Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
DETENTION SYSTEM MAINTENANCE SCHEDULE/ACTIONS NSPECTION ITEMS: FREQ. Action Required (details) Establishment and Monthly Do not mow new turf for the first month. After this period mowing will maintenance of turf (mowing) be necessary dependant on seasonal variations such as rainfall and temperature. Grass length should initially be left relatively long, to avoid potential drying out of the turf. In addition, no grass clippings should be teft on the ground, as they may release excess nutrients to the stormwater. All grass clippings are to be collected and disposed of where they will not be carried back into the detention basin Weed control Monthly Monitor the basin for build up of weeds. Weed removal should be manual. Herbicides should not be used. Litter within the basin? Monthly Remove litter and dispose of appropriately. Grass within the basin Monthly The height of grass within the basin should not be allowed to get excessively high or interfere with stormwater flows to the low level outtet pipe. Regular mowing should be employed. Grass clippings should be collected and disposed of outside of the basin. This is due to the high nutrient levels of decomposing grass, and the adverse effect this may have on water quality leaving the site. Sides of basin 3 Monthly The sides of the basin should be checked for evidence of scour caused by stormwater entering the basin other than via the inlet pipes. Evidence of preferential overland flow paths entering the basin may need to be addressed to avoid further damage. Spreading the flow over a greater area may need to be employed. Level Spreader — gravel Monthly Check that the gravel drainage layers of the level spreader are free of drainage layer debris and vegetation. Level Spreader During When raining, check that the level spreader is receiving all runoff from rainfall the detention basin. In addition, stormwater should be distributed along the length of the spreader. Evidence of flow not reaching the full length of the spreader should be investigated. The following may be reasons for restricted flow within the level spreader, « Gravel drainage layer is blocked ~ if so, remove debris. The drainage layer may need to be replaced if loaded with sediment. « Geotextile cloth is blocked — if so, remove sediment. The geotextile cloth and drainage layer may need to be replaced if loaded with excessive sediment. e Subsurface drainage pipes are block or obstructed — check that flow is unrestricted along the length of the drainage pipe. Obstructions such as sediment deposits may need to be ‘flushed’ out with plumbing equipment. If the drainage pipes are not graded correctly, they may need to be re-laid to ensure even distribution along the length of the pipe. Evidence of concentrated flow paths leaving the final stage of the level spreader will need to be investigated and rectified. Reasons for this are likely due to be flow not being distributed along the length of the spreader. Investigation and remedial action should follow that detailed above. COMMENTS AG07310MM Page 2 of 3 October 2009 ATijs
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.