Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
coffey > geotechnics SPECIALISTS MANAGING THE EARTH 11 August 2008 Contour Consulting Engineers P. O. Box 7338 Sippy Downs Qld 4556 Attention: Mr Brendan Lowther Dear Sir, RE: Unit Building 43 to 45 Elanda Street - Sunshine Beach Foundation Design Certification 1.0 INTRODUCTION Coffey Geotechnics Pty Ltd (Coffey) was commissioned by Mr Brendan Lowther of Contour Consulting Engineers on behalf of Oak Investment Holdings Pty Ltd to undertake geotechnical investigations for a proposed residential unit building at 43 to 45 Elanda Street, Sunshine Beach. The works proposed involve the construction of a five unit development including the excavation of a semi basement carpark and a swimming pool. The proposed depth of basement excavation is up to 2 metres below ground level. The building will be 3 storeys above ground. The area of the site is some 1500 square metres. Subsurface investigations were undertaken by Coffey in January 2008. The data from investigations and recommended footing systems were set out in Coffey report GEOQTKPAR1334AAVA dated 22 January 2008. Subsequently, Coffey was engaged in August 2008 to review the footing design systems and certify that the designs conformed to the requirements of the Coffey geotechnical report. 2.0 FIELD WORK AND SUBSURFACE CONDITIONS Fieldwork was carried out under the direction of a Principal Engineer from Coffey’s Kunda Park office on 15 January 2008. Five borehotes were drilled on the site to a depth of 4 metres. DCP testing was undertaken to depths in excess of 3 metres at all borehole locations. The soil profile generally consists of grey silty sand topsoils to depths of 0.3 to 0.4 metres overlying pale grey sands to the limit of investigation. The sand strata were generally loose near the surface grading to dense and very dense with depth. The loose sand was noted at depths between 0.3 to 0.5 metres near the street frontage (boreholes BH1 and BH2) but was much deeper, 0.9 to 1.4 metres, at the lower rear part of the site. Groundwater was not observed in boreholes on the site at the time of fieldwork on 15 January 2008. Coffey Geotechnics Pty Ltd ABN 93 056 929 483 GEOTKPAR1334AAC 1/36 Kerryl Street, Kunda Park QLD 4556 Australia PO Box 5537 Maroochydore QLD 4558 Australia T (+61) (7) 5445 4952 F (+61) (7) 5445 3764 www.coffey.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.