Item 6:
Item 7:
Item 8:
@ Item 9:
{tem 9.1:
Item 9.2:
Please refer to ‘Spice Consulting’ drawings numbered 693-OP 1, 693-OP2 & 693-OP3.
6.1 - Roof stormwater runoff, collection and control methods are detailed on Spice
Consulting Drawings.
6.2 - All site stormwater, including the roof water drainage, discharges to the rear of the
site via a detention basin and level spreader as recommended by Duke Environmental.
No stormwater discharge occurs to the street frontage.
6.3 - Contour Consulting Engineers operational works plans (ref: 5083-OPW1 to OPW8)
(previously submitted with Operational Works Application) indicate how the stormwater is
to be controlled and discharged, consistent with the recommendations in the report
prepared by Duke Environmental. Refer to Spice Consulting drawings which shows water
tank overflow connecting into this system.
Enclosed is a copy of the ‘Stormwater Detention System Maintenance Manual’ as
prepared by Duke Environmental who are also the designers of the system. A copy of the
approved maintenance plan shall be incorporated into the Community Management
Scheme for the development as required by condition 30 of the MCU negotiated decision
notice. A copy of the Community Management Scheme shall be provided to Council by
the developer prior to commencement of the approved use.
Please refer to the Maintenance plan prepared by Duke environmental as outlined in item
7 above.
Enclosed is a copy of Coffey Geotechnics PTY LTD - ‘Geotechnical Investigations’ for the
site of the proposed new development.
Contour Consulting Engineers have prepared structural design documents for the project.
Contour's design has given consideration to the recommendations of the Geotechnical
engineers report. Enclosed are copies of the relevant drawings showing details of the
retaining wall and footing system. (Contour Drawings numbered 5083 $ 9.0 & 5083 S$ 9.1)
Please refer to Coffey Geotechnics PTY LTD letter dated 11'* August 2008 which certifies
that Contour Consulting Engineer's structural design complies with the recommendations
of the geotechnical report.
All piers, retaining wails, etc are solely located within the subject property. No consent is required from
adjacent property owners for access to their properties.
My client will arrange for the relevant consultant to prepare an ‘existing conditions survey’ as required by
condition 46 of the MCU negotiated decision notice. My client will submit a copy of this survey to Council a
minimum of 10 days prior to the commencement of any works.
My Client will arrange for payment of all required bonds and contributions as required by the MCU decision
@ notice prior to issue of Operational Works decision notice.
I trust this constitutes a full and properly made application and request that Council proceeds with assessment
of same ASAP.
Please do not hesitate to contact the writer should there be any queries.
lan Gorton
MOJO DESIGN | ABN 57 891 982 115 | PO Box 1261. Noosa Heads QLD 4567 | T +617 5447 5394 | E [email protected]
Page 2 of 2
ee
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.