-~7-
The Rational Method was used to check adopted discharge rates. Parameters
adopted were generally based on recommendations in Australian Rainfall &
Runoff (lEAust 1997), and the Queensland Urban Drainage Manual (1994).

The pre and post development catchments for the development site outlined in
Drawing DEO7731/01 in Appendix A. Detailed hydrologic calculations for the
intemal pre and post catchment, listing all variables adopted, have been included
in Appendix B.

Results indicating the effectiveness of the proposed mitigation methods for the
ARI storms investigated are detailed in Table 3.1 below.

 

 

 

 

 

 

 

 

 

 

Table 3.1
Model Results
ARI Site Catchment Discharge (m*/sec) , Detention
Stom | CASE 1 Pre-Development CASE 2 .CASE 3 System
Details Post- “Post-Dev | Water Depth
Development | with Basin (m)
XP-RAFTS Rational XP-RAFTS XP-RAFTS
Method , ot
2 year 0.057 0.035 0.084 0.057 0.29
5 year 0.075 0.049 0.080 0.069 0.39
10 year 0.084 0.057 0.089 0.080 0.44
20 year 0.097 0.068 0.101 0.097 0.48
50 year 0.103 0.086 0.108 0.102 0.49
100 year 0.115 0.100 0.120 0.114 0.51

 

 

 

 

 

 

Site specific intemal catchment mitigation infrastructure used to model discharges
from the site is summarised below. Refer to Drawings DEO7731/02 in Appendix A
for details.

3.2 Mitigation Infrastructure Details

Details of the detention basin used to model discharges from the site is
summarised below.

Adopted Basin parameters are:

° Low level pipe outlet: 0.0m (assumed detention)

e Low level pipe outlet type: RCP

e Low level pipe outlet specification: 1x225mm diameter

2 Weir height: 0.4m (above assumed detention)

2 Weir width: 0.5m

2 Depth over weir (Qio0): 0.11m

* Total storage volume required: 11.3m?

° Detention depth in basin (Qico): 0.51m (above assumed detention)

Refer to Drawing DE07731/02 in Appendix A for details. Refer Appendix B for
RAFTS output results.

 

 

AA07731SMP
January 2008
ATijs

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1382 - Operational Works - Landscaping & Civil Works [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗