDANCE WITH NOTE: ALL MECHANICAL VENTS TO AS 1668.2, Elect Eng, spec. ; Lid
D SCALE 1:100 @ A2 TO FLOOR WASTES TO HAVE A MIN, FALL OF DEALS TOBE SUPPL arr NOOSA SHIRE COUNCIL REQUIREMENTS | LE, 25 LTRS. PER SECOND im
4:190 TO BCA VOL} PART F1.11 CERTER PROOR TO DISTAL is
' oe |
Scale Dats rau By
tse in core 5 i Propet 4 Chere : fan Gorton
read wth i IAG
oud Surana ceaairhen | Ganatboniuhaunianttee eee 5 APARTMENT DEVELOPMENT OAK INVESTMENT HOLDING P/L as shown: AUG 2007
PO 80H 1261, NoOOsSs HEADS Guiding Act 1975 & Standard Buin Regubton 1993 {as amended) & the CDC. . Proj Ne, i Drawing No. ese No. iGf |
QUEENSLAND 4567 Vesa drensons on sie porto axrmencermert of any works These drawirgs \oeaton ‘ Orang Tee D 3
Pr (on) Sage S358 sree wed br aig, Cop den &cranrgs rane pope of 43-45 ELANDA STREET SUNSHINE BEACH LEVEL 2 PLAN 0710 «| WOD.20
BSA UCENSe no. 1004272 featos +
Page 26
“>., ELANDA STREET 30.175 LEVEL 4 PLAN - GARAGE & LOWER UNIT 1 a) BCALES:100 @A2 tan GorTron ren Te conpnchan sith Engrecers Drawings & Repos. Pea Ger = Om Canty ag rere nee roee | tensthenvemdseariaus kendra chess S APARTMENT DEVELOPMENT OAK INVESTMENT HOLDING PfL a3 shown AUG 2007 AG eS asa Heaos Buking Act 1975.8 Sterciers Bulking Raguision 1953 jos wrended) 8 the ODS Suoaraeno 43 (yslormara nun ptr Ucrmmonrendeyeca Dee our e 7 . raat Saarohe eae FA 0400 82 33 Be retest Cons Gasp genres mrah te oey 43-45 ELANDA STREET SUNSHINE BEACH LEVEL1 PARKING 0710 202 OPW @) feat
Page 27
STORMWATER QUANTITY MANAGEMENT PLAN > y & 3 to g > c a x = o 6 ¢ “et oe “P) 07 5493 3322 iE3 07 5493 3422 PROPOSED APARTMENT DEVELOPMENT AT LOT 399 & 400 ON RP48112 ELANDA ST, SUNSHINE BEACH For OAK INVESTMENT HOLDINGS PTY LTD AAOT731SMP January 2008 ATljs a & ww ge in a 3 3 x 3 = 2 S x a oO nial rs OPT) Environmental Management Consultants. Bow > oO & € aus ae ze 6 ui 2 es ao z< ot ae z 4 & z §
Page 28
*
* *
“P07 5499 3322 . _ *
Fh 07 5493 3422 [ } Lf lk f
:ES de@dukenvira com.au fom ett ~
1
- * .
PO Box 78 Wi ta 4575 ae . “ey 4 psy - _
rome FEovironmental
TfA Duke Environmental
ABN 53.117 360 54 Environmental Management Consultants
08/01/08 | Alister Trendell| Brett Thomson | Paula Duke A
A_- Approval B - Building Approval C- Construction
T—For Tender | X - Information R — Revision
The content of this document is provided in strict commerciat confidence. The content of
this document shall not be disclosed to any third party, without the express written
authority of Duke Environmental. Copyright © Duke Environmental 2008.
4A07731SMP
January 2008
ATs
Page 29
-3- TABLE OF CONTENTS 91.0) INTRODUCTION ooo cece ceeceeeeeeeescestessesescsssassseusnscccsecavavsessnasssesseessescausausaeacenesesnersases 5 1.1 Preamble............ 1.2 Site Location.. 1.3 Description of the Proposal ” 1.4 Site Characteristics............. 5 1.5 Site Constraints & Opportunities.. 5 4 Flooding 2.0 RAINWATER REUSE o.oo cecessesesesecesseseseeseseseasaeoeesscssacsnsveveansvesessescsenesanteanacssasseesevase 6 3.0 HYDROLOGY... eecccessesssesessesssecseseseetenstsesceeerecsusceueaeenegeasapsecsesssacseetesscrescssecareeess 6 3.1 Methodology........... 6 3.2 Mitigation Infrastructu . 3.3 Discussion of Results 4.0 CONCLUSIONS / RECOMMENDATIONS u..........cccccsssccseesssessessscssnssseeseesscesecsesessanecenseess 8 5.0 LIMITATIONS OF THIS STUDY 00.0... cc ccccccsccssssesasccssecussensesseespressacacevseeseesssseenavensvecs 8 G0 CLOSURE oan cccsceesssseeneesestesseerssesssssenssesesseseseseasecnsnepestasseacsesnsesessarersersnevevsseatesnenanees 9 7.0 REFERENCES ooo ecscccscsesesseccscccevensveesssnstssecvsenevsesesesssaessesssssapeesnerasevseasscevsueseasesese 10 AA07731SMP January 2008 ATijs
Page 30
’ -4- APPENDICES APPENDIX A - FIGURES AND DIAGRAMS - Figure 1.0 — Locality - Figure 2.0 — Aerial - Duke Environmental Drawing No. DE07731/01 - Duke Environmental Drawing No. DE07731/02 - lan Gorton Design Drawing No. 0710SD.06 - Noosa Council Natural Hazard: Landslide and Flood Overlay APPENDIX B - HYDROLOGIC CALCULATIONS AA07731SMP January 2008 ATiis
Page 31
1.0 INTRODUCTION 1.1 Preamble Duke Environmental have been commissioned by Oak Investment Holdings Pty Lid (via Contour Consulting Engineers) to undertake this Stormwater Management Plan. This report has been compiled generally in accordance with Noosa Shire Councils (NSC) Policy 5 — Engineering Design Standards Roads, Drainage and Earthworks (Section 4. Design and Approval — Drainage), and addresses Item 3 of Noosa Shire Council Information Request (Ref: 2007/2174), dated 5 December 2007. This report details proposed stormwater quantity management strategies to be incorporated into the construction and operation phases of the proposed development. 1.2 Site Location The subject site is located at 43-45 Elanda Street, Sunshine Beach, and is described as Lots 399 & 400 on RP 48112. The site has an area of approximately 0.15 ha. Refer Figure 1.0 in Appendix A for Site Locality Plan and Figure 2.0 in Appendix A for Aerial Photograph. 1.3 Description of the Proposal The applicant proposes to construct a development comprising of five (5) apartments, with associated driveways, swimming pools and car parking areas. Additionally, the development will contain a detention basin to aid in the provision of non-worsening of stormwater flows. Refer lan Gorton Design Drawing 0710SD.06 included in Appendix A. 1.4 Site Characteristics The site is accessed from Elanda Street and consists of two (2) lots. One (1) lot has a residential dwelling which is accessed by an unsealed driveway. Existing vegetation on the subject site is generally comprised of scattered trees and grassy areas. The topography of the site is mapped as steeply sloping generally from the southern boundary towards the north of the site. Refer Figure 2.0 - Aerial Photograph included in Appendix A. 1.5 Site Constraints & Opportunities Opportunity is provided to locate a Detention Basin within the site to treat stormwater runoff. Further, a closed tank system for every apartment is proposed to collect rainwater runoff from the roof areas. Roof rainwater runoff will be re-used to supply toilet flushing and landscape irrigation. Runoff from carpark/driveway areas and overflow from rain water tanks will enter the Detention Basin before being released from the site. These are considered AA07731SMP January 2008 AT§js
Page 32
-6- effective measures to mitigate potential increases in flow levels from the development. Refer Drawing DE07731/02 included in Appendix A for further details. 1.6 Flooding With reference to Noosa Council Natural Hazard: Landslide and Flooding Overlay Map (OM4.3), the subject site is not within the Q100 Flood Prone Area. Refer Appendix A for extract from overlay map. 2.0 RAINWATER REUSE With reference to Noosa Council Designated Rainwater Tank Area Map, the subject site is within an area that requires rainwater tanks. Schedule 8 of the Noosa Planning Scheme requires a minimum storage capacity of 3000 litres per dwelling unit. In addition, water from the rainwater tanks is to be used for. a) Flushing of toilets internal to the building; b) Extemal irrigation, topping up of swimming pools or water features and outside cleaning. All rainwater tanks are to be designed and installed as per the Queensland Development Code (QDC), Part 25 — Rainwater Tanks. Refer Duke Environmental Drawing DE07731/02 in Appendix A for proposed location of rainwater tanks. 3.0 HYDROLOGY 3.1 Methodology It is proposed to mitigate the effects of the proposed development on stormwater discharge rate by way of incorporating a Detention Basin. This system is proposed to capture runoff from the site to maintain design discharges up to, and including, the 100 year ARI event, from pre to post development scenarios (non-worsening). Refer to Drawing DEO7731/02 included in Appendix A for details. Three different hydrological cases were investigated for the purpose of this study: Case 1: Pre-Development site (existing) Case 2: Post-Development of site (without mitigation) Case 3: Post Development with mitigation strategies implemented (Detention Basin) The XP-RAFTS Run-off Routing Software was used for hydrological analysis of the pre and post development catchments. Table 4.1 summarises adopted discharge rates for the design critical storm duration, and the corresponding rational method discharge. Refer Appendix B for internal site hydrologic calculations and variables. 4A07731SMP January 2008 ATijs oe ge ieee
Page 33
-~7- The Rational Method was used to check adopted discharge rates. Parameters adopted were generally based on recommendations in Australian Rainfall & Runoff (lEAust 1997), and the Queensland Urban Drainage Manual (1994). The pre and post development catchments for the development site outlined in Drawing DEO7731/01 in Appendix A. Detailed hydrologic calculations for the intemal pre and post catchment, listing all variables adopted, have been included in Appendix B. Results indicating the effectiveness of the proposed mitigation methods for the ARI storms investigated are detailed in Table 3.1 below. Table 3.1 Model Results ARI Site Catchment Discharge (m*/sec) , Detention Stom | CASE 1 Pre-Development CASE 2 .CASE 3 System Details Post- “Post-Dev | Water Depth Development | with Basin (m) XP-RAFTS Rational XP-RAFTS XP-RAFTS Method , ot 2 year 0.057 0.035 0.084 0.057 0.29 5 year 0.075 0.049 0.080 0.069 0.39 10 year 0.084 0.057 0.089 0.080 0.44 20 year 0.097 0.068 0.101 0.097 0.48 50 year 0.103 0.086 0.108 0.102 0.49 100 year 0.115 0.100 0.120 0.114 0.51 Site specific intemal catchment mitigation infrastructure used to model discharges from the site is summarised below. Refer to Drawings DEO7731/02 in Appendix A for details. 3.2 Mitigation Infrastructure Details Details of the detention basin used to model discharges from the site is summarised below. Adopted Basin parameters are: ° Low level pipe outlet: 0.0m (assumed detention) e Low level pipe outlet type: RCP e Low level pipe outlet specification: 1x225mm diameter 2 Weir height: 0.4m (above assumed detention) 2 Weir width: 0.5m 2 Depth over weir (Qio0): 0.11m * Total storage volume required: 11.3m? ° Detention depth in basin (Qico): 0.51m (above assumed detention) Refer to Drawing DE07731/02 in Appendix A for details. Refer Appendix B for RAFTS output results. AA07731SMP January 2008 ATijs
Page 34
3.3 Discussion of Results With reference to the results detailed in Table 2.1, it can be seen that the proposed mitigation system (“Case 3”) provides effective non-worsening of discharges in comparison to the pre-development case (“Case 1”). This is achieved by the inclusion of Detention Basin storage. It is to be noted that the above analysis is considered to provide conservative results for the following reasons: e The effects of roof water collection systems proposed to be installed at the site have been ignored. 40 CONCLUSIONS / RECOMMENDATIONS We consider that the above accurately, and conservatively, models the stormwater runoff characteristics of the subject catchment. Catchment areas, and individual components of the proposed water quantity treatment systems, are detailed above. We consider that this report demonstrates no net increase in stormwater run-off discharging from the site in comparison to the pre development case. 5.0 LIMITATIONS OF THIS STUDY This study has been tailored to investigate issues in the context of the proposal, and at the area of interest, being Lots 399 & 400 Elanda Street, Sunshine Beach. Individual sub-catchments situated above, and below the area of interest, may have different hydrological / hydraulic influences. Hence, the information contained in this report is not to be used outside of the subject area. We consider that the study accurately reflects the conditions for the area of interest, at the time the study was undertaken. The results of this study should be reviewed if catchment / proposal conditions change in the future. Where applicable, and due to their latent nature, subsurface conditions and/or water quality monitoring results may vary significantly across the site and/or temporally in comparison to those described herein. Notwithstanding the above, this report has been undertaken for the specific purposes of Oak Investment Holdings Pty Ltd (via Contour Consulting Engineers), as detailed in our correspondence to them, and is solely for the use of Oak Investment Holdings Pty Ltd (via Contour Consulting Engineers Pty Ltd). This report is only to be used in full, and may not be used to support objectives other than those set out herein, except where written approval, with comments, are provided by Duke Environmental. Duke Environmental accept no responsibility for the accuracy of information supplied to them by second and third parties. AA07731SMP January 2008 ATijs oo Es eh lk
Page 35
6.0 CLOSURE This report has been undertaken in general accordance with the Queensland Urban Drainage Manual, other industry standard guidelines, and under the direction of a Registered Professional Engineer of Queensland. i. Should further information be required please contact: Yours faithfully (NT /endly g—— : Alister Trendell aula Duke BE Hons MEngSc BAppSc(Chem) PGDipEd CEnvP MEIANZ Environmental Engineer Principal Environmental Scientist For Duke Environmental For Duke Environmental PO Box 78 Wurtulla QLD 4575 P: 07 5493 3322 F: 07 5493 3422 AAQ7731SMP January 2008 ATijs
Page 36
-10- 7.0 REFERENCES Department of Natural Resources & Mines 2005, Planning Guidelines for Water Supply & Sewerage Chapter 5-— Demand / Flow and Projections. 2. Engineers Australia 2006, Australian Runoff Quality, A Guide to Water Sensitive Urban Design. 3. Engineers Australia 2006, Australian Runoff Quality, A Guide to Water Sensitive Urban Design. 4. Main Roads Department — Urban Drainage Manual — Volume 2. 5. Neville Jones & Associates & Australian Water Engineering, Queensiand Urban Drainage Manual Volume 1 — Text (1994). 6. Noosa Shire Council — Planning Scheme. AA07731SMP January 2008 ATijs
Page 37
APPENDIX A FIGURES & DIAGRAMS
Page 38
Ne ArIAA DUKE ENVIRONMENTAL LOCALITY - FIGURE 1.0 w iO E13 2ee Fes azo 9 w ui, x e a STS Cmnty* Centre * ih (GRAS
Page 39
4 a ¥ my g = $ 3 Ar ATww7qAa DUKE ENVIRONMENTAL AERIAL - FIGURE 2.0 SITE = %
Page 40
CATCHMENT AREA 1468m* ‘DIRECTION OF STORMWATER f FLOW PRE DEVELOPMENT APPROXIMATE: -"" CATCHMENT AREA 1466" APPROXIMATE, ao fF iReGnowor fe TS TORMAATER eR OW X POST DEVELOPMENT ef om amnceneee Daye aT APPROVED DOCUMENT STATUS curnt CONTOUR CONSULTING ENGINEERS: Uirwn we FOR APPROVAL ct, PAQPOSED APARTMENT OEVELOPMENT One oro. oer ‘@ oe ae be 43- 48 ELANDA STREET Shee tf 2 SUNSHINE BEACH DRAWING No. Chocks: Bat nar . nee rey CATCHMENT PLAN DEOT73IA
Page 41
pos NOT FOR CONSTRUCTION
KEY
APPHOUSMATE EXTENT
GF ROOF AREA.
wf as
APPRORIMATE EXIBIT OF
UNCOVERED EAT ERIAHEIS
ARES
STORMNATER RET PT
DRSVEWAY ACCESS
OTE:
4, PROPOSED STORMIATER (HFRASTRUCTURE
AMOTTH IS INDICATIVE ONLY AND 16 SUBI0CT
‘TO CHANOM AT DETAILED CEAION FHABE,
2. HYDRAULIC DEGION OF BTOREHATER
UFRASTRUCTURE BY PROJECT CONSULTING
‘ENOINEER,
\ aNERROW
50 fore aT RACARTER TANS
PanenereR Tales THAD REMIT)
WETS FROM RAtRWATER
‘TAM OVERFLOW & UNCOVERED
ERTERTARONG APEAS,
BASE OF @ROw
1 aeAl
moe femecnets oye AT APPROVED DOCUMENT STATUS Guenn CONTOUR CONSULTING ENGINEERS
Come AB, FOR APPROVAL eanvecr, PROPOSED APARTEENT OEVELOPMENT
- bescee . (Not for Construction) ae 43-45 ELANDA STREET Shon 2 of 2
baa: or.01.68
™ “ one em gray By: SUNSHINE BEACH DRAWING New
Checked: BAT. DAE eens more Tue the” STORMWATER MANAGEMENT PLAN DEOT73102
Page 42
Aen try crs
WEST ELEVATION...{trom Elanda Steet)
EAST ELEVATION...
SOUTH ELEVATION...
poste hobhe vino Sarr sn om wrong wet
recdrws Mh wy Neh het ae ectorvend reating |
EE
¥
gra eatcwnte- ; S45,
© , i
Y &
,
" 4 bi
a
Y
enna) Y's, nips dtuion
nig serean bevereee
& NORTH ELEVATION...
Pron ejen dary aga cot xa bes Coats
Ee eee Sra | Rectteneactrrmescacrmusnen, | Sadie 5 APARTMENT DEVELOPMENT OAK INVESTHERT HOLDING PA. {2W@AI AUGZIT IAG
60 GcH We. 1006S Heacs: yh 197 8 Bret Pulifhg Regataon 12 {20 emanieg & Be OOS
Sues se" tay darmtonmaerir Demon rye EH an Cau oa ap
£0) 0800 0G 33 eee reg Cyt tk agree 43- 4S ELANDA STREET SUNSHINE BEACH ELEVATIONS SHEET 4 0710SD.06 ()
Cusumano fanesisnoomeu @ REET SUNSHINEBEACH ELEVATIONS SHEE oe OOSD6
Page 43
Noosa Council Eastern Beaches Natural Hazard: Landslide & Flooding Overlay (Map OMA4.3) eo Eastern Beaches North Inset Scale lem = 220m “0 Eastern Beaches Natural Hazard: Landslide & Flooding Overlay (Map OM4.3) tak mapnowentas ws rahe mantic imac eetranascimeonmat se wastraret od be 2ocid by Gopi tered etn, pants hasd Aza eid 4483 mes Sectelns hitay i eter 308 sr rttecens ti erees mene 153 Rat we ormtecton ton Ganneg ‘Selby Coach Te ib Gk tae Ei Ta iveeca fake Craegaen wes fom wae Reaaprttn nt ats Faster ne yt page Mine a Coon hn stetntiy rot man Flee reat ae very torte wa pet irate ve tate bn 8 rt Lire meaeareen cy Sotelo nat Tene Byes taser Evpowspedarei by eercatnm Lecaasee Seer en d,s 7 7 4 Locality 1. — Boundaries 7 7” Noosa Shire Boundary Property toons Railway Line | Boundaries *#== Major Road Network m3 Landslide Streams, Rivers and Hazard Aren Drainage Lines Extent of BR Inset +4 Flood Mapping me FEE Flood Hazard Area ; Subject Site AA07731SMP January 2008 ATi/is Page 1 of 1
Page 44
APPENDIX B HYDROLOGIC CALCULATIONS
Page 45
ee a aR
‘CONT GUR CONSULTING ENGINEERS
s eS ELANDA STREET, SUNSHINE BEACH
‘ie: ash DET
See AT
ONT EALGALATiC
PRE DEVELOPMENT
Tima of concentration (min) 70.24
Total Distance Te te, 50.00]
Length in [time iaalesy
Sheet Flow Re. OPS 10.24
T={407NL*0.333¥S°0.2
Copy of DEN7733 - Time nf cancentation caleviatlens.ds
FiCT2003
14.02 AM
ae
Page 46
(ig il
eae
OR
CONT OUR CONSULTING ENGINEERS,
FELANGA STREET, @UNSHINE SEACH
OE 97731
'
tear) toatl SOEFE ty SOQRFE 19s SOLE ”
TABLE S081 tonin. ALA} TAGME 3.042 TABLE 2.94.3
-CATCH TYPE 11 SUB-CATCH TYPE 1 | SUB-CATCH TYPE 1| SUB-CATCH TYPE. | SUB.CATCH TYPE 4 q
as oe 7% a82 9.02 ars: .
1 ae. 7? Om 468
a 06 a 82 8.79 URBANISED:
g 08 i 0.82 a70 catcHeenr
Ww a8 2 onZ 0.02
ao 06 22 OR ao
Q 18 cra 982 554
102. 28. 4 gaz O08
iypara) (Ques BQGEF {itch GOCER Oy GOEEE
TAS E8.04.) Grrin, 19) TABLE 5.04.2 TABLE $.04,3
SUB-CAYCH TYPE 2[ SUB-CATCH TYPE 2 | SUB-CATCN TYPS 2} SUS-CATCH TYPE 4 | SUB-CATCH TYPS 2
u 0.0 72 or oa)
1 30 % ar 056
z 20 2 Or 6.80 RURAL
2 20 v2 OP O67 CATCHMENT
@ 49 m ar 0.79
2 a0 2 oF ata
3o 90 m2 or oat
139 90 2 a7 234
AR BRACT IMP. DENSITY RNOQEE AGOPTIAN Bub Qe r COMMERTS
Ceara) ML OUCH SOFT Uses SQESE (S10) GORER
TARE 6.04. ¢ t2omin, 219} TABLE 5.04.2 TABLE S943
SUE-CATCH TYPE 3] SUB-CATCH TYPE 3 | SUB-CATCH TYPE 3) SU8-CATCH TYPE 4 | SUB-CATCH TYPE 3|
2.25, 62 2 ont 089 .
1 a2 me 7s as7 =
2 52 a on : agp AURAL AESIDENTIA,
§ at 7 an 067 CATCHMENT
wo G2 mR a7 art
28 02 n ort ora
52 oe n on 082
430 92 re ort 9.84
ag, ERACT IMP INTENS(EY a COMMENTS.
Costs) [email protected] SOEZE 110% GQSEE (G35) .
TABLE 208.1 Gita, Add i
4) SUS-CATCH TYPE 4 | SUB-CATCH TYPE 4 | LSiG-CATCH TYPE 4) A
oh 1a 2 29 {
1 1 n OG & q
2 10 a a9 COMMERCIAL
5 40 nm on
5) 10 a7) on
20 10 2 09
§ ta n oo
iso 1.6 22, 5.9
aR) | TOC POR Sue CATCH § NEAT ANB CAL CH HRAT SUS CATCH WWERYSITY ECR TOE
tyme) | (OVER A} i tCHANHE! iN tonics} }
nay, train) ze ”
O24. THO Ore
4 149 od
a 140 an
* 1a on i
i 146 af rt 18s tues
a 140 aa ss gee aN
a io 05 ms Ath
a 140. 9 “ 2a STATE
AREA
we.
Saat TRE 2
iba
0.00 8.00
9.00 800 0.03
9.80 00 020
2.00 9.00 0.90
40 0.20 ago
9.00 doo aon
0.90 9.09 0.96
0.00 0.90 9.09 d
apaaren re? RECT ES Gor aaTGn NFET 7
° a 4 ;
:
Cogs AELOTT EE» Pat wesl aT0Gs SIE Fete GPUs
Tayo PRE DEV
nen
Page 47
DEO7731 POST DEV MIT.out Run started at: 21st December 2007 9:00:59 SEH AHTEREAEHEEAAERRA BEES HAR EAEEH EH TAABERABHABAA ARAB ERAGE EHH HABE EHH P ABH E HeeHE RUNTIME RESULTS BERBHAEAEHA AE EERETHEA EEA EAEEAEE AR EB BEATATEAAEB BARA HH EAH AEA AA AEA THEA AHA ERE RH Max. no. of links allowed = 2000 Max. no. of routng increments allowed = 25000 Max. no. of rating curve points = 25000 Max. no. of storm temporal points = 25000 Max. no. of channel subreaches = 25 Max link stack level = 25 Input Version number = 650 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.4141E-01 ESTIMATED PEAK FLOW (CUMECS) = 0.06 ESTIMATED TIME TO PEAK (MINS) = 14.50 BERRA TEE EE EAE EEE EEE TEE AEE TE TEE EEE EEE EEE EEE EE ERE EAR HHH Elanda Street, Sunshine Beach Results for period from Q: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 SERRE AEE EEE EE TEE EAE EE AEE EAE AE TEAR AP EE AE AEE EE HE EEE PEE AEE EH HeReE 0.50 25. 2. - 0000 ROUTING INCREMENT (MINS) STORM DURATION (MINS) RETURN PERIOD (YRS) BX TOTAL OF FIRST SUB-AREAS (ha) TOTAL OF SECOND SUB-AREAS (ha) TOTAL OF ALL SUB-AREAS (ha) Hida 0.04 0.10 0.15 1 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. (ha) (4) (%) POST DEV 0.0433 0.1035 15.50 15.50 ©.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time = Link Page 1
Page 48
DEO7731 POST DEV MIT.out Label to Inflow to Outflow Inflow Vol. vol. Stage Peak (mA3/s) Peak (mA3/s) (mA3) Avail used used POST DEV 15.00 .0799 15.00 - 0693 53.879 0.0000 6.6569 0.3926 SUMMARY OF BASIN OUTLET RESULTS Link No. s/D Dia width Pipe Pipe Label of Factor ‘oe Slope (m) (m) (m) Cm (%) POST DEV 1.0 .2250 0.000 5.000 3.000 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.6053E-01 ESTIMATED PEAK FLOW (CUMECS) = 0.09 ESTIMATED TIME TO PEAK (MINS) = 15.00 PEEATHHEEEAEARE EHS EEE EAEAEEEBE EARAREE BRE BEBE A EBHEAEHEERBEAE BREA AEEEAR AHA EA BEERS HeteH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 HHEPEPRAAAEA GEAR BAEEEA AEA EEE BH AEE BAH ASHAERSASEESEAREBES PARRA AHRA ERR AHE HERE aE ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 25. RETURN PERIOD (YRS) = 10. Bx = 1.0000 TOTAL OF FIRST SUB-AREAS (Cha) = 0.04 TOTAL OF SECOND SUB-AREAS (ha) = 0.10 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 «#2 #1 #2 #1 «(#2 No. (ha) (%) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 inflow to Lag (mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins POST DEV 114.19 12.50 1.500 17.50 0.000 29. 685 "46. 081 0.0887 15.00 0.000 SUMMARY OF BASIN RESULTS Link Time Peak Time Peak Total --------~- Basin --------- Label to Inflow to outflow Inflow vol. vol. Stage Peak (mA3/s) Peak (mA3/s) CmA3) Avail Used used PosT DEV 15.00 .0887 15.00 - 0800 60.527 0.0000 8.1551 0.4368 SUMMARY OF BASIN OUTLET RESULTS Link No. s/D Dia width Pipe Pipe Label of Factor Length Slope Page 3
Page 49
DEO7731 POST DEV MIT.out ESTIMATED TIME TO PEAK (MINS) = 15.00 RAPER EAEAA ABH ERERERAAE AR AABARERAEAERAARE BEES ABBA ES AERA AER EAA TAH EE ARE AHHH Elanda Street, Sunshine Beach Results for period From 0: 0.0 1/ 1/1990 o 12: 0.0 2/ 1/1990 LENGUSUOESUAUSUREOEAEAEEESTEGIOSUDESHOSEEISTOSUERTURESHEOIDESERISOEREIAEASIAERE BHF: ROUTING INCREMENT (MINS) STORM DURATION (MINS) RETURN PERIOD (YRS) BX TOTAL OF FIRST SUB-AREAS (ha) TOTAL OF SECOND SUB-AREAS (ha) TOTAL OF ALL SUB-AREAS (ha) Aunt pede ° 2 s , _ SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 = #2 No. Cha) @) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag Cum/h) C mm ) Cmm/h) ( mm ) (mA3/s) Peak mins Post DEV 150.99 12.50 "l. 500 17.50 0.000 44. sgl 61.415 0.1057 15.00 0.000 SUMMARY OF BASIN RESULTS Link Time Peak Time Peak Total ---~----- Basin -----~--- LabeT to Inflow to outflow Inflow vol. vol. Stage Peak (mA3/s) Peak (mA3/s) (mA3) Avail Used Used POST DEV 15.00 .1057 15.00 -1021 82.884 0.0000 10.200 0.4897 SUMMARY OF BASIN OUTLET RESULTS Link No. s/D Dia width Pipe Pipe Label of Factor Gs Slope (m) (m) (m) (%) POST DEV 1.0 2250 0.000 5.000 3.000 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.9263E£-OL ESTIMATED PEAK FLOW (CUMECS) = 0.12 ESTIMATED TIME TO PEAK (MINS) = 14.00 ER EER ER EE SEE EE EE RE EERE ER EE Ht Elanda Street, Sunshine Beach Page 5 tg cg pee ema ” on week
Page 50
DEO7731 POST DEV.out Run started at: 20th December 2007 14:48:28 SRE ERE EAE EAA EAE EEE BAER EEE BAT EEE HAAR EE HARA GT RE EHR AE HH BBE HHREE RUNTIME RESULTS SERRA AER EEA EAE EAE ED EA HAPTER TETE A EEE ETE TE ETE TEES TEE EEE HEED AEE #HtEE Max. no. of links allowed = 2000 Max. no. of routng increments allowed = 25000 Max. no. of rating curve points = 25000 Max. no. of storm temporal points = 25000 Max. no. of channel subreaches = 25 Max link stack level = 25 Input Version number = 650 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.4141£-01 ESTIMATED PEAK FLOW (CUMECS) = 0.06 ESTIMATED TIME TO PEAK (MINS) = 14.50 rag ERE RE EE EE IER ERE EE EE EEE Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 SEAR ER EEE ABA AE AE EEE EE AEE EEE EE AEE EEE AEE AEH Ea ETHER EH AAA Htete ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 25. RETURN PERIOD (YRS) = 2. BX = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.04 TOTAL OF SECOND SUB-AREAS (ha) = 0.10 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #21 #2 #1 #2 No. Cha) (%) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Page 1 a ee ag
Page 51
DEO7731 POST DEV.out STORM DURATION (MINS) RETURN PERIOD (YRS) BX TOTAL OF FIRST SUB-AREAS (ha) TOTAL OF SECOND SUB-AREAS (ha) TOTAL OF ALL SUB-AREAS (ha) Wott it be © SUMMARY OF CATCHMENT AND RAINFALL DATA . Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. Cha) (%) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag Cmm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins POST DEV 114.19 12.50 "h 500 17.50 0.000 29.685 46.081 0.0887 15.00 0.000 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.7023e£-01 ESTIMATED PEAK FLOW (CUMECS) = 0.10 ESTIMATED TIME TO PEAK (MINS) = 15.00 SEERA ETE EEE TAP TEA AE EEE EAE EAE EERE ETE EEA EEE DEEP AEE AE EE EE EEE EAE EEE BaeHE Elanda Street, Sunshine Beach Results for period From 0: 0.0 1/ 1/1990 0 12: 0.0 2/ 1/1990 HPRERERARAHARUHBHDAEELGHEAREREEHAEELEOPREARELELEREREERUDRURELERERE GIRS HIER IEEEH HHH ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 25. RETURN PERIOD (YRS) = 20. BX = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = -04 TOTAL OF SECOND SUB-AREAS (ha) = 0.10 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. (ha) (%) 8) Post DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag Cmm/h) C mm ) (mm/h) ie) (mA3/s) Peak mins POST DEV 130.11 12.50 1.500 17.50 0.000 36. i7t 52.713 0.1014 15.00 0.000 LINK POST DEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.6184E-01 Page 3
Page 52
DEO7731 POST DEV.out . Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. cha) (%) (%) POST DEV 0.0433 0.1035 15.50 15.50 0.000 100.0 .030 .010 .0015 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) ¢ mm ) Cmm/h) C mm) (mA3/s) Peak mins POST DEV 185.57 12.50 1.500 17.50 0.000 44. 583 "60. 358 0.1199 10.00 0.000 Run completed at: 20th December 2007 14:48:30 mik open 0 Page 5S ae ee gg a ke ie
Page 53
DEO7731 PRE DEV.out Run started at: 20th December 2007 14:39:16 HEPHPHAAHEEHHRAAAEAAAEEAARAAEREAE AS BBHEBSEAREBEAS ARASH BABE EBABER REA EHH PER ABE REPRE RUNTIME RESULTS Baa ARR RRR PER ERE ER EEE EE EE HH Max. no. of links allowed = 2000 Max. no. of routng increments allowed = 25000 Max. no. of rating curve points = 25000 Max. no. of storm temporal points = 25000 Max. no. of channel subreaches = 25 Max link stack level = 25 Input Version number = 650 LINK PREDEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.2691€-01 ESTIMATED PEAK FLOW (CUMECS) = 0.06 ESTIMATED TIME TO PEAK (MINS) = 15.00 Be a A EE AEE EER EER EI EEE HH Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 to 12: 0.0 2/ 1/1990 ag IEEE EER EERE EAE EERE ER PEEP ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 25. RETURN PERIOD (YRS) = 2. Bx = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.13 TOTAL OF SECOND SUB-AREAS (ha) = 0.01 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. (ha) (%) (%) PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Page 1 ee eg
Page 54
DEO7731 PRE DEV. out STORM DURATION (MINS) RETURN PERIOD (YRS) BX Ll. TOTAL OF FIRST SUB-AREAS (ha) = 0.13 tue be S TOTAL OF SECOND SUB-AREAS (ha) TOTAL OF ALL SUB-AREAS (ha) SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern B Link Label #1 #2 #1 #2 #1 «#2 #1 #2 #10 «#2 No. Cha) (%) (%) PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) C mm ) (mm/h) C mm ) (mA3/s) Peak mins PREDEV 114.19 12.50 1.500 17.50 0.000 29. 685 "46. 081 0.0839 15.00 0.000 LINK PREDEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.5506E-01 ESTIMATED PEAK FLOW (CUMECS) = 0.10 ESTIMATED TIME TO PEAK (MINS) = 15.00 Fe ENE ESE EEE ERE aa HE Elanda Street, Sunshine Beach Results for period from 0: 0.0 1/ 1/1990 o 12: 0.0 2/ 1/1990 LEELANOLONSTEEOEEDEOTOTEEADSEAESEELEEOEERSORIESOROLETOLURESSEORUNELEOEHIEASOOROE ROUTING INCREMENT (MINS) = 0.50 STORM DURATION (MINS) = 25. RETURN PERIOD (YRS) = 20. BX = 1.0000 TOTAL OF FIRST SUB-AREAS (ha) = 0.13 TOTAL OF SECOND SUB-AREAS (ha) = 0.01 TOTAL OF ALL SUB-AREAS (ha) = 0.15 SUMMARY OF CATCHMENT AND RAINFALL DATA Link Catch. Area Slope % Impervious Pern 8 Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. (ha) (%) (%) PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag (mm/h) C mm > (mm/h) C_mm_) (mA3/s) Peak mins PREDEV 130.11 12.50 1. 500 17.50 0.000 36.171 52.713 0.0968 15.00 0.000 LINK PREDEV 1.000 ESTIMATED VOLUME (CU METRES*10**3) = 0.4872E-01 Page 3
Page 55
DEO7731 PRE DEV. out : Link Catch. Area Slope % Impervious Pern 8 Link Label #1 #2 #1 #2 #1 #2 #1 #2 #1 #2 No. Cha) (%) (%) PREDEV 0.1348 0.0120 15.50 15.50 0.000 100.0 .030 .010 .0026 0.000 1.000 Link Average Init. Loss Cont. Loss Excess Rain Peak Time Link Label Intensity #1 #2 #1 #2 #1 #2 Inflow to Lag Cnm/h) C mm ) Cmm/h) C mm) (mA3/s) Peak mins PREDEV 211.27 12.50 1. 500 17.50 0.000 36. 562" $1.317 0.1148 10.00 0.000 Run completed at: 20th December 2007 14:39:17 mik open 0 Page 5
Page 56
Our Reference: ABO731LR 8 August 2008 Oak Investment Holdings Pty Ltd C/- Contour Consulting Engineers PO Box 474 BUDDINA QLD 4575 Attention: Brendan Lowther Dear Sir OPERATIONAL WORKS - LANDSCAPING, CARPARKING & ACCESS, FRONTAGE WORKS, STORMWATER, ROADWORKS, SEDIMENT & EROSION CONTROL. / 43 & 45 ELANDA STREET, SUNSHINE BEACH LOT 399 RP 48112, LOT 400 RP48112 > wo oF 1.0 INTRODUCTION % 5 2 9s Further to Sunshine Coast Regional Council's Information Request (Ref No. S = 2008/1168), dated 30 July 2008, on the subject application we provide the R 3 8 following responses. 62> 3 2 = 9 2.0 RESPONSE TO INFORMATION REQUEST si N 2.1 LR. ITEM 5 3 % Contour Consulting Engineer Drawings 5083-OPW2, OPW3, OPW6 = 3 & OPW8 pertain to proposed stormwater infrastructure at the subject o > 3 site. These drawings have been reviewed by Duke Environmental, & ary and the design and management of stormwater is consistent with our Nee oy Report “Stormwater Quantity Management Plan” (Ref: 2 a a 8 AA07731SMP), dated January 2008. 26S 3 pot & We understarid a copy of the above report is being forwarded to your 2 3 BR office by lan Gorton Designs. See ie ao ree 2.2 LR. ITEM 6 Refer Duke Environmental Drawing DE07731/02 included in Appendix A of Duke Environmental Report “Stormwater Quantity Management Plan” (Ref: AA07731SMP), dated January 2008 for details of hydraulic design. AB0731LR — Oak Investment Holdings Pty Ltd August 2008 ATijs Environmental Management Consultants swertul Owl Gla Ply Lid T/A Duke Environmerital ABN 53 E11 368.944 C; m
Page 57
oe. e 3.0 SUMMARY We consider the above information to provide adequate response to Items 5 and 6 of Council's Information Request. Please feel free to contact Alister Trendell at our office if you have any questions regarding the project. Yours faithfully, ANT penal (AGe Alister Trendell Paula Duke BEng(Hons) MEngSc BAppSc(Chem) PGDipEd CEnvP MEIANZ Environmental Engineer Principat Environmental Scientist @ for Duke Environmental for Duke Environmental ABO731LR — Oak Investment Holdings Pty Ltd August 2008 ATijs
Page 58
Z {)OBTAN ALL HEDESSARY APPROVALS. AUTHORITIES. WMWING. ALRISDICTION
var Sig Pd a Foes OO, FROM A
7 y 2) ALL WORK SHALL COMPLY WOH THE REQUREMENTS OF THE LOCAL AUTHORITY
. GANG ESSEACTION AND WI TE AEGUMERET. OF ALL RELEVANT ASTRON
. . 3) COMPRA UNERT LEVELS AND LOCATING OF ALL EXITING SORMCES PROR TO THE
. DOSTALATIN Gr ANT ASSORTED SERAGES”
. 4) THESE_DRAWANGS ARE A DIAGRAMMATIC REPRESENTATION OF A PROPOSED
. PLUMEING AND ORANAGE INSTALLATION. USE OIMENSIONED ARCHITECTURAL
. RAMOS FOR SET OUT OF PENETRATIONS RELATING TO PUMDING FIXTURES,
(TIS THE RESPONSIBLITY OF THE DESTALLER TO COORDINATE THE ON-SITE
BISTALLATON WITH OTHER BERVICES INSTALLATIONS AND STRUCTURE.
DO NOT SCALE THESE ORANDNGS,
8) THE CONTRACTOR 15 TO ASCERTAIN THE EXACT LOCATION OF ALL BOSTING
SERVICES PRIOR TO COMMENCEMENT OF CONSTRUCTION AND SHALL BE
RESPONSIBLE FOR THE COST OF RECTIFICATION OF ANY DAMAGE WHICH MAY
QOCUR, THE LOCATION OF BXCSTING SERVICES SHOWN ON THIS DRAWING 'S
REPRODUCED FROM LOCAL AUTHORITY RECORDS ETC. FOR WHICH NO OPINION
(S EXPRESSED AS TO THE ACCURACY OF SAE
(0) "AS~CORSTRUCTED’ ORANIMGS WHERE REQUIRED BY THE LOCAL AUTHORITY ARE THE
(RESPONSIALITY OF THE CONTRACTOR. THE CONTRACTOR SHALL REQORD ALL
SEINE TO ORR, OCA AND ALLOW ALL COSTS FOR THE PREPARATION OF
i CROs.
TYAS _A_CONDIMON OF TENDERING, THE CONTRACTOR SHALL VISIT THE STE
AND SHALL BE OEEMED TO BE FULLY AWARE OF SITE CONDITIONS.
ANY CLAlM FOR VARIATION ON THE BASIS OF LACK OF KNOWLEDOE OF SITE
CONDITIONS ‘SHALL NOT GE ACCEPTED.
) WHERE A PARTICULAR MANUFACTURERS PROOUCT [5 SPECIFIED OR WOTED,
GTHER MANUFACTURERS PRODUCTS MAY BE SUBSTITUTED,
SUBSITIUTED PRODUCTS MUST WAVE PERFORMANCE ANO LONGEVITY
CRITERIA EQUAL YO OR GREATER THAN THE SPEGIFIED PRODUCT.
DOCUMENTED PROOF OF SAD CRTERA WAY BE REQUIRED.
NOTE: FIRE COUARS EXCEPTED — REFER NOTE BELOW
9) ALL PLLAEING SERVICES THAT PENETRATE BUILDING ELEMENTS RECKSRED
Jo WOE A FRL MUST BE INSTALLED $O THAT THE FIRE RESISTING
PERFORMANCE LEVEL OF THE .GUILDING ELEMENT [S NOT .IMPARED.
FIRE COLLAR INSTALLATION LAST BE CERTIED GY QUALIFIED PERSONNEL
(OBTAIN GRAND AND MODEL APPROVAL FROW THE BALDING CERTIIER:
PRROR TO THE RSTALATION OF ANY FIRE COLLAR.
THIS BABLOING ( OF TYPE A CONSTRUCTION. PROVIDE FIRE STOP COLLARS TO ALL
FAG FUMING WHERE REDURED IN ACCORDANCE WTH SPECIFIONTION 1.1 TABLE 3
OF THE BCA
10) ARRANGE WITH LOCAL AUTHORITY FOR A 32# WATER CONMECTION,
iD Pay ALL FEES DUE.
114) USE ESTING HOUSE DRA CONNECTION, PAY ANY AMD ALL FEES OVE,
SANITARY PLUMBING & DRAINAGE
1) ALL SANITARY DORANAQE SHALL BE 100 DA AT 1.48% FALL USLO
2) UMMA SZE OF ACCESS PANELS SHALL GE 80Gnm X Sotho.
3) AMY FLOOR WASTE GULLY WHICH RECEIVES DISCHARGE FROM A LAUNDRY
TROUGH SHALL GE FITTED WITH AN ANT-FOMMMO GRATE SYSTEM.
MATERIALS:
HOUSE DRAINAGE . PVC OUSS ORV
‘BOWL, WASTE AND VENT PIPE PWC CLASS OW
STORMWATER & DOWNMIPES
1) ALL STORAMATER DRAMAGQE SHALL BE 100 DA AT 1% FALL UNO
2) OOMMPRE SUES STATED ARE MMR REDUFED OMUSS-SECTIONAL
OS.
MATERIALS:
COWNAIPES PER ARCHITERTS SPECS,
STORMWATER (UP TO 225 0A) PG CLASS SW HEAVY UNO
(> THE 225 OK) CONCRETE (RAJ) CL 3 / FRO (ADOOL) CL 1
SUBSOIL ORANAGE PERFORATED PVG {DN100 ULNLO.) IN FILTER GOOK
. : : ” OES PE
1 : am ATH
SUB BASEMENT STORMWATER ee Ban
OG (CRSCONMECTOR GULLY
' Dna DISH WASHING MACHINE
w EXPWESON SOOT
WATER SUPPLY Po ELEVATED PIPEWORK DROPPER
per ra 1) Ow & HW TO INDIVIDUAL PODTS IS 156 UNO, rr FUSHED FLOOR LEVEL
2 HW IS 186 THROUGHOUT U.N.O, rr FROG FLAP
(OW TO MORE THAN 1 PONT SHALL BE 200 OR GREATER Fwo FLOOR WASTE, GULL
NON—-POTABLE WATER SUPPLY LA 4) EXTERNAL HOSE QOCKS SHALL BE SUPPLIED WITH 208 (MIN) ne HOSE COCK
FEED AND BE FITTED WITH INDIVIDUAL STOP TAPS. nee HOUSE CORIECTION BRANCH
‘SIZING 200) REFERS TO TYPE B COPPER TUBE. REFER
8) Ae Sota tae (1 FOR GOUNALENT PEE DICE We OTHER we FIRE. HYDRANT
APPROVED MATERIALS. Hw HOT WATER USOT
©) WW NO CASE SHALL A 16 COLD BRANCH EXCEED 3m IN LENCTH L (VERT LEVEL,
— ae ge 6 —— 7): POSITION SERVICES IN CERLING SPACES AND WALL FRAMING UNO, © SSPECTON OPEN
18) JONTS IN PRESSURED YATER SERVICE PIPES UNDER FLOOR SLABS ARE MOT os INSPECTION OPENS TO SURFACE
9) ALL IN-GROUND VALVES SHALL BE ENCLOSED IN APPROVED PATH BOXES, one OERPLOW RELIEF GULLY
10) FLOW RESTRICTION DEVICES SHALL BE FIITED WHERE TAP FLOW RATES, a REDUCED UNV
(ARE WOT SELF—LBOTING. DEVICES SHALL HAVE A MAXIMUM OF 4 LARGE s =a
WATERWAY PORTS TO, REDUCE BLOCKAGES. (CONSE Of, SIMILAR) oR ‘SHOWER
Der SL USED TO RESTOCT, FLOM TO EASDES, SDOGS, SHWE
(@& TUBS TO A MAXIM FLOW OF y sO ‘SPOON DRAIN OUTLET
11) MOT WATER PIPE INSULATION SHALL FULLY COMPLY WITH AS3500.422005 Te ‘TEST GATE
SECTION 4. MINIMUM R VALUE OF 0.3. Z 1. TROUGH
12) TAP OUTLET POINTS SHOWN ON PLAN ARE INDICATIVE ONLY. REFER TO
2) ARCHITECTURAL AND/OW END CLIENT SPECONGATIONS. FOr PREGSE OUTLET uo UNLESS NOTED OTHERORSE
LOCATIONS. ' wo WATER CLOSET
13) INSTALL COLD WATER CONTROLS AND PIPING ON THE INLET SIDE
OF & HWM) TO COMPLY WITH AS 5600.4 AND IN. ACCORDANCE
WI THE RECAREMENTS OF THE LOCAL AUTHORITY
14) RENCUATE HOT WATER TO ALL FIXTURES EXCEPT HOSE COCKS,
CHSHMUASHERS AND WATER CLOSETS =
45) PROVIDE A TEMPEROIG VALVE TO EACH HU EQUAL
‘TO fakC HEATOUARD 20.
10) PROWGE @5 HOT WATER TD, MTOMEN SAK LARRY TUS &
Want HOT WATER Wao? ExceEDNG oo" ON” NT MATE
PROMDE A SOOKE PRESSURE LIMITING VALVE
17) SEDUTELY DOWNSTREAM OF WHE METER
MATERIALS: esa DATE a
Sieains ask pavane: Pavan tae keel SPICE CONSULTING
POLYETHYLENE, FIGH DENSTY POLYETHYLENE i CONSTRUCTION HYDRAULICS CONSULTANTS:
Bil) -
tT =
it
San! LASTATIONS AS STATED Wi AS 3500. ri! PO BOX 1408 BUDERIM 0 4556 Liu
t 07 .
F 07 +
1124816 - ju
Page 59
NOIS HNUXI, dvl 350! it K tl i te an a YSLVMNYOLS | T3Aq1 H id 1b =v vib =e 3 sgovoms Tv bT) NEISSO NOLYOO NVI versio _cannossy] a ay ny ay ony acer fm fl for fon fin finer ffm fmm fm foamy 3} | oso'sr 1 —= Taya fe e k : ae — SSE :
Page 60
ape, A —_ ee 1 1 SHIGE CONSULTING tL i CONSTRUCTION HYDRAULICS CONSULTANTS so! PO BOX 1408 BUDERIM © amd Telephone 07 5445 3683 ses GBSA Focsimile 07 5445 3524 + - 1124616 = iu L FROM SWIMMING POOLS i ! TYPICAL CONNECTION OF PUMPED WASTE DISCHARGE | 2
Page 61
S}UR}NSUOZ juawabeuey JeyUSsWUOJIAUA jP]|USLUUOJIAUZ ie STORMWATER TREATMENT SYSTEM MAINTENANCE MANUAL PPS BIE ILL ES NGY JOJUSWUOIIAUZ SYNG ¥/1 P}1 Ald PID MO [NJeMOg AD"WOD ONAUdNPHSP EB ZZvE CSPS LO BE ZZEE L6PS LO El SéSb AIO VIINLINM SéSb GID VANILUIG 8Z X09 Od ADMAIDg UOHOAOUU F L 19481 ‘2 aying “y Buipying a - al I ~ no F - =- ¢ o 2 = Wl Wp. 2m © Sdow < e._a&Z a a = wal qezct 3 ao Hon _ r d=aoz o - &2 65 Li aotH PA Wit os in Wl no w = = O70” - ao WD n oansg Ww a a > a Od 2 a J wi = oO AGO07310MM October 2009 ATijs
Page 62
(B) 07 5493 3322
{E} 07 5493 3422
{€} [email protected]
PO Box 78 Wurtulla 4575
Powerful Owl Qld Pty Ltd
T/A Duke Environmental
ABN 53 111 368 944
*
Duke
Environmental
' Environmental Management Consultants
Document Control ;
Version Parenthood Authorised for Issue
No. Date Author . __| Reviewer Name _| Document Status
0 | 06/10/09 | Alister Trendell Paula Duke =} Julie Schubert A
A _- Approval B - Building Approval C- Construction | V—- Version
T —For Tender X - information P — Preliminary
The content of this document is provided in strict commercial confidence. The content of
this document shall not be disclosed to any third party, without the express written
authority of Duke Environmental. Copyright © Duke Environmental 2009.
AG07310MM
October 2009
ATijs
Page 63
-3- TABLE OF CONTENTS 1.0 INTRODUCTION 4 1.1 Preamble.. 4 1.2 Site Location............000..0. 4 1.3 Description of the Proposal .. 4 1.4 Treatment Systems............ 4 1.5 Maintenance 4 2.0 LIMITATIONS OF THIS MANUAL o.oo... ccc ecccceecccceseeseseesersecaeeseesesaecsesateasssavsseresecaee 5 APPENDICES APPENDIX A - Figures and Diagrams - Figure 1.0 — Locality - Figure 2.0 - Aerial - Duke Environmental Drawing DE0731/03A APPENDIX B - Maintenance Schedule/Actions APPENDIX C - Fox BPT600 Information AGO7310MM October 2009 ATiis
Page 64
1.0 INTRODUCTION 4.1 Preamble This stormwater treatment system manual has been compiled to generally satisfy Items 30 and 31 of the Sunshine Coast Regional Council's Decision Notice (Ref 2007/2174), dated 15 May 2008. This report is to assist maintenance staff in the general upkeep of the stormwater treatment systems. 1.2 Site Location The subject site is located at 43-45 Elanda Street, Sunshine Beach, and is described as Lots 399 & 400 on RP 48112. The site has an area of approximately 0.15 ha. Refer Figure 1.0 in Appendix A for Site Locality Plan and Figure 2.0 in Appendix A for Aerial Photograph. 1.3 Description of the Proposal The applicant proposes to construct a development comprising of five (5) apartments, with associated driveways, swimming pools and car parking areas. Additionally, the development will contain a detention basin to aid in the provision of non-worsening of stormwater flows, and a gross pollutant trap with hydrocarbon arrestor. 1.4 Treatment Systems The following stormwater infrastructure has been installed at the site i. Stormwater Detention System Duke Environmental Drawing DE0731/03A included in Appendix A indicates the location of the stormwater detention system. Appendix B contains the maintenance schedule/actions for the system. Refer Contour Consulting Engineers for detailed design drawings. ii. | Fox BPT600 Gross Pollutant Trap and hydrocarbon arrestor Duke Environmental Drawing DE0731/03A included in Appendix A indicates the location of the unit. Appendix B contains general maintenance schedule/actions for the system, and additionally, Appendix C contains specific vendor supplied maintenance and operation advice for the unit. Refer Contour Consulting Engineers for detailed design drawings. 1.5 Maintenance The stormwater treatment systems shall be maintained generally in accordance with the Maintenance Schedule/Actions included in Appendix B, and Appendix C. AG07310MM October 2009 ATfs
Page 65
2.0 LIMITATIONS OF THIS MANUAL This manual has been tailored for the stormwater treatment systems at Lots 399 and 400 RP48112, Elanda Street, Sunshine Beach. We consider that this manual accurately reflects the actual stormwater treatment systems present at the site, at the time the manual was issued. The contents of this manual should be reviewed if stormwater mitigation infrastructure changes in the future. Notwithstanding the above, this report has been undertaken for the specific purposes of Oak Investment Holdings Pty Ltd, as detailed in our correspondence to them, and is solely for the use of Oak Investment Holdings Pty Ltd. This report is only to be used in full, and may not be used to support objectives other than those set out herein, except where written approval, with comments, are provided by Duke Environmental. Duke Environmental accept no responsibility for the accuracy of information supplied to them by second and third parties. AGO7310MM October 2009 ATiis
Page 66
APPENDIX A FIGURES & DIAGRAMS AG07310MM r 200!
Page 67
SUNSHINE
dup
yi.
z\O
E a eee
5) oD
$y ge"
ej
#
\Koosa
ational
225
=
E a
w & w
Ss-a
zQO
ot
x,
SE
Lu
ws
50
OD —
ITE =%
YD
Page 68
b€Z0 3G 0°? AYNDI4 - IWIYAV IWLNAWNOUWIANA 3MNG
Page 69
NOT FOR CONSTRUCTION 4 KEY BE sontiwater ve enrion easin YW) LEVEL SPREADER a 9 GROSS POLLUTANT TRAP _ Lo ~~ FOX BPT600 OR APPROVED EQUIVALENT apt oe, / NL zl = f \ i oa u J \ ( A > 2 2 + ‘ . 3 / ? \ ) \ f ( aA ‘ LW Lu o n <x Q Zz xt ai LU LEVEL SPREADER / = meren GROSS POLLUTANT TRAP — DETENTION BASIN FOX BPT600 OR APPROVED EQUIVALENT REFER CONTOUR CONSULTING ENGINEERS FOR DETAILED DESIGN 4 2 0 2 4 6m ttt tht ———— 1 20043 Ne'| Deve Ament pesigi a APPROVED DOCUMENT STATUS s conse . * . cuen- OAK INVESTMENT HOLDINGS PTY LTD Brawn at FOR APPROVAL ia a * pros PROPOSED APARTMENT DEVELOPMENT Date oetoog Pe (Not for:Construction) PO Box 78 Wurtule 4575 * at 43-45 ELANDA STREET Sheet | of Survey By: - Powerful Ow! Qid Pty Lid SUNSHINE BEACH DRAWING No Checked P.O. DATE: casenwewasene TA Duke E It E al & Engineenng 3 5 ulta Deum AND sie AS sag an § commas suoreotes ay oun ewnnonenras | True LOCATION OF DETENTION SYSTEM DEO731/03A
Page 70
APPENDIX B MAINTENANCE SCHEDULE/ACTIONS AG07310MM October 2009 Aljjs
Page 71
Maintenance of Stormwater Detention Systems A stormwater detention system or detention basin aims to reduce the risk of rainfall runoff from the developed site affecting downstream properties. Stormwater runoff from developed land, i.e. from roofs and car parking areas occurs more frequently and with more volume than would otherwise happen from the undeveloped site. The detention system aims to collect most stormwater from the site and release it through a low level outlet, generally at a fixed rate of discharge. A level spreader receives all water discharging from the detention basin. Its function is to retum the concentrated, high velocity, piped flow to low velocity sheet flow. Recommended maintenance procedures and frequencies are detailed below. DETENTION SYSTEM MAINTENANCE SCHEDULE/ACTION INSPECTION ITEMS: FREQ. .| Action Required (details)) ° - mh . Low leve! outlet pipe — Monthly Check that the low level outlet pipe is not obstructed by debris. If it is, lobstruction by debris and after remove the debris and dispose of where it will not be carried back into heavy the detention basin. rainfall Low level outlet pipe — 3 monthly Check that the low level outlet pipe is not obstructed by either lobstruction by vegetation or vegetation, sediment build up or the ‘raising’ of the basin floor due to sediment extended periods of sediment being deposited in the basin. Vegetation should be kept clear of the inlet. If sediment is blocking the pipe it should be removed. If the basin floor is higher than the design level it may need to be excavated and returned to its design level. If this occurs a coarse sediment trap may need to be installed to pre- treat stormwater runoff entering the basin. Low level outlet pipe - scour | 3monthly | Check that the area surrounding the low level outlet pipe is not Jaround inlet affected by scour from high velocity flows. If this occurs, it should be rectified. Additional scour protection measures may be required, i.e. additional rock, pebble or stone pitching. Overflow weir — obstruction Monthly Check that the overflow weir is not obstructed by debris. If it is, by debris and after remove the debris and dispose of where it will not be carried back into heavy the detention basin. rainfall Overflow weir — scour around | 3 monthly | Check that the area surrounding the overflow weir is not affected by inlet scour fram high velocity flows. If this occurs, it should be rectified. Additional scour protection measures may be required, i.e. additional rock, pebble or stone pitching. Inlet pipes — obstruction by Monthly Check that the inlet pipes are not obstructed by debris. If they are, debris and after remove the debris and dispose of where it will not be carried back into heavy the detention basin. rainfall Inlet pipes — scour around 3monthly | Check that the area surrounding the inlet pipes is not affected by inlet scour from high velocity flows. If this occurs, it should be rectified. Additional scour protection measures may be required, i.e. additional tock, pebble or stone pitching. Patchy grass Monthly If significant patches of dead grass are observed they should be replaced with new turf. Bare patches of soil should not be allowed to remain, as this may increase runoff of coarse sediment and affect other drainage infrastructure. Establishment and Every 3 For first 2 weeks after laying new turf, water every 3 days if no rain maintenance of new turf Days occurs. For the following month, water as necessary, dependant on watering) rainfall, After this period the new turf should not require watering, however during extended periods of dry weather, and dependant on prevailing environmental conditions, occasional watering may be required. AG07310MM Page 1 of 3 October 2009 ATijs
Page 72
DETENTION SYSTEM MAINTENANCE SCHEDULE/ACTIONS NSPECTION ITEMS: FREQ. Action Required (details) Establishment and Monthly Do not mow new turf for the first month. After this period mowing will maintenance of turf (mowing) be necessary dependant on seasonal variations such as rainfall and temperature. Grass length should initially be left relatively long, to avoid potential drying out of the turf. In addition, no grass clippings should be teft on the ground, as they may release excess nutrients to the stormwater. All grass clippings are to be collected and disposed of where they will not be carried back into the detention basin Weed control Monthly Monitor the basin for build up of weeds. Weed removal should be manual. Herbicides should not be used. Litter within the basin? Monthly Remove litter and dispose of appropriately. Grass within the basin Monthly The height of grass within the basin should not be allowed to get excessively high or interfere with stormwater flows to the low level outtet pipe. Regular mowing should be employed. Grass clippings should be collected and disposed of outside of the basin. This is due to the high nutrient levels of decomposing grass, and the adverse effect this may have on water quality leaving the site. Sides of basin 3 Monthly The sides of the basin should be checked for evidence of scour caused by stormwater entering the basin other than via the inlet pipes. Evidence of preferential overland flow paths entering the basin may need to be addressed to avoid further damage. Spreading the flow over a greater area may need to be employed. Level Spreader — gravel Monthly Check that the gravel drainage layers of the level spreader are free of drainage layer debris and vegetation. Level Spreader During When raining, check that the level spreader is receiving all runoff from rainfall the detention basin. In addition, stormwater should be distributed along the length of the spreader. Evidence of flow not reaching the full length of the spreader should be investigated. The following may be reasons for restricted flow within the level spreader, « Gravel drainage layer is blocked ~ if so, remove debris. The drainage layer may need to be replaced if loaded with sediment. « Geotextile cloth is blocked — if so, remove sediment. The geotextile cloth and drainage layer may need to be replaced if loaded with excessive sediment. e Subsurface drainage pipes are block or obstructed — check that flow is unrestricted along the length of the drainage pipe. Obstructions such as sediment deposits may need to be ‘flushed’ out with plumbing equipment. If the drainage pipes are not graded correctly, they may need to be re-laid to ensure even distribution along the length of the pipe. Evidence of concentrated flow paths leaving the final stage of the level spreader will need to be investigated and rectified. Reasons for this are likely due to be flow not being distributed along the length of the spreader. Investigation and remedial action should follow that detailed above. COMMENTS AG07310MM Page 2 of 3 October 2009 ATijs
Page 73
STORMWATER PIT MAINTENANCE SCHEDULE/ACTIONS Ipresent. INSPECTION ITEMS: FREQ. Action Required (details) Litter within pit. Monthly Remove litter and dispose of appropriately. IDamage/vandalism to structures) Monthly If damage or vandalism occurs replace affected items immediately. COMMENTS GROSS POLLUTANT TRAP/ HYDROCARBON ARRESTOR MAINTENANCE SCHEDULE/ACTIONS INSPECTION ITEMS: |.FREQ. Action Required (details) ._. ao fw Litter within silt basket. Monthly Monitor the build up of Gross pollutants and Titer within the silt basket. When required, remove the grate, lift out the basket, and dispose of gross pollutants and litter to a rubbish bin or other suitable location. Sediment and hydrocarbons} within collection chamber. 3 monthly Monitor the build up of sediment and hydrocarbons in the collection chamber. When required the grate and silt basket can be removed to provide access to the collection chamber. Sediment and hydrocarbons can be sucked out from the chamber by a suitable pump out truck or equivalent. IDamage/vandalism to structures| lpresent? Monthly If damage or vandalism occurs replace affected items immediately. COMMENTS extended to 12 months. Arecord of the required initial clean out and pump out frequencies should be kept. This is to enable future loading and maintenance requirements of the GPT to be known. Fox Environmental systems recommend that initially the unit is cleaned out every 3 months. However, dependant on site conditions the interval between cleanouts can be Refer to Fox BPT600 housekeeping notes and schematic detail induded in Appendix C for further maintenance and operating advice for this unit. AG07310MM October 2009 ATijs Page 3 of 3
Page 74
APPENDIX C FOX BPT600 INFORMATION
Page 75
BPT600 Housekeeping To ensure that the Fox Model BPT600 unit performs the function for which it is installed there are some very basic housekeeping functions that need to be performed. The interval between these activities is very much site specific. A responsible approach to these functions will provide the maximum benefit to the environment. As Required: « When large items of floating debris (such as plastic bags, drink cans etc.) are observed on the inlet grate of the unit they should be collected and disposed of in a suitable manner. The Fox BPT600 does not capture these items; they are simply prevented from entering the stormwater discharge through the unit. If they are not removed they could still be harmful to the environment as they may be washed or blown off the site. Weekly ¢ Regularly inspect the unit for a build up of captured pollutants within the silt basket. This should be done on a weekly basis or more often if large quantities of silts are being retrieved. To empty the silt basket remove the grate from the chamber. Locate and remove the two M8 bolts at the comers and lift the grate out of the frame. Please note that the grate is heavy and proper care should be taken when removing it. For safety reasons the unit should never be left unattended when the grate and basket are removed. » Remove the silt basket and dispose of captured pollutants in a suitable manner such as emptying it in a garbage bin or similar. = Assoon as the basket has been emptied it must be replaced and the grate returned to its’ locked position. From time to time the chamber of the unit will need to be cleaned of silt build up and retained hydrocarbons. The frequency of this activity will depend on the site conditions of each installation. e Fox Environmental Systems recommend that initially the units are cleaned on a 3 monthly basis. Dependent on site conditions the interval between cleanouts can then be extended to 12 monthly. This service should consist of a minimum of the following activities. = With the silt basket removed check the contents of the chamber. If there is a build up of hydrocarbons on top use a suction pump to remove and dispose of the top portion. Captured hydrocarbons must be disposed of in a manner prescribed in the Environmental Protection Act. * Pump the remaining water from within the chamber and filter through a minimum 20 micron filter before allowing it to be discharged into the stormwater system. » Remove all silt and sediment build up from within the chamber and dispose of it in a suitable manner, such as emptying it in a garbage bin. = Following each service quantities of pollutants that are removed should be recorded to enable proper assessment of the serving frequencies required to be ascertained. For maximum environmental protection and to reduce maintenance costs the silt basket should always be in place within the unit. Fox Environmental Systems Pty Ltd offers a full service for the maintenance of the BPT600 units in SE Queensland. Contact our Service Manager on (07) 5437 8455 for information and costing.
Page 76
To lift grate remove 2x MB bolts. Schematic Detail of BPT600 System Class B Grate Silt Basket with High Flow By-Pass Silt Basket with High Flow Bypass To Stormwater 150 O.D. Outlet Pipe __Invert Level 320mm SPECIFICATIONS Material 12mm MDPE Hydrocarbons Chamber Volume 330 litres wrapped behind Grate Class ‘B/Galvanised battle. Treated Flow Rate 5 litres/second Maximum Flow Rate 20 litres/second Solids Capacity 50 litres | Sih Basket Capaci 50 lit Pre-cleaned water Sediment vapacly Y amm 99% exits via balfled ri Ox ENVIRONMENTAL Hydrocarbon Capture >95% outlet Available Options SYSTEMS Retention at Bytlow rate 100% 225mm Stormwater Outlet This Drawing ond design ia the Property Class 'D’ Grate of Fox Environmental Systems. Pty Ltd. It - mui be used for any other purpose Note: Inverts will change. than thot for which it wos issued. This Request detalls it required. drawing must not be shown or tent to anyone without the written parmission of the Fox Environmental Systems Pty Ltd. Project: System Specifications Drawing Title: PROCESS DETAILS BPT600 Assembly The Fox Model 8PT600 is a baffled pollutant trap with a high flow by-pass. It is designed for use in open areas where trash and other debris cannot be controlled and a potential for minor quantities of hydrocarbons exists. The unit has a controlled flow rate through the sift basket where trash and silt are removed. Runoff then enters the main _ chamber and exits via the battle, retaining minor quantities of hydrocarbons that may be present. 08/03/2007 tf the rain intensity exceeds the treatable flow rate the high flow by-pass allows excess runoff to exit directly via the baffle The Fox BPT600 has an efticiency of greater than 99% for the capture and retention of silts and solids smaller than ‘3mm. A4 - SPEC-1016
Page 77
UNIT BUILDING 43 TO 45 ELANDA STREET SUNSHINE BEACH GEOTECHNICAL INVESTIGATIONS CONTOUR CONSULTING ENGINEERS GEOTKPARO1334AA/A 22 January 2008 Coffey Geotechnics Pty Ltd ABN 93 056 929 483 PO Box 5537, Maroochydore QLD 4557 PH: 07 5445 4952 FAX: 07 5445 3764
Page 78
22 January 2008 Contour Consulting Engineers P. O. Box 7338 Sippy Downs Qld 4556 Attention: Mr Brendan Lowther Dear Sir, RE: Unit Building 43 to 45 Elanda Street - Sunshine Beach Geotechnical Investigation 1.0 INTRODUCTION Coffey Geotechnics Pty Ltd (Coffey) was commissioned by Mr Brendan Lowther of Contour Consulting Engineers on behalf of Oak Investment Holdings Pty Ltd to undertake geotechnical investigations for a proposed residential unit building at 43 to 45 Elanda Street, Sunshine Beach. The works proposed involve the construction of a five unit development including the excavation of a semi basement carpark and a swimming pool. The proposed depth of basement excavation is up to 2 metres below ground level. The building will be 3 storeys above ground. The area of the site is some 1500 square metres. 2.0 FIELD WORK AND INVESTIGATIONS Fieldwork was carried out under the direction of a Principal Engineer from Coffey's Kunda Park office on 15 January 2008. Five boreholes were drilled on the site to a depth of 4 metres. Borehole logs are attached together with explanatian sheets defining the terms and symbols used. The location of boreholes is shown in Figure-1A, DCP testing was undertaken to depths in excess of 3 metres at ail borehole locations. DCP blow counts are attached. Coffey Geotechnics Pty Ltd ABN 93 056 929 483 1/36 Kerryi Street, Kunda Park QLD 4556 Australla PO Box 5537 Maroochydore OLD 4558 Australia T (+61) (7) 8445 4952 F (+61) (7) 8445 3764 www.coffey.com GEOTKPAR1334AA/C ge gee
Page 79
Unit Building, Sunshine Beach Geotechnical Investigations 3.0 SURFACE CONDITIONS The site is located on the northeastern side of Elanda Street at Sunshine Beach. The ground surface across the site slopes to the northeast away from the street frontage at a gradient of about 17%. The lot has an existing timber framed house with mature trees, gardens and lawns. These will be removed as part of the development of the site. Low rise unit developments are present on adjacent properties on three sides. 4.0 SUBSURFACE CONDITIONS According to the 1:100 000 Geological Series mapping, sheet 9444 and part 9545, prepared by the Department of Mines and Energy Queenstland, the site is underlain by Pleistocene dunes (mapping unit Qpd1). These dunes consists of quartz sands in this area. The subsurface profile was inferred from Coffey'’s boreholes on the site. The soll profile generally consists of grey silty sand topsoils to depths of 0.3 to 0.4 metres overlying pale grey sands ta the limit of investigation. The sand strata were generally loose near the surface grading to dense and very dense with depth.. The loose sand was noted at depths between 0.3 to 0.5 metres near the street frontage (boreholes BH1 and BH2) but was much deeper, 0.9 to 1.4 metres, at the lower rear part of the site. Groundwater was not observed in boreholes on the site at the time of fieldwork on 15 January 2008. 5.0 DESIGN CONSIDERATIONS Shrink Swell Shrink-swell testing was not undertaken in this instance. Soil reactivity was assessed to be minimal in tha sandy upper soils on the site. Differential Settlements The soils on the site are deep dunal sands. Normally consolidated Clay strata are not anticipated. Same minor elastic settlements can be anticipated. These are likely to be some 10 to 20 mm depending on loads and location. Allowable Bearing Capacity The allowable bearing capacity is a function of depth and tocation on the site. For high level footings founded at depths greater than 0.3 metres near the front of the site in the vicinity of boreholes BH1 and BH2, an allowable bearing capacity of 100 kPa may be adopted for design. For the rear of the site in the vicinity of boreholes BH3, BH4 and BHS5, the sands are loose to depths of 1.4, 0.9 and 1.1 metres tespectively. The allowable bearing capacities are low and founding at shallow depth is not recommended. Deeper footings founded at depths between 1.1 and 1.6 metres is recommended. The founding strata at these depths are medium dense sands with an allowable bearing capacity of 100 kPa. Coffey Geotechnics , 2 GEOTKPAR1334AA/A, 22 January 2008
Page 80
Unit Bullding. Sunshine Beach Geatechnical Investigations Site Classification The site has been classified for footing design purposes as Class P as defined in AS2870-1996. This classification is due to the low bearing capacity in the upper soils over part of the site. Footings should be designed using engineering principles and the data from this report. Footing System The footing system adopted will depend on the geometry of the structure on the site, the nature and distribution of loads and the costs. It is likely that the structure could be Partially on a high level stiffened raft and partially on a piled footing. Alternatively, the loose soils may be excavated and recompacted. if recompacted under specified controlled conditions as et out in AS3798-2007, the soils may be regarded as controlled engineered fill and can be used to support the footing system. Where a combined footing is proposed, the stiffened raft footing system should be designed as an equivalent Class M raft as per AS2870 to allow for some differential movement between the piled and slab on ground components. Pile foundations typically fall into two categories, namely displacement piles and non-displacement piles. Displacement piles are those pile types that displace the soil surrounding the pile during installation, thus effectively improving the ground conditions. Non-displacement piles are those that are bored into the ground without effectively displacing soil materials, and therefore no improvement i is obtained from the in situ ground conditions. Examples of non-displacement piles are open bored piles or continuous-flight auger CFA piles. Screw piers are also a non-displacement type. Of the pile types indicated above, the displacement piles, CFA piles and screw piers have an advantage of not requiring pile hole support during construction. Open bored piles may require temporary or permanent casing to reduce the risk of collapse within the boreholes. Alternate piling types and their assessed advantages and disadvantages are shown in Table 1 below. Your piling contractor can provide details of the third piling option, the use of screw piers. Table 5: Piles Types and Assessed Advantages and Disadvantages Pile Type Advantages Disadvantages Bored Piles. Likely feast expensive option. Additional cost of spoil removal. Non-displacement Typically lower values of end bearing and lype Relatively widely available and understood shaft adhesion compared to displacement piles, due to mode of installation and lower confidence in pile performance. Water inflows and consequent wall stability may complicate construction. construction technology. Driven Pre-Cast Concrete Piles. High level of performance confidence. Relatively high noise and vibration during Increased design strength parameters due to installation may affect nearby developments ‘ i Would require dilapidation studies for Disp racement displacement type. adjacent structures and vibration monitaring typ No spoil removal issues. during construction. Splice joints may be required depending on depth, increasing cost. Coffey Geotechnics 3 GEOTKPAR1334AA/A 22 January 2008
Page 81
Unit Building. Sunshine Beach Geotechnical Investigations The design of piled foundations should include assessment of both strength and serviceability limit states. A geotechnical strength reduction factor of ©, = 0.65 should be applied to the ultimate strength values when considering the ultimate strength limit state. Where driven piles are adopted, should a suitable proportion be dynamically tested, a higher geotechnical strength reduction factor of ®, = 0.7 may be adopted. The geotechnical design parameters for pile design are a function of pile type, size, load and depth. The type and size of piles in turn depends on the relative cost of altemate piling systems and sizes. The most cost effective piling system can be designed by your piling contractor based on the Coffey borehole logs. Excavations Soils on the site to a depth of 3 metres may be excavated with conventional earthmoving equipment. Temporary open excavations in the medium dense to very sands should be battered back at a slope not steeper than 1.5 horizontal to 1 vertical where the excavation is above the water table and 3 horizontal to 1 vertical for excavations below the water table. Alternatively, engineered support systems must be adopted. Basement Retaining Wall Design Geotechnical parameters for retaining wall design are as follows:- Soil internal Angle of Friction 30 degrees Base Soil Angle of Friction 33 degrees Soil Unit weight 20 KN per cubic metre Minimum Depth of Toe Footing 0.5 metres Minimum Width of Toe Footing 0.6 metres Allowable Bearing Capacity Founding not recommended in loose sands. See above 100 kPa in medium sands to a depth of 2.4 metres 160 kPa in dense sands at depths greater than 2.4 metres Propped basement walls retaining drained sand or gravel may be designed assuming a rectangular pressure distribution with a maximum earth pressure of GH kPa acting over the wall where H is the total depth of excavation in metres. Where the sand or gravel backfill is undrained, the triangular hydrostatic pressure distribution must be added to the earth pressures. This does not take into account any additional lateral earth pressures produced by surcharges such as landscaping, adjacent structures or vehicles or heavy equipment. Lateral pressures due to shrink swell can be ignored. Coffey Geotechnics 4 GEOTKPAR13340A/A 22 January 2008 ao hae wb +
Page 82
Unit Building, Sunshine Beach Geotechnical investigations Dewatering It should be noted that although no water table was recorded at the time of investigations, during periods of prolonged heavy rainfall, short term water tables may develop. All footing, excavation and retaining wall design should allow for the possibility of higher groundwater levels. Reuse of Soils The soils to be excavated for the basement on the site are sands, silty.sands and some clayey sands. These soils are suitable for reuse as engineered fill if recompacted under a geotechnical overview. Some of these soils are acid sulphate soils however and their excavation and reuse should be undertaken in accordance with an approved acid sulphate soils management plan. Should you wish to discuss any aspect of this report, please contact Ron McMahon at Coffey's 's Kunda Park office. For and on behalf of COFFEY GEOTECHNICS PTY LTD PZ _RON MCMAHON ATTACHMENTS: Important information about your Coffey Report Figure 1-A Coffey Borehole Logs Caffay Geotechnics GEOTKPAR1I334AAV/A 22 January 2008 ee ee
Page 83
coffey > geotechnics SPECIALISTS MANAGING THE EARTH Important information about your Coffey Report As a client of Coffey you should know that site subsurface conditions cause more construction problems than any other factor. These notes have been prepared by Coffey to help you interpret and understand the limitations of your report. Your report is based on project specific criteria Your report has been developed on the basis of your unique project specific requirements as understood by Coffey and applies only to the site investigated. Project criteria typically include the general nature of the project; its size and configuration; the location of any structures on the site; other site improvements; the presence of underground utilities; and the additional risk imposed by scope-cf-service limitations Imposed by the client. Your report should not be used if there are any changes to the project without first asking Coffey to assess how factors that changed subsequent to the date of the report affect the report's recommendations. Coffey cannot accept responsibility for problems that may occur due to changed factors if they are not consulted. Subsurface conditions can change Subsurface conditions are created by natural processes and the activity of man. For example, water levels can vary with time, fill may be placed ona site and pollutants may migrate with time. Because a report is based on conditions which existed at the time of subsurface exploration, decisions should not be based on a report whose adequacy may have been affected by time. Consult Coffey to be advised how time may have impacted on the project. Interpretation of factual data Site assessment identifies actual subsurface conditions only at those points where samples are taken and when they are taken. Data derived from literature and external data source review, sampling and subsequent laboratory testing are Interpreted by geologists, engineers or scientists to provide an opinion about overall site conditions, their likely impact on the proposed development and recommended actions. Actual conditions may differ from those inferred to exist, because no professional, no matter how qualified, can reveal what is hidden by Coffey Geotechnics Pty Ltd ABN 93 056 929 483 earth, rock and time. The actual interface between materials may be far more gradual or abrupt than assumed based on the facts obtained. Nothing can be done to change the actual site conditions which exist, but steps can be taken to reduce the impact of unexpected conditions. For this reason, owners should retain the services of Coffey through the development stage, to identify variances, conduct additional tasts if required, and recommend solutions to problems encountered on site. Your report will only give preliminary recommendations Your report is based on the assumption that the site conditions as revealed through selective point sampling are indicative of actual conditions throughout an area. This assumption cannot be substantiated unti! project implementation has commenced and therefore your report recommendations can only be regarded as preliminary. Only Coffey, who prepared the report, is fully familiar with the background information needed to assess whether or not the report's recommendations are valid and whether or not changes should be considered as the project develops. If another party undertakes the implementation of the recommendations of this report there Is a risk that the report will be misinterpreted and Coffey cannot be held responsible for such misinterpretation. Your report is prepared for specific purposes and persons To avoid misuse of the information contained in your report it is recommended that you confer with Coffey before passing your report on to another party who may not be familiar with the background and the purpose of the report. Your report should not be applied to any project other than that originally specified at the time the report was Issued.
Page 84
.
Po
hs
Le
poe et a es
Fiéuke |-#
PR.
x=
on
ANDA STREET
/ Ad.
i , ety
j
/ i
tu, ti
, .
/ i {
/ i i
, i ts
a. wy =
+ i
| | he. -
{
4 f 4
| Po
q t
' a
‘Eby PLANTING CALCULATIONS
LEVEL 4 PLAN - ROOF PLAN & PLANT PLATFORM ora Atecud Hoeteg
Seine stage,
Popdsion Density Koes - Dat
ASM pROPENTY oescRIPHON .
4 SELANDA STREET, SUNSHINE BEACH . Pra fio
COTS 29 £ QO on HP Hi? Sle Core
‘HOSSACOUHCR
‘Usexpad Open Space
Heigtin Stree
Heigtin Mere
. . a . . Pd Get - - on Deaty
ON ORTON COSIGD | Besancon | eaakees ‘SSAPARTMENT DEVELOPMENT OAK INVESTENT HOLDING PL 1200@Al AUG 2007 AG
=
Derg
0710SD.01 (a)
FS Bon GOL AGSDD MCSD / Ryengad Ersa Suctath Adertecsben SStgmererre] 4 Pet
Belay eae 9 Ng donmereme pe Seneutereicey acta tem cserys —
m bg aa _gurttntseemity ig Ope ts taezth cour 5 = “3 n cH =
uuaynnorteroesancomsu | taste.
Page 85
coffey - geotechnics BoreholeNo. BA4 Engineering Log - Borehol mee GEO: ngineering Log - Borehole Project No:___ GEOTKPARO1334AA Client: CONTOUR CONSULTING Date started: 15.1.2008 Principal: Date completed: 15.71.2008 Project: 43-45 ELANDA STREET, SUNSHINE BEACH Logged by: DF. Gorehote Location: REFER PLAN Checked by: dri mode} and mounting: EDSON CPI Easting: stopa: ~30° R.L Surface: NOT MEASURED hote diameter. 100 mm Northing hearing: datum: drilling information material substance = - Tar notes Pare material 3|3a3 al tlt sttzel | 2h, gg| 2; [ERE] anttitaitton . g , € ch ris i 2] kPa a lel. lag wx [Sen i ‘Toe wcniajoimecremenee: = | #51 88 [atte i SILTY SAND: Tine to medum pramed, gray, wt 4 SAND: fine to medium grained, grey. el a MO - i ® pale gray. 4 4 8 a a ra z | a c 0 4 g 3 E z 4 5 - 5 5 4 é | 4 x Borehole BH1 terminated al 4m i | 4 4 3 & _ 4 | | E i & 4 4 6 Tmathod. ‘support sonsistoncylaaraity idan AS auger screwing’ M med Noni | notes, samptes, tests classification symbols ard vs vary sat AD suger dritings © casing Us undisturbed sample Somméameter | sot deseription s satt sy] ar reisrivieane ponotratian Vo ——_ufisturbed sampio 63mm ameter | pased on united classification F frm élw washbare et D disturbed sampla system St st S| ct cable teat Eee fangegto re N standard ion lest (SPT) vst vary sti Fe haned suger SPT - semple recovered mrotstre 4 hard Sor diatube water Ne SPT with sotid cone o dy Fo (adie aye blank bit zz ‘10/1798 watar level v vane shear (hPa) Momo ve very loosn, dye —— “ S Sh . s sampia Wa plastic iit 4 x Pe waterinfow sample _ 8 5 a ” “or —<d water uth 5 —e W. liquid limi ha very densa
Page 86
JOTECHVERTREV1.GL8. TEMPLATE FILE: COFFEY.GDT FRAME TITL @u DATE: 18.14.08 PROJECT FILE: GKOIZ34AA. GPJ. LIBRARY FILE @. nit Form GEO $.3 Issun 3 Rev.2 Ss Coffey ¢ geotechnics Borehole No. BH2 . ° : Sheet 1 of 1 Engineering Log - Borehole Project No: GEOTKPARO1334AA Client: CONTOUR CONSULTING Date started: 15,1.2008 Principal: Date completed: 15.71.2008 Project 43-45 ELANDA STREET, SUNSHINE BEACH Logged by: DF Borehole Location: REFER PLAN / Checked by: A i model and mounting: EDSON CPI Easting: slope: -80* . R.L. Surface: NOT MEASURED hole diameter: 100 mm Narthing bearing: datum: drilling information material substance hotes o 8 at . a. 3 i 5 capes. aia gs Hq i adianal sbsens tons gs} 8 & 3 ‘ depn| # a So¥ type: plasticity or particle characteristics, 23 a8 hPa ‘ E 123 RL meted @ a colour, secondary and minor components. 3288 - SILTY SANO:" fine to medium gramed, dark orey. M t SAND; “Tine to medium grained, pate grey, 7 MO 7 9 wW -| > . OF a 4 9 4 uy é 1 4 o 4 Borehole BH2 terminated at 4m 4 - 3 4 6 method support consistencyidensity Indox AS euger screwing? M mad N cf notes, sampios, tests classification symbols and vs vary sof Aa auger driing? c ee Us undisturbed sample SOmm dlemeter | soit description 8 son RR fatarfirieana Un undisturbed sample 62mm diameter | pased on unified classification F form w washbars: er 24. o disturbed sampta system s stl ct cable toot ie r N ‘anand paneirstion test (SPT) vst very sit HA hand cuger nt ‘SPT - somple recovered metsturo K hard ot diatuba Ne SPT wih soli cono 0 ay Fb triable a blank bit wi water va v vane shear (kPa) M moist ve very toose v V bil on dale shewn a prassuremeier Wo owat L toose ‘be chowaby cute Be woler infow e nant somata we en . 7 ag. aot Eb water cuton R rats Wi Gena ie vo very danse
Page 87
geotechnics coffey = DATE: 18,1.08 PROJECT FILE: GKOTSS4AA GPU. LIBRARY FIL Qrrorccnenmenias. TEMPLATE FILE: COFFEY.GDT FRAME TITL eo: Form GEO 5.3 sau a Rev.2 Borehole No. BH3 . . Sheet 1 of 1 Engineering Log - Borehole Project No: GEOTKPAR013340A Client: CONTOUR CONSULTING Oate started: 15.1.2008 Principat: Date completed: 75.17.2008 Project: 43-45 ELANDA STREET, SUNSHINE BEACH Logged by: OF Borehole Location: REFER PLAN Checked by: a dri mode! and mounting: EOSON CPI Easting: slope: -s0* R.L Surface: NOT MEASURED hote diameter: 100 mm Northing bearing: datum: drilling Information material substance 5 < sla 8 2 notes g|s matartal - 5 tructure and al Ele, |e ¢\3 es 5 2 BEE | aaa ns & 183 . Gepin a Soil type: plasticity or particte characteristics, 2/22] kPa é 123 3 $ RL [metrag 5 nv colour, secondary and minor componants. £ 8) 8a $ g 8 § ]. | SM [SICTYSAND: Tine to medium gramed, dark grey. wf v F ’ 4 SAND: fine to medhim grained, grey. 4 pale grey, 4 9 w 4 > & wl + 8 4 M0 2 6 4 z o 4 Borehole BH3 tenninated at 4m “| 4 4 4 4 -f 6 mathod ‘support consistoncyfdonsity Indox as auger screwing’ Motu N ont notes, samples, tosts ctassifieation symbols and vs ‘vosy soft AD auger driing? C casing io undisturbed sempia SOmm diametor soll descriptian s soft RR seflerficona penatration Us undisturbed sample 6mm dismater based on unified cassifention F frm w wmshbere DB stumped sampie oystiem st stitt cT eabie tact N standard test (SPT) vst vory stil HA hand auger N ‘SPT - sampie recovered moisture hk herd ot eiatute Ne SPT wit sa8d cone oO ay Fo iabte 8 blank bit 10/1/98 water tavel v vena shear (kPa) M moist vw vary ioose v vou ‘on data shown Pp pressuremeter Wwowat L jonsa T Te bit Bs out sampte Wh plnstic mit MD . Modum dense snuff DB water intow ‘anvronmental ‘ D a a aot ad water cutow Reet “ Kenet im vo very dense
Page 88
ECTECHVER7REVI.GLE. TEMPLATE FILE: COFFEY.GDT FRAME TITL eo DATE: 38.1.08 PROJECT PILE: GKO1S34AA.GPJ. LIBRARY FILL e@ Forn GEO 5.3 Issue 3 Rey.2 ap geotechnics coffey ? Borehole No. BH4 . . ‘ Sheet 1 of 4 Engineering Log - Borehole Project No: GEOTKPAR01334AA Client: CONTOUR CONSULTING Date started: 15.1,.2008 Principat: Date completed: 75.1.2008 Project 43-45 ELANDA STREET, SUNSHINE BEACH Logged by: OF Borehole Location: REFER PLAN Checked by: a drill medel and mounting: EDSON CPi Easting: slope: 20" RL Surface: NOT MEASURED hole diameter: . 100 mm Northing bearing: datum: drilling information material substance a notes 5 > s 8 g|s matertal sas structure and 3 i |, | toot en g|35 a : i 2 g 2 additional observations is . cep] & ie se type: plasisy or partite charactristes, 3 #2 Pa E] yea} a] & Rt |mared & |B colour, secondary and minor components. 2 3 | ages 3 AY SAND: fine to medum gramed, dark grey. M UC SAND: fine to medhim grained, grey. 4 .«pate grey. 7 a Ww 4 > i MD 4 uw 8 _ w z 9 4 5 = Sorehoie BH4 terminated at 4m 4 4 uy 4 4 4 4 a. 5 moths Support consistency/dansity Indox As euger screwing* M mud Mra | notes, samptes, teats classificatian symbols and vs very sof an auger driting’ C casing Us undisturbed sample SOmm diameter | san doseription s soft RR taltessicone popatration Us undisturbed sampie 62mm digmeter based on unified eassification 5 or washbers Ee o distuted sampta a ct cable iget fe fuge PN standard penetration lest (SPT) = wt tal HA hand euper ‘nfuad nN SPT - sample recovered metsturo " hard or eotuba watar Ne SPT win solid cone 0 ay Fb (rinks 5 ‘btamk Ott 10/193 water lavet Vv ono shear (kPa) 4 molst ve very loose Vv Vb on date shown P Pesmrometer Wow t toose T TCbi Bs bum sample Wo plastic ttmit MD madum dense “bit sutthe Pe waler inflow D we " aot —<@ water cuttow é refusal We Bould Git vo very once
Page 89
Form GEO 5.3 Issua 3 Rev.2 coffey “¢ geotechnics Borehole No. BH5 : S a HOLE. DATE: 181.03 PROJECT FILE: GKO13340A.GPJ. LIBRARY FILL Deorecivermeviae ‘TEMPLATE FILE: COFFEY.GOT FRAME TITL: @ 1 7 Sheet 1 of 4 Engineering Log - Borehole Project No: GEOTKPARO1334AA Client: CONTOUR CONSULTING Date started: 15.1.2008 Principat. Date completed: 15.71.2008 Project: 43-45 ELANDA STREET, SUNSHINE BEACH Logged by: OF Borehole Location. REFER PLAN . Checked by: A drill model and mounting: EOSON CPI Easting: stopa: 80" R.L. Surface: NOT MEASURED hole diameter. 100 mm Northing bearing: datum: drilling information material substance * § notes sales, matertat g structure and i t samies. § i 2 is £ additional observations i aj ayo 2 soll type: plasticity or particte characteristics, Bla 5 kPa 123|? g a colour, secondary and minor components. 8888 . SM | SILTY SAND: Tine to medium granied, graylbiown, i t FILL SP | SAND: fine to medium grained, pala Qray/grey. . . 7 SP | SAND: fine la medium grained, pale grey. NATURAL 4 MB 7 8 4 4 4 3 =z 4 4 4 \ — Borehole BHS terminated at 6m 2 4 4 4 5 ae 8 mathod ‘Support . consistency/gensity Indox AS auger serewing* M4 mua N nl notes, sompies, teats cingsification symbols and vs very sof aD auger driting* © casing Us undisturbed samplo SCamn diameter se dosertption s sam RR roterfrieone ponstration Us —- undisturbed sample Glmm diameter | posed on unified dassification F fren w washbore 4, eneletance oD Gsturbed sampte system st sti ct catia tect Esha] eoeging to N standard penetration test (SPT) vst very stil HA bond auger ehasai N SPT - sempta rocovered moisture 8 had oT diatuba water Ne SPT with sod cone D say Fo fricce a titan bit 10/1/98 watertever | v vane shear (hPa) M— molst “ very fenso v Vow on data shown Pp pressuremater Ww sfowet L loose T TC bi Bs butk sampia ? MD medium densa: “bit shown by sutflx De water inflow € enviranmental sample we tua o dense ag. agt —<§ water cuifiow . R vO very denso
Page 90
coffey geotechnics
dynamic
test results
SPECIALISTS MANAGING THE EARTH
enetrometer
1/36 Kerry] Street, Kunda Park, QLD.4556
Ph: {071 5445 4952 Eox: (07) 5445 3764
page 1 of 10
client :
principal :
project :
CONTOUR CONSULTING
43-45 Elanda Street, Sunshine Beach
focation : Refer Plan
job no: GETOKPARO1334AA
laboratary’: Kunda Park
January 18, 2008
GEOTKPARO1334AA-B
report date :
test raport no. :
test procedure :
AS1289 6.3.2
test date : 15/1/08
depth betow
surface
(mm)
Test Numbers
teadings recorded in blows per 100mm
BH1
test locations/remarks
100
200
300
~
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
wnlalalajalalafepayofufo]s
1700
1800
To wosion [HEL eT MUN Unog
1900
2000
2100
2200
2300
2400
2500
wofoajalalalapaj apa
2600
~
Ss
2700
70
General Information ;
Add
‘TBLYSIO}OVH AI}jOD {3
ee
NATTA
wome wseeameds
Aooncerraviced
This document is issued in accordance with NATA’s
accreditation requirements. Accreditad for compliance with
ISO/IEC 17028. This document may not ba reproducad
except in full.
NATA Accredited Laboratory
No. 431
Approved Signatory:
‘ o_O
Date: 14fe2,
Page 91
coffey
&.
3 :
= geotechnics
SPECIALISTS MANAGING THE EARTH
dynamic penetrometer
test results
1/36 Kerryl Street, Kunda Park, QLD,4556
Ph: 107) $445 4952 Fax: 107) 5445 3764
page 2 of 10
principal :
cliant: = CONTOUR CONSULTING
project: 43-45 Elanda Street, Sunshine Beach
location : Refer Plan
job no : GEOTKPARO1334AA
laboratory : KUNDA PARK
report date : January 18, 2008
lest report no. : GEOTKPARO1334AA-8
test procedure: =A4S1289 6.3.2
test date : 15/1/08
aa
depth below
surface
{mm}
tast numbers
readings recorded in blows par 100mm
BH1
tast locations/ramarks
2800
7
2900
3000
3100
3200
3300
3400
3600
3600
3700
3800
3300
4000
4100
4200
4300
4400
4500
U9 VOHRA LHEL ZI
4600
4700
4800
4900
5000
5100
$200
§300
§400
General Information :
NATTA
wom wancorteen,
SSendnrravvane
This document is issued in accordance with NATA’s
accreditation requiremants. Accredited tar compliance with
ISOMEC 17025. This document may not be reproduced
except in full.
No. 431
NATA Accredited Laboratory Date : 6 for
Approved Signatory: Y
Page 92
Be iH geotechnics SPECIALISTS MANAGING THE EARTH coffey 1436 Kerryl Street, Kunda Park, OLD.4556 Ph: (07) 5445 4952 Fax: (07) 5445 3764 dynamic penetrometer test results client: CONTOUR CONSULTING principal : Page 3 of 10 Job no : GEOTKPARO1334AA4 laboratory : KUNDA PARK report date : January 18, 2008 testreportno.: GEOTKPARO1334AA-8 Project: 43-45 Efanda Street, Sunshine Beach tocation : Refer Plan test procedure: 4$7289 6.3.2 test date : 15/7/08 depth below test numbers surface (mm) BH2 U9 UOHIOA LHELZ] omuny uo, readings recordad In blows per 100mm test locations/remarks 100 7 200 1 300 1 400 2 ~ 600 700 800 900 1000 1100 1200 1300 1400 16500 alwlalaelalol ni wl o]al]nr 1600 1700 1800 1900 General Information : 2000 2100 BY TRH wAGOT 2200 2300 2400 2500 Sibipajosy 4a] alninfoalafasalalala 2600 2700 ® OZ * BY This document is issued in accardanca with NATA‘s NATA Accredited Laboratory Data : (iffoe NATTA accraditation requirements. Accredited for compliance with No. 431 , ISOMEC 17025. This dacument may not be reproduced . . except in tuil. Approved Signatary: wome aegeenose Rcenuccrariore
Page 93
“& geotechnics. SPECIALISTS MANAGING THE EARTH coffey 1/36 Kerryi Street, Kunda Park, QLD,4556 Ph: (07) $445 4952 Fnx; (07) 5445 3764 dynamic penetrometer test results page 4 of 10 client : CONTOUR CONSULTING job no: GEOTKPARO1334AA Principal : taboratary : KUNDA PARK report date : January 18, 2008 lest report no. : GEOTKPARO1334AA-8 Project: 43-25 Elanda Street, Sunshine Beach location : Refer Plan test procedure: 457289 6.3.2 test date = 15/1/08 depth below ‘ test numbers surface (mm) BH2 @ 2800 10 t 2900 10 readings recorded in blows per 100mm test locations/ramarks TS GopeoA PRET cl oon WalOg 3000 1 3100 3200 3300 3400 3500 3600 3700 3800 3900 4000 e 4100 4200 4300 4400 4500 4600 General Information : 4700 4800 4900 §000 $100 5200 5300 5400 This document is issued in accordance with NATA’s NATA Accredited Laboratory Date : Mfifer accreditation requirements. Accredited for compliance with No. 432. SSO/MEC 17025. This document may not be saproduced ae - except in full. Approvad Signatary: HE RGGedorravian )
Page 94
=
coffey geotechnics
SPECIALISTS MANAGING THE EARTH
1/36 Kerryt Stsest. Kunda Park, QLD.4556
Ph: iQ7) 5445 4952 Fax: (07) 5445 3784,
2
dynamic penetrometer
test resu ts page 5 of 10
client: CONTOUR CONSULTING job no: GEOTKPARO1334AA
principal : laboratory : KUNDA PARK
Project: 43-45 Elanda Strest, Sunshine Beach raport date : January 78, 2008
location : Refer Pian test report no. : GEOTKPARO1334AA-8
ip
test procedure: AS7289 6.3.2 tast date : 15/1/08 3
depth below test numbers readings recorded in blows per 100mm :
surface Is
{mm} BH3 test locations/ramarks iS
| :
100 1 ie
io
200 2 >
300 1
400 2
soo 1
600 1
700 0
800 1
900 1
1000 1
1100 1
1200 1
1300 7
1400 ?
1500 2
1600 2
1700 2
1800 2
1800 2 General Information : ig
2000 3 iB
2100 3
2200 4 eg
is
2300 4 e
2400 5 :
2500 6
2600 7
2700 7
This focument is Issued i accordance wine NATAS
accreditation requirements. Accredited ter compliance wi
INLZAAT ZR ISOMEC 17025. This dacument may not be reproduced
except in full.
mane megoanens
SGanGENTA TION
NATA Aceredited Loborata: Date : Yor
Na. 431 ry “lf
Appraved Signatory: th: ph
Page 95
coffey
a
“e geotechnics
SPECIALISTS MANAGING THE EARTH
dynamic penetrometer
test results
1/36 Karryl Street, Kunda Park, OLD,.4556
Ph: (07) 5445 4952 Fax; {07} 5445 3764
page 6 of 10
principal :
client: CONTOUR CONSULTING
Project: 43-45 Elanda Street, Sunshine Beach
location : Refer Plan
job no: GEOTKPARO7334AA
laboratory : KUNDA PARK
report date : January 18, 2008
test report no. : GEOTKPARO1334AA-8
test procedure: AS77289 6.3.2
test date : 15/1/08
wi
depth below
surface
{mm}
test numbers
readings recorded in blows per 100mm
BH3
test locations/remarks
2800
2800
3000
10
3100
10
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
4300
4400
4600
15 WOSIA LEED CT
4600
4700
4800
4900
s000
5100
$200
§300
§400
General !nformation :
SACOD
NOSE AB)
SD0Z + BIT Ald
NATTA
Se
wore neaoowenn
RGaraarraricee
This document is issued In accordance with NATA‘s
accreditation requirements. Accredited for compliance with
ISOAEC 17025. This docurnent may not be reproduced
except in full.
NATA Accredited Laboratory Date : [ffer
No. 431 ;
Approved Signatory: _
a
Page 96
coffey & geotechnics
SPECIALISTS MANAGING THE EARTH
1/36 Kerryl Street, Kunda Park, QLD,4556
dynamic penetrometer
test results
Ph: (07). 5445 4952 Fax: {07) $445 3764
page 7 of 10
client: CONTOUR CONSULTING
job no: GEOTKPARO1334AA
principal : ; laboratory : KUNDA PARK
project: 43-45 Efanda Street, Sunshine Beach report date : January 18, 2008
location : Refer Plan test report no. : GEOTKPARO1334AA-B8
ay
test procedure: $7289 6.3.2 test date : 15/1/08 3
depth below tast numbers readings recorded In blows per 100mm ;
surfaca Ik
(mm) BH4 test locations/ramarks iS
<
s
100 1 3
in
200 - 1 iz
300 oO
400 1
500 1
600 “7
700 1
g00 1 ‘
900 1
1000 2
1100 2
1200 2
1300 2
1400 3 ’
1500 2
1600 3
1700 2
1800 3
1900 2 General Information : io
2000 4
a
2100 4 ie
2200 5 e
2300 5 a
2400 5 4
2500 6 iF
2600 7 e
2700 7
‘90
This gocumant a Issued a accordance mie NATA'S
accreditation requirements. Accredt for compfiance wit
REALTY ISONEC 17025. This document may not ba reproduced
ye except in full.
yume vedosrmese
AGunssianon
NATA Accredited Laborntory Date: /8//oo
No. 431 ry fe
Approved Signatory:
Page 97
coffey *
test
SS ,
@ geotechnics
SPECIALISTS MANAGING THE EARTH
dynamic penetrometer -
results
1/36 Kerry} Strest, Kunda Park, QLD.4556
Ph: (07) 5445 4952 Fax: (07) 5445 3764.
:
page & of 10
client :
Principal :
Project :
lacation :
CONTOUR CONSULTING
43-45 Elanda Street, Sunshine Beach
Refer Plan
job no: GEOTKPARO1334AA
laboratory : KUNDA PARK
report date : January 18, 2008
test report no. : GEOTKPARO1334AA-8
test procedure: AS71289 6.3.2
test date : 15/1/08
surface
(mm)
depth betow test numbers
readings recorded in blows per 100mm
BH4
tast locations/ramarks
2800
2900
3000
3100
10
3200
10
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
_ 4300
4400
4500
19 VOSA LHEL ZT oqunN Los
4600
4700
4800
4900
§000
5100
$200
$300
5400
Gangral Infarmation :
0D 12) LHOWWAdOD
jaOe
002 -
This document is issued in accordance with NATA's
NATTA accreditation requirements. Accredited for compliance with
{SONEC 17025. This document may not be reproduced
axcept in full.
wane rsaceriane
Scanaorravion
NATA Accredited Laborat Date: 45/1/05"
Ne tp cere 2 orutory Lif fe
Approved Signatory:
Page 98
coffey Be #° geotechnics SPECIALISTS MANAGING THE EARTH 2 41136 Kerryl Street, Kunda Park, QLD,4556 Ph: (07) 5445 4952 Fax: (07) 5445 3764 dynamic penetrometer test results pages of 10 cilent: CONTOUR CONSULTING Job no: GEOTKPAR01334AA principal : laboratory : KUNDA PARK project: 43-45 Banda Street, Sunshine Beach feport data : January 18, 2008 location : Refer Plan test report no. : GEOTKPAR01334AA-B test procedure : TOGUTN Eb be unBioA, 1 1} 300¢- PF AS12869 6.3.2 test date : 15/1/08 depth below test numbers readings recorded In blows per 100mm surface (mm) BHS test locations/remarks 100 1 200 1 300 0 400 1 500 0 600 1 700 0 800 1 900 1 1000 1 1100 1 1200 2 1300 2 1400 2 1500 3 1600 2 1700 3 1800 1900 3 General Information : 2000 3 2100 3 2200 3 2300 4 2400 6 2500 6 2600 a 2700 8 aw This document is issued in accordance with NATA’s NATA Accredited Laboratary Date: Wh fe s Raa A SSSR HE US ant may so BO reproutced Approved Slgnaton ~ —_— aveant tn Full . Ge =
Page 99
& os es, cotfey “¢’ geotechnics SPECIALISTS MANAGING THE EARTH dynamic penetrometer test results 1436 Kerryl Street, Kunda Park, QLD,4556 Ph; (07) 5445 4952 Fax: (07) 5445 3784 page10 of 10 principal : client: |§ CONTOUR’CONSULTING Project: 43-45 Banda Street, Sunshine Beach location : Refer Pan job no: GEOTKPAR01334AA laboratory : KUNDA PARK report date : January 18, 2008 test report no. : GEDTKPARO1334AA-B test procedure: 4S1289 6.3.2 test date : 15/1/08 depth below surface (mm) test numbers readings recorded. In blows per 100mm test locations/remarks PACE) OGY UO 2800 2900 300g 10 3100 10 3200 12 3300 3400 3500 3600 3700 3800 3900 4000 4100 4200 4300 4400 4500 bg UORUSA, 4600 Generat Information : 4700 4800 4900 6000 §100 6200 6300 5400 eS t=} LHORAOD Saeal 8002 * PT This document 1s Issued in accordance with NATA’s NATA Accredited Laboratory Date: 2¢ Ao" accreditation requirements. Accredited for compliance with No. 431 2 ° ISOVIEC 17025. This document may not be reproduced aversnt in full Approved Signatory:
Page 100
EXAMPLES OF GOOD HILLSIDE PRACTICE £28
VEGETATION
RETAINED
ACOF WATER
PIPED OFF SITE.
CUT A FILL
MINNISED
. a@eoaoce
ome
ere rourarons
NTO ROCK
SUBSOWL ORAINAGE
MAY BE REQUIRED
AE SLOPE
SEWERAGE EFFLUENT PUMPCD- OUT
OA COMMECTED [0 SEWEA,
TAMAS ADZGUATELY FOUNDED
ENGINEERED RESAULAKG WALLS
WITH SURTACE & SUBSURFACE
BRAINAGE COUSTRUCTED
SEFORE HOUSE
EXAMPLES OF POOR HILLSIDE PRACTICE
UMSTABILISED
ROCK TOPPLES
VEGETATION
IMADEQUATELY
ar PALS OF FOUNDED
ROCK
VEGETATION
REMOVED .
SATURATED
SLOPE Fale.
Se
ia
\ PouDlD WATER ENTERS
SLOPE & ACTIVATES SUP
FIGURE 1 Illustrations of Good and Poor Hillside Practice
This ‘gure Is on dxtract fram CEQTECHNICAL RISKS ASSOCIATED WITH HILLSIDE OEVELOPIMENT as presented in Australian
Geomechanics Nawa, Number $0, December, 3985, which discusses tho mattar mare Sully.
Page 101
REFER OPERATIONAL WORKS h
PLANS FOR EXTERNAL WORKS ;
GENERAL PATHWAYS
ass coNcRET Ro 400mm THIGK CONCRETE SLAB PATIOS OVER FILL AREAS
REINFORCED WITH REINFORCED WITH 125mm THICK CONCRETE SLAB
SL72 MESH 50 BTM COVER e SL72 MESH|40 TOP COVER REINFORCED WITH
\ lz) : SL82 MESH 50 TOP COVER \
é \
PROVIDE GALV R16 DOWELS (600 LONG) @400 CTS
VERTICAL BETWEEN POOL SHELL & RW3.
REFLECT JOINT IN RENDER FINISH,
PATIOS OVER FILL AREAS
125mm THICK CONCRETE SLAB
REINFORCED WITH
SL82 MESH 50 TOP COVER
yaavauds 3A)
MAIN BUILDING STRUCTURE
€LANDA STREET
Fi
PROVIDE GALV R16 DOWELS (600 LONG) @400 CTS
POOL 3
ps VERTICAL BETWEEN POOL SHELL & F2
a i REFLECT JOINT IN RENDER FINISH
i \ z
eee wo
= Me &
Tee 3
2 .
7M] wwercnse
_Z{_* 8
Flot | °
GENERAL PATHWAYS cumaen ef) | exo | s are
100mm THICK CONCRETE SLAB an , |
REINFORCED WITH l +
$L72 MESH 40 TOP COVER ANORNS PLANS FOR if GAS BOTTLE STORE
ot 400mm THICK CONCRETE SLAB
8 4 DRIVEWAY SLAB DETAILS 3 REINFORCED WITH —
Rw2 RWI = S$L82 MESH 40 TOP COVER
[Coe ae oe Sa waeeeae 1
FA [ FA 1
«) FINAL EXTENT OF SHEETPILINGTOBE |
DETERMINED ON SITE. DESIGN AND | :
INSTALLATION BY PILING CONTRACTOR (
LEGEND
FA FENCE TYPE 1 - REFER DETAIL
STRUCTURAL SITE PLAN F2 FENCE TYPE 2 - REFER DETAIL
SCALE 1:200 RW1 RETAINING WALL TYPE 1 - REFER SECTION A 4 s
RW2 RETAINING WALL TYPE 2- REFER SECTION B 9 ; § 10m
RW3 _ RETAINING WALL TYPE 3 - REFER SECTION D Pe
f SCALE 1:200 3
8 Rev | DATE | COMMENT By nD PLAN DETAILS: PLAN TITLE
CONTOUR || 5 APARTMENT BUILDING SS SSS ae = | STRUCTURAL SITE PLAN
= + Ru
a Consulting €ngineers ?:| 43-45 ELANDA ST, SUNSHINE BEACH Once ans
ore ———=—| OAK INVESTMENT HOLDING P/L a: = ane
Ee Pheri] Seka ats naan ES | Lely. [ nm 508859.0 nam 8 meet on
arial te acd kr caeinriin sina pia een gral j oats SHELLEY ope 773)
Page 102
:
; 300MM THICKNESS OF SITE
. OR IMPORTED CLAY LINING
LH BOND BEAM 1/N12 HORZ : MATERIAL.
SPOON DRAIN TO COLLECT
ARTI ‘ SURFACE WATER AND
CULATION NOTE: 1. DIRECT AWAY FROM WALL.
oe BUILDER TO PROVIDE VERTICAL CONTRIL JOINTS aera —
- AS DETAILED TO BLOCK [email protected] MAX CTS. A
5 MV 5mm -{—— BOND BEAM 1/N12 HORZ
Ss 7” yo
a2 M COVER |_-— N12-400 HORZ
2 € [77 - 71
aS + ' 4 N42-400 VERT x
& 7] OPTIONAL WATER PROOFING - - ~~ OPTIONAL STONE FACINGTO
7 ; iON 8
5 12-400 VERT To SUT ARCHITECTURAL A | | ARCHITECTS SPECIFICATI g
OPTIONAL WATER PROOFING S Lt N12-400 HORZ —_ “lf. [}] | stean our stock
TO SUIT ARCHITECTURAL 3 FREE DRAINING —— ‘f 4 YY N12.300 DIST
REQUIREMENTS AND FINISHES. ~\ 2 GRANULAR BACKFRL ch a: i wta-oo LAP 600 an
Qa ” i. 4
= | Wolly. WITH WALL REO
/-—— CLEAN OUT BLOCK : 4 FSL
2 i 908 SLOTTED PVC DRAIN IN MN =
git GEOTEXTILE FABRIC IN FREE 47+! g
ag: DRAINING GRAVEL TO ; FB I
gz 7 N16-400 VERT DISCHARGE AWAY FORM OS EPR
ge 7 |
gs 600 LAP TO 300 SERIES FOOTINGS TO FREE OUTLET. aco
s 600 LAP TO 200 SERIES
e : " |
55 COVER RETAINING WALL TYPE 2
4 eT SECTION 73)
SHEET PILING — N20-400 300 COG SCALE 1:20 \9.0/
BY OTHERS uy BOND BEAM
cr | 2IN12 @400 CTS HORZ. BOND BEAM |. | Leal |
a | Ly TO 300 SERIES DRIVE WAY SLAB REFER N12 HORZ N12 HORZ
x a 5 OPERATIONAL WORKS PLANS
S A Wty | | N12-800 VERT N12-600 VERT
az| —l | LAP 600 WITH LAP 600 WITH z
e=! 7 I PLANTING \ | STARTER BARS pas STARTER BARS S
w a <= =
es| iy | LLi{ = N42-400 HORZ a! | 3
s | = 200 SERIES BLOCK WORK ——| 3 125mm THICK PATIO
3 ay z CORE FILL REINFORCED ’ SAB WITH SL82, VER
if = CORES ONLY :
= 2 200 SERIES BLOCK WORK —~
S5COVER | i |) 3 CORE FILL REINFORCED
= N12-400 HORZ Lede CORES ONLY
os ‘C’ BLOCK
ay
= 28 2
a ss gs
6 Ly 2 3> BACKFILL
8 7 NE
il = | cl es =
— =! . ‘hr | i
TW 4 au ju
uy 34L11TM TOP & BTM a {,3-.11TM Top & BTM —
= WITH R10 LIGS @450 CTS! 4) WITH RIO LIGS @450 CTS 7 |
Th iS ! 4 ~e
ca Ee '+ STARTERITIE BARS —= =3
— = 2 i 3
a 7 LL: ; | N42-800 VERT H th
= = i: I [I
+ iq | —— S —
Ep pl i TE oq ——
aA LE RETAINING WALL TYPE 1 - MW 1d lF
SECTION — FENCE TYPE | DETAIL FENCE TYPE 2 DETAIL
SCALE 1:20 SCAEID SCALE 1:20
»§ CORITOUR. || 5 APARTMENT BUILDING panne a «| SITE RETAINING WALLS AND FENCE DETAILS
Rh iB Consulting Engineers 23) 43-45 ELANDA ST, SUNSHINE BEACH : Crectcet aw
. reese OAK INVESTMENT HOLDING P/L Oe
remap eePMMMMRMEM So iccctticd Sunscrieusstmctcunimnncnmans Jas estan dees PEP Eiccisighins | enn SOBBS 8.1 ronson B SMe, oF
Pests on sruntls cucnenen a S :
f i,
Page 103
coffey > geotechnics SPECIALISTS MANAGING THE EARTH 11 August 2008 Contour Consulting Engineers P. O. Box 7338 Sippy Downs Qld 4556 Attention: Mr Brendan Lowther Dear Sir, RE: Unit Building 43 to 45 Elanda Street - Sunshine Beach Foundation Design Certification 1.0 INTRODUCTION Coffey Geotechnics Pty Ltd (Coffey) was commissioned by Mr Brendan Lowther of Contour Consulting Engineers on behalf of Oak Investment Holdings Pty Ltd to undertake geotechnical investigations for a proposed residential unit building at 43 to 45 Elanda Street, Sunshine Beach. The works proposed involve the construction of a five unit development including the excavation of a semi basement carpark and a swimming pool. The proposed depth of basement excavation is up to 2 metres below ground level. The building will be 3 storeys above ground. The area of the site is some 1500 square metres. Subsurface investigations were undertaken by Coffey in January 2008. The data from investigations and recommended footing systems were set out in Coffey report GEOQTKPAR1334AAVA dated 22 January 2008. Subsequently, Coffey was engaged in August 2008 to review the footing design systems and certify that the designs conformed to the requirements of the Coffey geotechnical report. 2.0 FIELD WORK AND SUBSURFACE CONDITIONS Fieldwork was carried out under the direction of a Principal Engineer from Coffey’s Kunda Park office on 15 January 2008. Five borehotes were drilled on the site to a depth of 4 metres. DCP testing was undertaken to depths in excess of 3 metres at all borehole locations. The soil profile generally consists of grey silty sand topsoils to depths of 0.3 to 0.4 metres overlying pale grey sands to the limit of investigation. The sand strata were generally loose near the surface grading to dense and very dense with depth. The loose sand was noted at depths between 0.3 to 0.5 metres near the street frontage (boreholes BH1 and BH2) but was much deeper, 0.9 to 1.4 metres, at the lower rear part of the site. Groundwater was not observed in boreholes on the site at the time of fieldwork on 15 January 2008. Coffey Geotechnics Pty Ltd ABN 93 056 929 483 GEOTKPAR1334AAC 1/36 Kerryl Street, Kunda Park QLD 4556 Australia PO Box 5537 Maroochydore QLD 4558 Australia T (+61) (7) 5445 4952 F (+61) (7) 5445 3764 www.coffey.com
Page 104
Unit Building, Sunshine Beach Foundation Design Certification 3.0 DESIGN CONSIDERATIONS AND RECOMMENDATIONS Soil reactivity was assessed to be minimal in the sandy upper soils on the site. Some miner elastic settlements can be anticipated. These are likely to be some 10 to 20 mm depending on loads and location. The allowable bearing capacity is a function of depth and location on the site. For high level footings founded at depths greater than 0.3 metres near the front of the site in the vicinity of boreholes BH1 and BH2, an allowable. bearing capacity of 100 kPa was recommended for design. For the rear of the site in the vicinity of boreholes BH3, BH4 and BH5, the sands were loose to depths of 1.4, 0.9 and 1.1 metres respectively. Founding at shallow depth in this area was not recommended. Deeper footings founded at depths between 1.1 and 1.6 metres were recommended. The founding strata at these depths were medium dense sands with an allowable bearing capacity of 100 kPa. Basement design parameters and piled footing considerations were provided. 4.0 FOUNDATION DESIGN AND CERTIFICATION The engineering design was undertaken by Contour Consulting Engineers. The design is set out ina series of drawings prefixed 5083. The footing designs are set'out in Drawings S 2.0, S 2.1 and S 2.2. The design shows a full piled footing system with strip footing beams. Pile depths are not specified but pile ‘axial load capacities are set out in the drawings. The design meets the requirements of our design recommendations. It is hereby certified that the foundation type and design for the structure, retaining walls and swimming pool .are in accordance'with the design requirements of our geotechnical report. This certification is subject to the achievement of the pile load capacities specified in the drawings. The capacity of all piles should be certified by the piling contractor. Should you wish to. discuss any aspect of this certification, please contact Ron McMahon at Coffey’s Kunda Park office. For and on behalf of COFFEY GEOTECHNICS PTY LTD —_ ” RON MCMAHON ATTACHMENTS: Important information about your Coffey Report Coffey Geotechnics 2 GEOTKPARI334AA/A 22 January 2008
Page 105
i ‘ coffey Y geotechnics SPECIALISTS MANAGING THE EARTH Important information about your Coffey Report As a client of Coffey you should know that site subsurface conditions cause more construction problems than any other factor. These notes have been prepared by Coffey to help you interpret and understand the limitations of your report. Your report is based on project specific criteria Your report has been developed on the basis of your unique project specific requirements as understood by Coffey and applies only to the site investigated. Project criteria typically include the general nature of the project; its size and configuration; the location of any structures on the site; other site improvements; the presence of underground utilities; and the additional tisk imposed by scope-of-service limitations imposed by the client. Your report should not be used if there are any changes to the project without first asking Coffey to assess how factors that changed subsequent to the date of the report affect the report's recommendations. Coffey cannot accept responsibility for problems that may occur due to changed factors if they are not consulted. Subsurface conditions can change Subsurface conditions are created by natural processes and the activity of man. For example, water tevels can vary with time, fill may be placed ona site and pollutants may migrate with time. Because a report is based on conditions which existed at the time of subsurface exploration, decisions should not be based on a report whose adequacy may have been affected by time. Consult Coffey to be advised how time may have impacted on the project. Interpretation of factual data Site assessment identifies actual subsurface conditions only at those points where samples are taken and when they are taken. Data derived from literature and external data source review, sampling and subsequent laboratory testing are interpreted by geologists, engineers or scientists to provide an opinion about overall site conditions, their likely impact on the proposed development and recommended actions. Actual conditions may differ from those inferred to exist, because no professional, no matter how qualified, can reveal what is hidden by Coffey Geotechnics Pty Ltd ABN 93 056 929 483 earth, rock and time. The actual interface between materials may be far more gradual or abrupt than assumed based on the facts obtained. Nothing can be done to change the actual site conditions which exist, but steps can be taken to reduce the impact of unexpected conditions. For this reason, owners should retain the services of Coffey through the development stage, to identify variances, conduct additional tests if required, and recommend solutions to problems encountered on site. Your report will only give preliminary recommendations Your report is based on the assumption that the site conditions as revealed through selective point sampling are indicative of actual conditions throughout an area. This assumption cannot be substantiated until project implementation has commenced and therefore your report recommendations can only be regarded as preliminary. Only Coffey, who prepared the report, is fully familiar with the background information needed to assess whether or not the report's recommendations are valid and whether or not changes should be considered as the project develops. If another party undertakes the implementation of the recommendations of this report there is a risk that the report will be misinterpreted and Coffey cannot be held responsible for such misinterpretation. Your report is prepared for specific purposes and persons To avoid misuse of the information contained in your report it is recommended that you confer with Coffey before passing your report on to another party who may not be familiar with the background and the purpose of the report. Your report should not be applied to any project other than that originally specified at the time the report was issued.
Page 106
ac coffey > geotechnics SPECIALISTS MANAGING THE EARTH important information about your Coffey Report Interpretation by other design professionals Rely on Coffey for additional assistance Costly problems can occur when other design professionals develop their plans based on misinterpretations of a report. To help avoid misinterpretations, retain Coffey to work with other project design professionals who are affected by the report. Have Coffey explain the report implications to design professionals affected by them and then review plans and specifications produced to see how they incorporate the report findings. Data should not be separated from the report* The report as a whole presents the findings of the site assessment and the report should not be copied in part or altered in any way. Logs, figures, drawings, etc. are customarily included in our reports and are developed by scientists, engineers or geologists based on their interpretation of field logs (assembled by field personnel) and laboratory evaluation of field samples. These logs etc. should not under any circumstances be redrawn for inclusion in other documents or separated from the report in any way. Geoenvironmental concerns are not at issue Your report is not likely to relate any findings, conclusions, or recommendations about the potential for hazardous materials existing at the site unless specifically required to do so by the client. Specialist equipment, techniques, and personnel are used to perform a gecenvironmental assessment. Contamination can create major health, safety and environmental risks. If you have no information about the potential for your site to be contaminated or create an environmental hazard, you are advised to contact Coffey for information relating to geoenvironmental Issues, . Coffey Geotechnics Pty Ltd ABN 93 056 929 483 Coffey is familiar with a variety of techniques and approaches that can be used to help reduce risks for all parties to a project, from design to construction. It is common that not all approaches will be necessarily dealt with in your site assessment report due to concepts proposed at that time. As the project progresses through design towards construction, speak with Coffey to develop alternative approaches to problems that may be of genuine benefit both in time and cost. Responsibility Reporting relies on interpretation of factual information based on judgement and opinion and has a level of uncertainty attached to it, which is far less exact than the design disciplines. This has often resulted in claims being lodged against consultants, which are unfounded. To help prevent this problem, a number of clauses have been developed for use in contracts, reports and other documents. Responsibility clauses do not transfer appropriate liabilities from Coffey to other parties but are included to identify where Coffey’s responsibilities begin and end. Their use is intended to help all parties involved to recognise their individual responsibilities. Read all documents from Coffey closely and do not hesitate to ask any questions you may have. * For further information on this aspect reference should be made to “Guidelines for the Provision of Geotechnical Information in Construction Contracts" published by the Institution of Engineers Australia, National Headquarters, Canberra, 1987. 72620 107-08
Page 107
13/4/09 Hi lan Further to our conversation on Tuesday please find below the application fees for a new application at the above address. These are based on plans submitted for application no 08/1168. PLAN EXAM 3.2.1. Minimum fee $764 3.2.3. External Works $383 3.3.2. Minor Earthworks $395 3.4 ‘Sediment & Erosion $127 Pavement Design $222 . 3.7 As Constructed $195 Jotels” KECRL- : INSPECTIONS 4.1.1. External Works: $842 4.1.2 Internal Works $917 Landscaping $1806 Sewer (Conditions 33-36 of 07/2174) ‘ Minimum fee ~ $1033 Regards Annie Evans - Administration Support Officer Operational Works Assessment Branch (Tewantin) Sunshine Coast Regional Council ’ Locked Bag 72 . Sunshine Coast Mail Centre Qlid 4560 Ph: 07 5449 5261 | Email:[email protected] .
Page 108
- Le ndcee pi nS
DEVEL@>MENT FEES & CONTRIBUTIONS @
(Cashier: Please Retum to Admin Officer, Development)
1
Legal Document Examination .
Road / Drainage Plan Exam
Road / Drainage Field Inspection
Sealing Fee - Survey Plans, Legal Documents
| Sale of Documents, Policy Lists, Misc
| Bonding Admin Fee (Contributions, uncompleted works)
Closed Circuit TV Inspection
Pre- lodgement Meeting Fee
Lot Calculation
RO dias
Seer eel
EE 20 PE AMOUNT.“
“Developer Contribution - Cndetng ~
PE!| Plan Examination Calculation
Developer Contribution - Road Other than PSP
Developer Contribution - Drainage Other than PSP
Developer Contribution - Pathway Other than PSP :
Developer Contrib. — in Lieu Off St Parking (PSP13 Car parking)
Developer Contribution - Other Parks and Community
ICS ~ Public Transport
* Ties= Community Land (Not currently active)
Inspection Calculation
Catchment:
ICS - Sewerage (PSP Rural)
ICS ~ Sewerage (PSP Coastal}
ICS - Sewerage - South Peregian (PSP Maroochy)
ICS - Water Supply (PSP)
Road/Section:
payee Name: Alt + 7 Vthe
ICS - Sport and Recreation Land (PSP Parks)
ICS - Drainage (PSP Noosaville Master & Ward Street)
ICS - Road (CMRNICP) If BA not entered then use 594
ICS - Pathway (PSP)
Address:
fo (Majo Lesign
PO fox (261
Noosa HENS Qo bSEF
Total of Fees Paid (Excluding Bonds)
Development Location:
438-485 Elende Steel Jyrdine
heck
Seoutly Deposis/Performance/Maintenance/Uncompleled Works Bond .
Total of Fees Paid (Including Bonds)
et TRECEIBTOTYPET| Fite Numbers or Reference:
51 (Cat 9)
Lim
PuLand Developmen EES & CONTRIBUTIONS/DEVELOPMENT FEES doc is titel b68%~)
Fa bIS Pler exem }
he -2004,1382-1
Date application properly made:
Receipt No: SSF
12/1 0f OF |
| Receipt Date: ltofee _|
Me eds Meyer Bisigny
Page 109
t
@ | @
sunshine Coast — “Avacsereaciyers
Regional Council
PO Box 141, Tewantin, Q 4565
ABN 37 876 973 913
Please present to Cashier when
PAY-IN
2007/2008
making payment
PSE DRG Ld
Jlaack ene. bea
Suacl develop
1
CCTV Inspection (2007/08 $5.00/ineal m) N/A 588 (32/12008.423.716)
Checking as-constructed data (2007/08 $135) N/A 586 (32/12008.423,715)
Sewerage SCADA YES 595 (15001:267.917)
Water Connections, Relocation of Meters
2007/08 20mm $995, other sizes by quotation) N/A 30/616/16000.423.783
Water Meter Testing (2007/08 $142 for 20 & 25mm) N/A 589 (32/16000.423,785)
Fema noe
Water/Sewerage Plan Examination . Ste,
2007/08 - $80 (W) $105 (S) per lot | N/A | 1283 _| 985 G27 2008.423.714) ) 43-4 A Z nde of
Water/Sewerage Field Inspection
2007/08 $70 (W) $95 (S) per lot N/A L 586 (32/12008.423,715)
Live Sewer Inspection (2007/08 $160.00) N/A 586 (32/12008.423.715) | |
Water Cut-ins (receipt type 30)
, wa4793.901.784 |
Sewerage Cut-ins, HCB cut-ins N/A
N/A
YES
YES
{receipt type 30) W4395.901.782
W5261.901.889 |
1300.419.889 _|
116 (31/15000.423.781)
t—-
Sewer manholes — Pre-quoted Works
mani
| Sewer as-constructed plan (2007/08 -$8 incl of 73¢ GST)
| Lock & Weir Key (2007/08 $55/$110 incl of GST) 214 (10119.215.723)
AEP DIATE.
of (70 ja IS GA
Address |/0 Nox (26 Nooss ficds @ IEF
File/s J. 2009-1382. Total incl. GST _$ /OS3 ——
GAWORD'FORMS\WS Payment Schedule green > fax tempt ; 7
yme lule green - memo. fax templai = fal cha, Cbek- fn tp io,
esdoe = =
[th yéEé
Name
Total GST $
|
Date Paid:
Receipt No:
S68/8F
.
! Cashier - please return form to W&S Section
Page 110
OPERATIONAL WORKS eee 50830PW2 ff SITE PLAN 50830PW3 ff EAR EARTH WORKS, SEDIMENT AND EROSION CONTROL DETAILS 5S APARATMENT DEVELOPMENT Sete 50830PW7 | INTERNAL DRIVEWAY AND STORMWATER DETAILS SUNSHINE BEACH OAK INVESTMENT HOLDINGS P’L PLAN TITLE se | LOCALITY PLAN AND DRAWING SCHEDULE AT 43-45 ELANDA ST, SUNSHINE BEACH apa pee =H OR OAK INVESTMENT HOLDINGS P/L y ne spetfces aneseee 7 oe PUNNs SOB3-OPWI xcvson B sHeet 1 oF @
Page 111
=
7 .
~~
NEW KERB & CHANNEL ——
REFER SHEET 5 FOR DETAILS
EXISTING RETAINING WALL
TOP APPROX. RL 456
7 43°00"
4 47 456
NEW ROAD WIDENING
REFER SHEET § FOR DETAILS \\_, 7 —
Zz
/ +l __ir suk rm |
( =eaqee ly DENOTES APPROX LOCATION OF
| i TREES TO BE RETAINED, CONFIRM
| t a =r } WITH LANDSCAPE DRAWINGS
NEW 1.5m WIDE CONCRETE ———___| =e e+ = = 4
FOOT PATH REFER SHEET 5 | Ty
FOR DETAILS Pao
| SECTION OF DRIVEWAY POSITIONED |
| UNDER BUILDING ALIGNMENT
|
| |
) |
=
iy |
i Bl
e i
n 8 |
zc 3
a El as
= al
a |
| =
! F
|
|
/ STORM WATER DETENTION
BASIN AND LEVEL SPREADER
REFER SHEET 8 FOR DETAILS
\ SE —T I —— jy PROVIDE EASEMENT OVER
\ = ; = j = REMAINING SEWER IN ACCORDANCE
\ WITH MCU CONDITION 35
\
3 N EXISTING SEWER MAIN TO BE SHORTENED
TO 1.5m NORTH OF EXISTING SEWER
NEW Ww
EW Don WIDESCROSSCVER MANHOLE IN ACCORDANCE WITH MCU
CONDITION 34
49 765 :
| 223°00' i |
NEW INTERNAL CONCRETE DRIVEWAY TANK CAPACITY 24,000L (16WCx1500L) '
REFER SHEET 6 FOR DETAILS REFER PLUMBING DRAWINGS |
1
\
|
SITE PLAN
SCALE 1:200
PLAN TITLE:
SITE PLAN
5S APARTMENT DEVELOPMENT |
AT 43-45 ELANDA ST, SUNSHINE BEACH Ss eee
FOR OAK INVESTMENT HOLDINGS P/L = ee
e <
CONTOUR
Consulting Engineers :
2.197 081 08
sHeet 2 of @
Page 112
PROPOSED TEMPORARY CONSTRUCTION —4
“\— BATTER 1v TO 1.5h IN ACCORDANCE WITH \
GEOTECHNICAL REPORT Z ‘ PROPOSED BUILDING RETAINING STRUCTURE
REFER FUTURE STRUCTURAL ENGINEERING
{ ‘ DRAWINGS
( CO ) )
/ \ / , 7 \ \
/ /
/ ~ VW DENOTES TEMPORARY SEDIMENT FENCE
/ ae | | FINAL EXTENT TO BE REVIEWED AND
/ DETERMINED ON SITE
| | x WALL HEIGHT 1.8m
| DENOTES APPROX LOCATION OF
2 TREES TO BE RETAINED, CONFIRM
S | WITH LANDSCAPE DRAWINGS
S|
al
2 |
= |
“|
ie |
uw
w |
7 |
E
no |
<x
a | .
2 |
=a
a | |
1
ROCK FILTER DAM WITH OVER-TOPPING CREST
| LOCATED AT CENTER LINE OF LEVEL SPREADER
| ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
|
|
| CONSTRUCT LEVEL SPREADER
| | DURING INITIAL EARTHWORKS STAGE
| REFER SHEET 8 FOR DETAILS
4S | \ A
YS
\ - EXCAVATE DETENTION BASIN DURING INITIAL
\ es EARTHWORKS STAGE
\ Te LINE SIDES WITH GEOFABRIC AND LOOSE PLACED
STONE PITCHING AS REQUIRED
ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
- - \. \ |
L <
PROPOSED TEMPORARY \L
—) CONSTRUCTION ees DENOTES TEMPORARY SEDIMENT FENCE |
SITE PLAN FINAL EXTENT TO BE REVIEWED AND
SCALE 1-200 DETERMINED ON SITE |
PROPOSED TEMPORARY CONSTRUCTION PROPOSED BUILDING RETAINING STRUCTURE
ELANDA BATTER 1v TO 1.5h IN ACCORDANCE WITH REFER FUTURE STRUCTURAL ENGINEERING
STREET GEOTECHNICAL REPORT DRAWINGS
PROPOSED BUILDING OUTLINE EXCAVATE DETENTION BASIN DURING INITIAL
EARTHWORKS STAGE
a a LINE SIDES WITH GEOFABRIC AND LOOSE PLACED REE TNE OF LEVEL SPREADER
STONE PITCHING AS REQUIRED
| cut ; PAD LEVEL 48.40 ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
Sree
y-— CONSTRUCT LEVEL SPREADER
/ DURING INITIAL EARTHWORKS STAGE
REFER SHEET 8 FOR DETAILS
SECTION A
SCALE 1:200
PLAN TITLE
CONTOUR | 5 4PaRTMeENT DeveLoPpMeNnT = = eT poe wx | GARTH WORKS, SEDIMENT AND
Consulting Engineers 4;| AT 43-45 ELANDA ST, SUNSHINE BEACH | = T cece as EROSION CONTROL PLAN
EEE KOR OAK INVESTMENT HOLDINGS P/L = ; : er oe
lata rea hanna . I oO ae: | mane 6083 = OPWE ween B armen 9 oF 8
cr
Page 113
oe
a BERM (300mm MIN HEIGHT)
RUN-OFF FROM PAD
DIRECTED TO SEDIMENT TRAP
GEOTEXTILE FABRIC —
BIDUM U34 OR SIMILAR
UNBOUND PAVEMENT MATERIAL (GRAVEL) TO.
GRADING 'B', TABLE 9 OF QUEENSLAND TRANSPORT
SPECIFICATION MRSS11.04 - EXCLUDE MATERIAL
FINER THAN AS SIEVE 2.36mm
TEMPORARY CONSTRUCTION ENTRY / EXIT
NOT TO SCALE
1.00 FORM U-SHAPED CREST TO ENSURE
=) _/ OVER-TOPPING AT CENTRE OF DAM
GROUND LEVEL
“Wear —
LOOSE PLACE ROCK PITCHING
(NOMINAL STONE DIAMETER TO BE APPROX' 150mm)
| NOMINAL 400mm HEIGHT
OSSaNer
f NOMINAL 250mm DEPTH
TEMPORARY ROCK FILTER DAM - TYPICAL SECTION
NOT TO SCALE
3.0m MAX
SPILL THRU WEIR
3.0m MAX (IF REQUIRED) F42 GEOFABRIC
—_—_ — FABRIC (TO AS 1304)
600 | 200
a 1
‘
600 | :
POSTS OR STEEL PICKETS
SEDIMENT FENCE DRIVEN 600mm INTO
NOT TO SCALE GROUND
5 APARTMENT DEVELOPMENT
CONTOUR
117 081 688
2
Consulting Engineers 3;| AT 43-45 ELANDA ST, SUNSHINE BEACH pd .
FOR OAK INVESTMENT HOLDINGS P/L i.
P % F see poe neten
STORMWATER
_RUN-OFF
1:2
_ 1:6 TURF STRIP (1.0m WIDE). BALANCE OF
EXPOSED SURFACE TO BE TOPSOILED
AND GRASS SEEDED
CUT-OFF DRAIN DETAILS
NOT TO SCALE
TURF STRIP SURROUND,
IF REQUIRED.
(400mm MIN WIDTH)
GEOTEXTILE FABRIC TO
BE SECURELY POSITIONED
UNDER GRATED LID AS
ALLOTMENT
PIT
PIT PROTECTION
(AL BEF ORE COMMENOING
NOT TO SCALE
EARTHWORKS NOTES
REV | DATE | COMMENT BY CHKD
a 13.06.08
8 1805.08 C APPROVAL. ou 8
e
A
SEDIMENT & EROSION CONTROL
PROG
TIVE/TARGE
Bue
OBE DIVERTED AROUND
TOBE INSTALLED IN
DRMALLY LOCATED ALONG THE
1/A PER 100M LENGTH OF FENCE
MAY BE USED.
HAN
Ra
ICANT SEDIMENT RUNOFF IS NOT
OBE
€ARTH WORKS, SEDIMENT AND
EROSION CONTROL DETAILS
| rune BOBS - OPWA nmin B omer #068
Page 114
“
ROADWORKS NOTES
1 THE CONTRACTOR SHALL ESTABLISH THE LOCATION. LINE & LEVEL OF
ALL PUBLIC & PRIVATE UTILITY SERVICES PRIOR TO COMMENCEMENT
OF ANY CONSTRUCTION. WHERE UTILITY SERVICES ARE SHOWN ON
THE PLANS. THEY ARE SHOWN FOR THE INFORMATION OF THE
CONTRACTOR ONLY THE PRINCIPAL SHALL NOT BE LIABLE FOR ANY
OMISSION OF SERVICES FROM THE PLANS OR THE ACCURACY OF ANY
SERVICES SHOWN ON THE PLANS.
SURFACE LEVELS OVER THE SITE HAVE BEEN INTERPOLATED THROUGH
COMPUTER MODELLING OF FIELD SURVEY DATA THESE CALCULATED
LEVELS MAY VARY FROM THE ACTUAL GROUND LEVEL
ALL CONSTRUCTION LEVELS SHALL BE SET BY THE CONTRACTOR WITH
REFERENCE TO SURVEYED BENCH MARKS PROVIDED BY THE
PRINCIPAL'S APPOINTED SURVEYOR
4 SUBGRADE EVALUATION IS TO BE UNDERTAKEN IN ACCORDANCE WITH
THE PROCEDURES OUTLINED IN ARRB SR41 - ASTRUCTURAL DESIGN
GUIDE FOR FLEXIBLE RESIDENTIAL STREET PAVEMENTS.
5, ALL KERBING SHALL CONFORM TO NOOSA SHIRE COUNCIL'S
RELEVANT STANDARD DRAWINGS.
6 PAVEMENT MARKINGS AND SIGNS PROVIDED IN ACCORDANCE WITH
THE QUEENSLAND MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.
7, PROVIDE TELSTRA AND ENERGEX CONDUITS UNDER CONCRETE DRIVE-
WAYS, WHERE DIRECTED.
SET-OUT OF ROAD AND DRAINAGE WORKS IS AVAILABLE TO CONTRACTOR
FROM CONTOUR ENGINEERS DIGTAL MODEL
NOTE
EXTENT OF CONNECTION TO BE DETERMINED ON SITE DURING
CONSTRUCTION BY ENGINEER & COUNCILS FIELD OFFICER.
150
150
TOTAL SEAL OVERLAP = 300mm
(SMOOTH TRANSITION TO
EXISTING BITUMEN)
SAW-CUT EXISTING
PAVEMENT
INDICATIVE SAW-CUT DETAIL
SCALE 1:50
EXISTING PAVEMENT NEW PAVEMENT
DRIVE OVER KERB
30mm ASPHALTIC AND CHANNEL
CONCRETE SURFACING
FSL
100mm THICK BASE COURSE MATERIAL (TYPE 2.2) - CBR 60 MIN (SOAKED) ON
100mm THICK SUB-BASE COURSE MATERIAL (TYPE 2.4) - CBR 45 MIN (SO;
2 100mm THICK LOWER SUB-BASE COURSE MATERIAL (TYPE 2.5) - CBR 15
ASPHALTIC CONCRETE
PAVEMENT DESIGN (INDICATIVE)
SCALE 1:50
EXISTING EDGE OF BITUMEN
DENOTES EXISTING
SURFACE LEVEL
'
'
DENOTES EXTENT OF
NEW PAVEMENT SEAL!
30.000 | cal
1
ELANDA STREET
EXISTING CENTRE LINE “nel
10 woo |
1 ce &
'
'
'
'
ase 5
0.000
| JOIN NEATLY TO
| EXISTING KERB &
| CHANNEL
'
|
JAKED) ON
MIN (SOAKED).
%* NOTE
FINAL PAVEMENT DEPTH TO BE CONFIRMED FOLLOWING
SITE SOIL TESTS UNDERTAKEN IN THE EXCAVATED ROAD
BOX BY THE GEOTECHNICAL CONSULTANT
\
LAYOUT P'
CONTOUR
Consulting Engineers 3
2-117 061 160
P Se Ce E
SCALE 1:200
5 APARTMENT DEVELOPMENT
AT 43-45 ELANDA ST, SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L
\
Le
JOIN NEATLY TO EXISTING
KERB & CHANNEL
EXISTING CONCRETE
FOOTPATH
FOOTPATH
+— NEW SEMI-MOUNTABLE
KERB & CHANNEL
REFER ARCHITECTS PLANS
FOR SET OUT
NEW 5.5m WIDE
CROSS OVER
JOIN NEATLY TO EXISTING
FOOTPATH
EXISTING CONCRETE
FOOTPATH
JOIN NEATLY TO EXISTING
t— NEW 1.5m WIDE CONCRETE FOOTPATH
4630
= TING CONCRETE a
EXISTING ROAD 3s EXIS cs cl &
CENTRELINE KR FOOTPATH 5
“ a
“OATUMS1O) EH
30.000
NEW 1.5m WIDE 4
CONCRETE FOOTPATH a
2 |
a
a
-DATUMSI0 tf ee es StS
20.000
SAW CUT EXISTING PAVEMENT SUB-SOIL DRAINAGE IN
AND JOIN NEATLY & SMOOTHLY ACCORDANCE WITH
NSC STD DWG
4760
52
2360 a
5 5 & NEW 1.5m WIDE a,
S Ine CONCRETE FOOTPATH ©
9)
ST 4.8% ST 26%
GATOMSI OG) a a eye err er ON pee einen ree REE elie eae
10.000 NEW DRIVE OVER KERB AND
CHANNEL IN ACCORDANCE
WITH NSC STD DWG No. 9001
| 4610 |
ve EXISTING CONCRETE 8
o> @° FOOTPATH a
32 e ©
“ 2.2% a |
JORTUM SIG 3 gee
0.000
KERB AND CHANNEL
ELANDA STREET CROSS SECTIONS
SCALE 1:100
CAUTION - EXISTING SERVICES
THE CONTRACTOR IS TO DETERMINE THE EXACT LOCATION OF
ALL EXISTING SERVICES IN THE VICINITY OF THE PROPOSED
WORKS PRIOR TO THE START OF ANY CONSTRUCTION
THE COST OF ANY RECTIFICATION WORKS DUE TO DAMAGE TO
EXISTING SERVICES SHALL BE BORNE BY THE CONTRACTOR
A
e
EXTERNAL ROAD AND
FOOTPATH WORKS PLAN
DRIVE OVER KERB
AND CHANNEL
SCALE 1:20
punns SOB3 - OPS REVISION. B
sneer 6 of @
Page 115
( \
\ \ \
> )
— —
¢ >
a ) |
/ r ’ GPT J
7 a K | . N
/ foi — = | —S aes c he DN ISOS SOO ry ec Nis
/ xPL 48.55 \ PL asada . ;
\ PL 48
1
| FAL Bt \ ‘
\
| XPL ABS | gy | .
\ d Ne teeees el eee | i \a-
oP BO | .
| i | UNIT 4
f 1 FFL4860
| i | POOL
| \
| UNIT \ if i |
FFL4860 = (
i \
| | | 8h Basar (
3 z= | . ‘
2 | 8 1 \ \. \
2 2 | | 7 PAVEMENT NOTES
3 d ao
pn z = | 1 CJ A
l '
a| 2 Tt / \
8 “ i i x
=| a \ UNIT2 Fi v
2 g Peer | & FFLAB.60 UIT : 4s
Fri = ' FF Cabs VU - \ "
g SJ 5 hee et
| 2 Fabs shine aos bs Sear ) ( 10s \
| r | (
_ | . 4
wu |
wi
ac
Ee | UNIT 5
wn | FFL 48.60 A
a |! fy tH WE ee it
a |
Zz |
|
7 |
oo a
( Li 4 LEGEND
\ | — — — _ DENOTES EXISTING SEWER LINE
\ ~ — | ee ee OE tm CN QO CORR em DENOTES PROPOSED STORM WATER LINE
\ ! 1 i _ REFER NOTES ON SHEET 7
\ | | ! | ca \ oT GROSS POLLUTANT TRAP
4 a! FOX BGPCT +FB OR APPROVED EQUIVALENT
\ 8 a ‘« g | 3 | Bh ~« 13 \ los INSPECTION OPENING TO SURFACE
Ve > | & 8! ! ! \ SJ SAW JOINT REFER DETAIL
NEW 5.5m WIDE | z | a @| i ! a —_—, cl CONSTRUCTION DOWEL JOINT REFER DETAIL
tesa =! KERBIAND CHANNEL | _&|
CROSS OVER
t
L GPT
PROPOSED CONCRETE ACCESS DRIVEWAY —
PROFILED TO SUIT N.S.C. std dwg 9020 AND AS2800 STORMWATER DETENTION BASIN AND LEVEL
CUT RETAINING WALL REFERFUTURE — L FILL RETAINING WALL REFER FUTURE SPREADER REFER SHEET 8 FOR DETAILS
STRUCTURAL ENGINEERING PLANS, SITE PLAN STRUCTURAL ENGINEERING PLANS
SCALE 1:200
PAVEMENT DETAILS
THICKNESS MATERIAL TYPE CBR (soaked) MIN COMPACTION
CURVE IN ACCORDANCE 10mm CONCRETE -SL82MESH — 25MPa
WITH NSC STD 9020 100mm SUBBASE COURSE 25 15 98% MOD (MOD)
{ SLAB CONSTRUCTION AND JOINTING TO BE IN ACCORDANCE WITH
ELANDA TO RESIDENTIAL STREETS & PATHS" - CEMENT & CONRETE
STREET 2 8 IN OF AUSTRALIA
> CONCRETE PAVEMENT HAS BEEN DESIGNED FOR LIGHT COMMERCIAL & SERVICE
a TRAFFIC LOADINGS ONLY CONCRETE PAVEMENT HAS NOT BEEN DESIGNED
FOR CONSTRUCTION TRAFFIC OR HEAVY VEHICLE LOADING.
. BARRIER KERB
> AND CHANNEL
z GARAGE ENTRY a
a FFL 48.65 Ps
1 “OPT J FALL VARIES
8) curve g 9 ‘ | 1in33 TO 1in100
| APPROX g 3 =
DATUM 46.0 tin 50 a! tin2 tne = tin 100 az n 100 a NS J
a fata} = [| . ja
TPPSOr TYPICAL CROSS SECTION
SCALE 1:200
DRIVEWAY LONG SECTION
SCALE 1:200
PLAN TITLE
bears ax | INTERNAL DRIVEWAY AND
Credied awe | STORMWATER PLAN
5S APARTMENT DEVELOPMENT
AT 43-45 ELANDA ST, SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L
CONTOUR |
Consulting Engineers 323
@ 07 5433 977 G@® 07 5493 6888 GD acmin@ConourC= com au
o Arte punne SOBS- OPWE revision B sHeet 6 oF @
Page 116
PROP BDY
SL 43.40
CONCRETE 2000
DISSIPATER
g8]siaz65 |b
su43.60 [>
=
WIER WITH DISSIPATER +]
- - _———_|
REFER DETAIL \
(=
(
TURF {
BASE ti
pi.
2
s
= tind
o-
Na
L
z/ ‘
“]
ROCK RETAINING —}—= :
WALL <1m L_.sss— CC
> $L.43.47 YS.
CONCRETE —~
DISSIPATER
L
al SL43.70
\
yo
gwPIPE, _| —:
ACCESS
| BATTER 1in4
i
PROP BDY
STORM WATER DETENTION BASIN &
LEVEL SPREADER DETAIL PLAN
SCALE 1:100
CONTOUR
Consulting Engineers é
DP lume FB eG eerste
oO. :
2117 08) 60)
©
5S APARTMENT DEVELOPMENT
AT 43-45 ELANDA ST, SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L
LEVEL SPREADER
SL43.60
300W x 450D TRENCH FILLED
WITH 40-808 WASHED GRAVEL
WRAPPED IN GEOTEXTILE FILTER
WITH 1008 AGG PIPE
LEVEL SPREADER
SL43.60
LEVEL SPREADER
SL43.60
| DETENTION BASIN DESIGN
THE DETENTION BASIN AND LEVEL SPREADER HAVE
BEEN DETAILED IN ACCORDANCE WITH DUKE
ENVIRONMENTAL REPORT No. AA07731SMP
TO COMPLY WITH MCU CONDITION 28, 29 & 30
EXISTING TREES
TO BE RETAINED
DENTENTION BASIN
{ \ 2.0m x 11.0m
f
|
NSL | ROCK RETAINING
WALL <1m SL44.11
as
Q100 REA
ROCK RETAINING WALL <1m Q2RL 43.89 —
=
LEVEL VARIES
$L43.55-43.40
LEVEL SPREADER
SL43.60
a
a
a
ting 3
| =
BASIN BASE
$143.65-43.6
| 300W x 450D TRENCH FILLED
WITH 40-808 WASHED GRAVEL
SECTION WRAPPED IN GEOTEXTILE
FILTER WITH 100@ AGG PIPE
SCALE 1:50A3
CONCRETE
DISSIPATER [ee RIPE
CONCRETE
APRON SL43.60 &
CLEAR WIER OPENING \ im
n
vu
C8 g o—5 > 2
CF 3 S ° e
— B
a
=
ROCK RETAINING F S ee
WALL <1mSL44.11 8 -
. i ia
CONCRETE —
WIER SL44.0
WIER DETAIL PLAN
SCALE 1:50
CONCRETE
WIER SL44.0 CONCRETE
DISSIPATER SL43.55
LEVEL SPREADER
CONCRETE —— $143.60
APRONSL4360 | +
| 1 ! ' ~~
225 PIPE i
Drawn:
Checket
Datum
Lam hd: |
ecto 1736
SECTION
SCALE 1:50 3
PUAN TITLE
DETENTION BASIN PLAN AND DETAILS
pun ne S083 - OPWBE xcvsun B
‘SHEET
68 o 8
Page 117
STORMWATER DRAINS
PROVIDE SAW CUT TO SLAB
GENERAL
WITHIN 3 HOURS MAXIMUM SL82 MESH, 50 TOP COVER N16 TRIMMER BAR General Provide stormwater drains to connect downpipes, surface drains, subsoil
OF INITIAL CONCRETE SET.
SLAB JOINTS AS SHOWN ON PLAN EDGE THICKENING drains and drainage pits o the outlet point or pont of comracton
DEEP TO PERIMETER
200 4
t
|
|
|
LI
|
|
|
|
150
«|
ay
75
100
CUT 100 FROM EVERY SECOND
TRANSVERSE WIRE
CENTRALLY UNDER JOINT.
\cwwouces CRACK @+—_ CBR 15 (TYPE 2.5)
r SUB BASE COURSE
1
SAW JOINT (SJ) COMPACTED SUBGRADE i 100,
SCALE 1:20
Bed piping on a continuous underlay of bedding material, at least 75mm
fer compaction. Grade the underlay evenly to the gradient of the pipeline
TYICAL PAVEMENT DETAIL It necessary, form chases to prevent projections such as sockets and flanges
from bearing on the tench bottom or underiay
SCALE 1:20 Pipe surrounds
General Place the material in the pipe surround in layers 200 mm loose thickness,
‘and compact without damaging or displacing the piping,
Anchor blocks
it necessary, provide anchor blocks which restain lateral and axial movement of the
pipelines at junctions and changes of grade or direction
Encasement
General. If necessary. encase the pipeline in concrete at least 150 mm above and
below the pipe, and 150 mm each side or the width of the tench, whichever is the
greater, Concrete Grade N20 AS 1379
SUBSOIL DRAINS
General
Provide subsoil drains to intercept groundwater seepage and prevent water build-up
6mm x 110mm SQUARE HOT DIP GALVANISED PROPOSED a btn wal nner fr pts Coc nbd a aren
"DANLEY" DIAMOND DOWELS AT 600 CRS PAVEMENT SLAB -FLEXABLE ae
P Size &Ci:
INSTALLED IN ACCORDANCE WITH SEALANT OVER {dorm mitimurn slat ooordarce nh ASKS
MANUFACTURERS SPECIFICATIONS 50 50 APPROVEDISEALANT ite
— ee ee — > _——_ == =
Pipe depth
Provide the following minimum clear depths, measured tb the crown of the pipe,
NON COMPRESSABLE XC FORMED CONSTRUCTION JOINT 10mm COMPRESSABLE Trench width Minimum 450 mm,
DANLEY" DIAMOND DOWEL FOAM BOARD ips Undartay
where the pipe passes below the following elements
ABUTTING PAVEMENT, INLET 100 mm below formation level of the pavement, kerb or channel.
. 4 General: Grade the trench fi
SLEEVES AT 600 CRS fer a Tack cvtach ay rrepul
\
}._PITOR OTHER STRUCTURE ee telco
Seintng
‘At junctions of subsoil pipes provide tees, couplings or adaptors io AS 2439 1
to the gradient of the pipeline Ifthe trench
ith compacted bedding materia. Bed piping
on a continuous underlay of bedding material, at least 75 mm thick after
CONSTRUCTION JOINT (CJ) TYICAL PAVEMENT DETAIL compaction. Lay the pipe with one line of perforatons at the bottom.
Fe a ee ee ee Chases. If necessary, form chases to prevent projections such as sockets and flanges
(DIAMOND DOWEL) SCALE 1:20 from bearing on the trench bottom or underlay
Pipe surrounds
SCALE'1:20 General. Place the material in the pipe surround in layers 200 mm loose thickness,
and compact without damaging or displacing the piping
Depth of overiay
To the underside of the bases of overlying structures such as pavements, slabs
General: Provide polymeric fabric formed from plastic yarn composed of at least 85
by weight propylene, ethylene, amide or vinyledenechioride, and containing stabilisers
(oF inhibitors which provide resistance to deterioration due to utr aviolet light
Marking, To AS 3705
Protection, Provide heavy duty protective covering. Store clear of the ground and out
ight. During installation do not expose the fiter fabric to suniight for
ss Filter socks
permeable socks capable of retaining particles of 0.25 mm size.
Securely fit or join the sock at each joint
PITS
Finish to exposed surfaces
General’ Provide a smooth, seamiess finish, using steel towelled render or concrete
[-———_———_ cast in steel forms
L
450 10 150
Corners: Cove or splay internal comers
Matal access covers and grates
Standard: To AS 3986.
Cover levels: Top of cover or grate, including frame
In paved areas. Flush with the paving surface
In landscaped areas. 25 mm above finished surface
610
BARRIER KERB
AND CHANNEL
SCALE 1:20
CONTOUR 3 5 APARTMENT DEVELOPMENT INTERNAL DRIVEWAY AND
Consulting Engineers :.| AT 43-45 ELANDA ST, SUNSHINE BEACH STORMWATER DETAILS
FOR OAK INVESTMENT HOLDINGS P/L
e
@ 07 433 977 G® 07 5493 6988 GD acmin@comourC= com au
sHeetT 7 of @
Used in these records
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.