Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
-~7- The Rational Method was used to check adopted discharge rates. Parameters adopted were generally based on recommendations in Australian Rainfall & Runoff (lEAust 1997), and the Queensland Urban Drainage Manual (1994). The pre and post development catchments for the development site outlined in Drawing DEO7731/01 in Appendix A. Detailed hydrologic calculations for the intemal pre and post catchment, listing all variables adopted, have been included in Appendix B. Results indicating the effectiveness of the proposed mitigation methods for the ARI storms investigated are detailed in Table 3.1 below. Table 3.1 Model Results ARI Site Catchment Discharge (m*/sec) , Detention Stom | CASE 1 Pre-Development CASE 2 .CASE 3 System Details Post- “Post-Dev | Water Depth Development | with Basin (m) XP-RAFTS Rational XP-RAFTS XP-RAFTS Method , ot 2 year 0.057 0.035 0.084 0.057 0.29 5 year 0.075 0.049 0.080 0.069 0.39 10 year 0.084 0.057 0.089 0.080 0.44 20 year 0.097 0.068 0.101 0.097 0.48 50 year 0.103 0.086 0.108 0.102 0.49 100 year 0.115 0.100 0.120 0.114 0.51 Site specific intemal catchment mitigation infrastructure used to model discharges from the site is summarised below. Refer to Drawings DEO7731/02 in Appendix A for details. 3.2 Mitigation Infrastructure Details Details of the detention basin used to model discharges from the site is summarised below. Adopted Basin parameters are: ° Low level pipe outlet: 0.0m (assumed detention) e Low level pipe outlet type: RCP e Low level pipe outlet specification: 1x225mm diameter 2 Weir height: 0.4m (above assumed detention) 2 Weir width: 0.5m 2 Depth over weir (Qio0): 0.11m * Total storage volume required: 11.3m? ° Detention depth in basin (Qico): 0.51m (above assumed detention) Refer to Drawing DE07731/02 in Appendix A for details. Refer Appendix B for RAFTS output results. AA07731SMP January 2008 ATijs
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.