INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
Biers zs

SECTION 4° secion 4 must
[PLANNING SCHEMES 8 nboe:
41 Is the proposed operational work assessable under any State planning regulatory provisions?

(1 No Yes
If yes, is the proposed operational work assessable under the planning scheme?

[7] No - Answer 04.1.1-4.17  ([] Yes - Complete Form 1, Part € and answer 04.1.1 - 4.1.7 below

 

 

eu

   
 

 

 

 

 

Pm ATEN ET one cH
TATE-CONTROLLED ROAD, er 5
4.1.4 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?

No {[] Yes

If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?

(1) No -Got0.04.1.2

TD Y@8 - This apptication must be referred to the Department of Main Roads (DMR} as Concurrence Agency.

 
  

sie 2, fable 3. Rem SIP Reg

 
  
   

Is any of the operational work proposed in a local government area listed*!' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
(] No - Got 04.1.3 Yes

41 surukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Cabootture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redtand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

=

  

4.1.2

If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
No
(Yes

n. schedule 2. table 3. item 4:

     

pis, section 46

 

eatvinia Acid Suifsi

  

     
 

EASEMENTS AND SUBSTATIONS.
413

  

Is any of the proposed operational work for filling or excavation?
(1 No -Go1004.1.4

[x] Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
(1) Yes - Goto 04.14
No - Answer both (a) and (b) below
(a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under

the Electricity Act 1994?

No
L] Yes
{b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 1994?
{X] No (1) Yes - This application must be referred to the entity responsible for the substation as Advice Agency.

2 fat Wuie 2 table 2 ten 10ibi

 

4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

No -Gotoa41.5 [_] Yes

reddit 2, table 3,

   

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1382 - Operational Works - Landscaping & Civil Works [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.