Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
3.3 Discussion of Results With reference to the results detailed in Table 2.1, it can be seen that the proposed mitigation system (“Case 3”) provides effective non-worsening of discharges in comparison to the pre-development case (“Case 1”). This is achieved by the inclusion of Detention Basin storage. It is to be noted that the above analysis is considered to provide conservative results for the following reasons: e The effects of roof water collection systems proposed to be installed at the site have been ignored. 40 CONCLUSIONS / RECOMMENDATIONS We consider that the above accurately, and conservatively, models the stormwater runoff characteristics of the subject catchment. Catchment areas, and individual components of the proposed water quantity treatment systems, are detailed above. We consider that this report demonstrates no net increase in stormwater run-off discharging from the site in comparison to the pre development case. 5.0 LIMITATIONS OF THIS STUDY This study has been tailored to investigate issues in the context of the proposal, and at the area of interest, being Lots 399 & 400 Elanda Street, Sunshine Beach. Individual sub-catchments situated above, and below the area of interest, may have different hydrological / hydraulic influences. Hence, the information contained in this report is not to be used outside of the subject area. We consider that the study accurately reflects the conditions for the area of interest, at the time the study was undertaken. The results of this study should be reviewed if catchment / proposal conditions change in the future. Where applicable, and due to their latent nature, subsurface conditions and/or water quality monitoring results may vary significantly across the site and/or temporally in comparison to those described herein. Notwithstanding the above, this report has been undertaken for the specific purposes of Oak Investment Holdings Pty Ltd (via Contour Consulting Engineers), as detailed in our correspondence to them, and is solely for the use of Oak Investment Holdings Pty Ltd (via Contour Consulting Engineers Pty Ltd). This report is only to be used in full, and may not be used to support objectives other than those set out herein, except where written approval, with comments, are provided by Duke Environmental. Duke Environmental accept no responsibility for the accuracy of information supplied to them by second and third parties. AA07731SMP January 2008 ATijs oo Es eh lk
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.