Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
(PUBLIC PASSENGER.TRANSPORT. 5, & FoF Us Se Se a GS
4.1.5 _ {s any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No-Gotoa4.1.6 | [_] Yes - This application must be referred to QueensiandTransport (QT) as Concurrence Agency.
RAILWAY: SAFETY. "AND. EFFICIENCY + ne
4.1.6 Is any of the proposed operational work isted in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
x] No- Ge fo 04.1.7 Oo Yes - This application must be referred to Queensland Transport (QT} as Concurrence Agency.
a)
IKOALA CONSERVATION (outside SEQ urban pan footprint) © 2
4.1.7 ts any part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
[K] No -Gotoas2 (C] Yes
schedule 2. table 3, dem 19
IP Regulation
4.2 Is any of the vroposed operational work associated with reconfiguring a it and the reconfiguration is also assessable?
[X] No -Gotoas3 [[] Yes
4.3A Is any part of the premises in an interim koala habitat protection area?
{X] No -Gotoas.38 [[} Yes
IP Raguiation, schadule @, table 2, item 444
WEGETATION. ‘CLEARING; KOALA CONSERVATION; WILD: }RIVER:AREA x
438 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
[x] No -Goioass [[] Yes
1G
4.4 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water, and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or fake?
No -Gotoas5 [_] Yes - Answer (a) and (b) below
8. Wales 4
45 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck fo pump water)?
No Go lo Q4.6 oO Yes - (Complete Form 1. Part K,) This application requiras assessment by the Department of Natural Rescurces and Weter
(NRW). IF NRW Is net the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.