Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Unit Building, Sunshine Beach Foundation Design Certification 3.0 DESIGN CONSIDERATIONS AND RECOMMENDATIONS Soil reactivity was assessed to be minimal in the sandy upper soils on the site. Some miner elastic settlements can be anticipated. These are likely to be some 10 to 20 mm depending on loads and location. The allowable bearing capacity is a function of depth and location on the site. For high level footings founded at depths greater than 0.3 metres near the front of the site in the vicinity of boreholes BH1 and BH2, an allowable. bearing capacity of 100 kPa was recommended for design. For the rear of the site in the vicinity of boreholes BH3, BH4 and BH5, the sands were loose to depths of 1.4, 0.9 and 1.1 metres respectively. Founding at shallow depth in this area was not recommended. Deeper footings founded at depths between 1.1 and 1.6 metres were recommended. The founding strata at these depths were medium dense sands with an allowable bearing capacity of 100 kPa. Basement design parameters and piled footing considerations were provided. 4.0 FOUNDATION DESIGN AND CERTIFICATION The engineering design was undertaken by Contour Consulting Engineers. The design is set out ina series of drawings prefixed 5083. The footing designs are set'out in Drawings S 2.0, S 2.1 and S 2.2. The design shows a full piled footing system with strip footing beams. Pile depths are not specified but pile ‘axial load capacities are set out in the drawings. The design meets the requirements of our design recommendations. It is hereby certified that the foundation type and design for the structure, retaining walls and swimming pool .are in accordance'with the design requirements of our geotechnical report. This certification is subject to the achievement of the pile load capacities specified in the drawings. The capacity of all piles should be certified by the piling contractor. Should you wish to. discuss any aspect of this certification, please contact Ron McMahon at Coffey’s Kunda Park office. For and on behalf of COFFEY GEOTECHNICS PTY LTD —_ ” RON MCMAHON ATTACHMENTS: Important information about your Coffey Report Coffey Geotechnics 2 GEOTKPARI334AA/A 22 January 2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.