Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Maintenance of Stormwater Detention Systems A stormwater detention system or detention basin aims to reduce the risk of rainfall runoff from the developed site affecting downstream properties. Stormwater runoff from developed land, i.e. from roofs and car parking areas occurs more frequently and with more volume than would otherwise happen from the undeveloped site. The detention system aims to collect most stormwater from the site and release it through a low level outlet, generally at a fixed rate of discharge. A level spreader receives all water discharging from the detention basin. Its function is to retum the concentrated, high velocity, piped flow to low velocity sheet flow. Recommended maintenance procedures and frequencies are detailed below. DETENTION SYSTEM MAINTENANCE SCHEDULE/ACTION INSPECTION ITEMS: FREQ. .| Action Required (details)) ° - mh . Low leve! outlet pipe — Monthly Check that the low level outlet pipe is not obstructed by debris. If it is, lobstruction by debris and after remove the debris and dispose of where it will not be carried back into heavy the detention basin. rainfall Low level outlet pipe — 3 monthly Check that the low level outlet pipe is not obstructed by either lobstruction by vegetation or vegetation, sediment build up or the ‘raising’ of the basin floor due to sediment extended periods of sediment being deposited in the basin. Vegetation should be kept clear of the inlet. If sediment is blocking the pipe it should be removed. If the basin floor is higher than the design level it may need to be excavated and returned to its design level. If this occurs a coarse sediment trap may need to be installed to pre- treat stormwater runoff entering the basin. Low level outlet pipe - scour | 3monthly | Check that the area surrounding the low level outlet pipe is not Jaround inlet affected by scour from high velocity flows. If this occurs, it should be rectified. Additional scour protection measures may be required, i.e. additional rock, pebble or stone pitching. Overflow weir — obstruction Monthly Check that the overflow weir is not obstructed by debris. If it is, by debris and after remove the debris and dispose of where it will not be carried back into heavy the detention basin. rainfall Overflow weir — scour around | 3 monthly | Check that the area surrounding the overflow weir is not affected by inlet scour fram high velocity flows. If this occurs, it should be rectified. Additional scour protection measures may be required, i.e. additional rock, pebble or stone pitching. Inlet pipes — obstruction by Monthly Check that the inlet pipes are not obstructed by debris. If they are, debris and after remove the debris and dispose of where it will not be carried back into heavy the detention basin. rainfall Inlet pipes — scour around 3monthly | Check that the area surrounding the inlet pipes is not affected by inlet scour from high velocity flows. If this occurs, it should be rectified. Additional scour protection measures may be required, i.e. additional tock, pebble or stone pitching. Patchy grass Monthly If significant patches of dead grass are observed they should be replaced with new turf. Bare patches of soil should not be allowed to remain, as this may increase runoff of coarse sediment and affect other drainage infrastructure. Establishment and Every 3 For first 2 weeks after laying new turf, water every 3 days if no rain maintenance of new turf Days occurs. For the following month, water as necessary, dependant on watering) rainfall, After this period the new turf should not require watering, however during extended periods of dry weather, and dependant on prevailing environmental conditions, occasional watering may be required. AG07310MM Page 1 of 3 October 2009 ATijs
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.