Skip to the record
Every meeting, every word.

Council archive · source document

09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382

of 117

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

 

STORMWATER PIT MAINTENANCE SCHEDULE/ACTIONS

 

 

 

 

Ipresent.

 

INSPECTION ITEMS: FREQ. Action Required (details)
Litter within pit. Monthly Remove litter and dispose of appropriately.
IDamage/vandalism to structures) Monthly If damage or vandalism occurs replace affected items

immediately.

 

COMMENTS

 

 

 

 

GROSS POLLUTANT TRAP/ HYDROCARBON ARRESTOR MAINTENANCE

SCHEDULE/ACTIONS

 

INSPECTION ITEMS:

|.FREQ.

Action Required (details) ._.

ao fw

 

Litter within silt basket.

Monthly

Monitor the build up of Gross pollutants and Titer within the silt
basket. When required, remove the grate, lift out the basket, and
dispose of gross pollutants and litter to a rubbish bin or other
suitable location.

 

Sediment and hydrocarbons}
within collection chamber.

3 monthly

Monitor the build up of sediment and hydrocarbons in the
collection chamber. When required the grate and silt basket can
be removed to provide access to the collection chamber.
Sediment and hydrocarbons can be sucked out from the
chamber by a suitable pump out truck or equivalent.

 

IDamage/vandalism to structures|
lpresent?

 

Monthly

 

If damage or vandalism occurs replace affected items
immediately.

 

COMMENTS

 

extended to 12 months.

 

Arecord of the required initial clean out and pump out frequencies should be kept. This is to enable future loading
and maintenance requirements of the GPT to be known. Fox Environmental systems recommend that initially the
unit is cleaned out every 3 months. However, dependant on site conditions the interval between cleanouts can be

Refer to Fox BPT600 housekeeping notes and schematic detail induded in Appendix C for further maintenance
and operating advice for this unit.

 

 

AG07310MM
October 2009
ATijs

Page 3 of 3

 

 

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1382 - Operational Works - Landscaping & Civil Works [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.