Skip to the record
Accept no imitations.

Council archive · source document

09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382

of 117

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000. for taking
overland flow water (other than using a water truck to pump water)?
No - Go io Q47 oO Yes - Answer (a) and to) below

 
 

D softaade [ner St td vet HEE:

 

47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000. for taking or
interfering with subartesian water (other than using a water truck to pump water)?
No -Gowoa3 [(] Yes

 

48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
No -Got0049 [_] Yes - Answer both (a) and (b} below
6, schedda 2 tabs

 

shediée 1 par 3 tube d tes

:

   

49 Is the proposed operational work for the following?
() For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
—] No () Yes
Act 2008
(ii) To increase the storage capacity of a referable dam by more than 10% —] No L Yes

if yes fo either or both (i) or (ii) above - (Complete Form 1, Part Xs) This application requires assessment by the Department of Neturai Resources and
Water (NRW). if NRW is nof the Assessment Manager ior the appication. the agency has jurisdiction as
Concurrence Agency.

4 fable 4. tam 4 IP Reg

2 tem iD

  

IPA, schedule & pari

 

4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the PA?

IX] No -Got0 oar 7] Yes - Answer (a) and (b) below
aduie 2. table 2, i

‘A fwil river ores)

 

2. P46 and 17: iP Reguialion, scheduie 1. pert 3 fabia 4

   
  

 

 

ICOASTAL MANAGEMENT DISTRICT; WILD- RIVER AREA: :
411 ls any of the operational work proposed to be carried out within a coastal management district?
[X] No -cotoass2 ([] Yes

tort SIP Ragu

  

at 2. fable 4. Reng 4A and 3

       

 

 

4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 19947
XX No -Gotoa412 [[] Yes

fash IP Regulation suix

  

 

4.13 ls any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
No - Got 04.14

0 Yes

 

 

4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
No -Goteas.15 [[] Yes
& i PA

 

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1382 - Operational Works - Landscaping & Civil Works [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.