Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22 'WIED RIVER'AREA BX" eet no gate gee Eee 4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005? [K] No -Gowosis [7] Yes ipa table t tens 16 b 2008. see 4.16 1s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road? No -Erd ofsection 4 [[] Yes 2 tem} Disclaimer: While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your reliance on this process and the information contained on this form.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.