INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
Biers zs
SECTION 4° secion 4 must
[PLANNING SCHEMES 8 nboe:
41 Is the proposed operational work assessable under any State planning regulatory provisions?
(1 No Yes
If yes, is the proposed operational work assessable under the planning scheme?
[7] No - Answer 04.1.1-4.17 ([] Yes - Complete Form 1, Part € and answer 04.1.1 - 4.1.7 below
eu
Pm ATEN ET one cH
TATE-CONTROLLED ROAD, er 5
4.1.4 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No {[] Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
(1) No -Got0.04.1.2
TD Y@8 - This apptication must be referred to the Department of Main Roads (DMR} as Concurrence Agency.
sie 2, fable 3. Rem SIP Reg
Is any of the operational work proposed in a local government area listed*!' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
(] No - Got 04.1.3 Yes
41 surukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Cabootture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redtand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
=
4.1.2
If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
No
(Yes
n. schedule 2. table 3. item 4:
pis, section 46
eatvinia Acid Suifsi
EASEMENTS AND SUBSTATIONS.
413
Is any of the proposed operational work for filling or excavation?
(1 No -Go1004.1.4
[x] Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
(1) Yes - Goto 04.14
No - Answer both (a) and (b) below
(a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?
No
L] Yes
{b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 1994?
{X] No (1) Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
2 fat Wuie 2 table 2 ten 10ibi
4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No -Gotoa41.5 [_] Yes
reddit 2, table 3,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.