coffey > geotechnics

SPECIALISTS MANAGING THE EARTH

11 August 2008

Contour Consulting Engineers
P. O. Box 7338
Sippy Downs Qld 4556

Attention: Mr Brendan Lowther

Dear Sir,

RE: Unit Building
43 to 45 Elanda Street - Sunshine Beach
Foundation Design Certification

1.0 INTRODUCTION

Coffey Geotechnics Pty Ltd (Coffey) was commissioned by Mr Brendan Lowther of Contour Consulting
Engineers on behalf of Oak Investment Holdings Pty Ltd to undertake geotechnical investigations for a
proposed residential unit building at 43 to 45 Elanda Street, Sunshine Beach. The works proposed
involve the construction of a five unit development including the excavation of a semi basement carpark
and a swimming pool. The proposed depth of basement excavation is up to 2 metres below ground
level. The building will be 3 storeys above ground. The area of the site is some 1500 square metres.

Subsurface investigations were undertaken by Coffey in January 2008. The data from investigations
and recommended footing systems were set out in Coffey report GEOQTKPAR1334AAVA dated 22
January 2008. Subsequently, Coffey was engaged in August 2008 to review the footing design
systems and certify that the designs conformed to the requirements of the Coffey geotechnical report.

2.0 FIELD WORK AND SUBSURFACE CONDITIONS

Fieldwork was carried out under the direction of a Principal Engineer from Coffey’s Kunda Park office
on 15 January 2008. Five borehotes were drilled on the site to a depth of 4 metres. DCP testing was
undertaken to depths in excess of 3 metres at all borehole locations.

The soil profile generally consists of grey silty sand topsoils to depths of 0.3 to 0.4 metres overlying pale
grey sands to the limit of investigation. The sand strata were generally loose near the surface grading
to dense and very dense with depth. The loose sand was noted at depths between 0.3 to 0.5 metres
near the street frontage (boreholes BH1 and BH2) but was much deeper, 0.9 to 1.4 metres, at the lower
rear part of the site. Groundwater was not observed in boreholes on the site at the time of fieldwork on
15 January 2008.

Coffey Geotechnics Pty Ltd ABN 93 056 929 483 GEOTKPAR1334AAC
1/36 Kerryl Street, Kunda Park QLD 4556 Australia

PO Box 5537 Maroochydore QLD 4558 Australia

T (+61) (7) 5445 4952 F (+61) (7) 5445 3764 www.coffey.com

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1382 - Operational Works - Landscaping & Civil Works [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.