Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000. for taking
overland flow water (other than using a water truck to pump water)?
No - Go io Q47 oO Yes - Answer (a) and to) below
D softaade [ner St td vet HEE:
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000. for taking or
interfering with subartesian water (other than using a water truck to pump water)?
No -Gowoa3 [(] Yes
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
No -Got0049 [_] Yes - Answer both (a) and (b} below
6, schedda 2 tabs
shediée 1 par 3 tube d tes
:
49 Is the proposed operational work for the following?
() For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
—] No () Yes
Act 2008
(ii) To increase the storage capacity of a referable dam by more than 10% —] No L Yes
if yes fo either or both (i) or (ii) above - (Complete Form 1, Part Xs) This application requires assessment by the Department of Neturai Resources and
Water (NRW). if NRW is nof the Assessment Manager ior the appication. the agency has jurisdiction as
Concurrence Agency.
4 fable 4. tam 4 IP Reg
2 tem iD
IPA, schedule & pari
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the PA?
IX] No -Got0 oar 7] Yes - Answer (a) and (b) below
aduie 2. table 2, i
‘A fwil river ores)
2. P46 and 17: iP Reguialion, scheduie 1. pert 3 fabia 4
ICOASTAL MANAGEMENT DISTRICT; WILD- RIVER AREA: :
411 ls any of the operational work proposed to be carried out within a coastal management district?
[X] No -cotoass2 ([] Yes
tort SIP Ragu
at 2. fable 4. Reng 4A and 3
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 19947
XX No -Gotoa412 [[] Yes
fash IP Regulation suix
4.13 ls any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
No - Got 04.14
0 Yes
4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
No -Goteas.15 [[] Yes
& i PA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.