1.0

INTRODUCTION
1.1 Preamble

Duke Environmental have been commissioned by Oak Investment Holdings Pty
Lid (via Contour Consulting Engineers) to undertake this Stormwater
Management Plan.

This report has been compiled generally in accordance with Noosa Shire
Councils (NSC) Policy 5 — Engineering Design Standards Roads, Drainage and
Earthworks (Section 4. Design and Approval — Drainage), and addresses Item 3
of Noosa Shire Council Information Request (Ref: 2007/2174), dated 5
December 2007. This report details proposed stormwater quantity management
strategies to be incorporated into the construction and operation phases of the
proposed development.

1.2 Site Location

The subject site is located at 43-45 Elanda Street, Sunshine Beach, and is
described as Lots 399 & 400 on RP 48112. The site has an area of
approximately 0.15 ha.

Refer Figure 1.0 in Appendix A for Site Locality Plan and Figure 2.0 in Appendix
A for Aerial Photograph.

1.3 Description of the Proposal

The applicant proposes to construct a development comprising of five (5)
apartments, with associated driveways, swimming pools and car parking areas.
Additionally, the development will contain a detention basin to aid in the provision
of non-worsening of stormwater flows. Refer lan Gorton Design Drawing
0710SD.06 included in Appendix A.

1.4 Site Characteristics

The site is accessed from Elanda Street and consists of two (2) lots. One (1) lot
has a residential dwelling which is accessed by an unsealed driveway.

Existing vegetation on the subject site is generally comprised of scattered trees
and grassy areas.

The topography of the site is mapped as steeply sloping generally from the
southern boundary towards the north of the site.

Refer Figure 2.0 - Aerial Photograph included in Appendix A.

1.5 Site Constraints & Opportunities

Opportunity is provided to locate a Detention Basin within the site to treat
stormwater runoff. Further, a closed tank system for every apartment is
proposed to collect rainwater runoff from the roof areas. Roof rainwater runoff will
be re-used to supply toilet flushing and landscape irrigation. Runoff from
carpark/driveway areas and overflow from rain water tanks will enter the
Detention Basin before being released from the site. These are considered

 

AA07731SMP
January 2008

AT§js

 

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1382 - Operational Works - Landscaping & Civil Works [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.