Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
BPT600 Housekeeping To ensure that the Fox Model BPT600 unit performs the function for which it is installed there are some very basic housekeeping functions that need to be performed. The interval between these activities is very much site specific. A responsible approach to these functions will provide the maximum benefit to the environment. As Required: « When large items of floating debris (such as plastic bags, drink cans etc.) are observed on the inlet grate of the unit they should be collected and disposed of in a suitable manner. The Fox BPT600 does not capture these items; they are simply prevented from entering the stormwater discharge through the unit. If they are not removed they could still be harmful to the environment as they may be washed or blown off the site. Weekly ¢ Regularly inspect the unit for a build up of captured pollutants within the silt basket. This should be done on a weekly basis or more often if large quantities of silts are being retrieved. To empty the silt basket remove the grate from the chamber. Locate and remove the two M8 bolts at the comers and lift the grate out of the frame. Please note that the grate is heavy and proper care should be taken when removing it. For safety reasons the unit should never be left unattended when the grate and basket are removed. » Remove the silt basket and dispose of captured pollutants in a suitable manner such as emptying it in a garbage bin or similar. = Assoon as the basket has been emptied it must be replaced and the grate returned to its’ locked position. From time to time the chamber of the unit will need to be cleaned of silt build up and retained hydrocarbons. The frequency of this activity will depend on the site conditions of each installation. e Fox Environmental Systems recommend that initially the units are cleaned on a 3 monthly basis. Dependent on site conditions the interval between cleanouts can then be extended to 12 monthly. This service should consist of a minimum of the following activities. = With the silt basket removed check the contents of the chamber. If there is a build up of hydrocarbons on top use a suction pump to remove and dispose of the top portion. Captured hydrocarbons must be disposed of in a manner prescribed in the Environmental Protection Act. * Pump the remaining water from within the chamber and filter through a minimum 20 micron filter before allowing it to be discharged into the stormwater system. » Remove all silt and sediment build up from within the chamber and dispose of it in a suitable manner, such as emptying it in a garbage bin. = Following each service quantities of pollutants that are removed should be recorded to enable proper assessment of the serving frequencies required to be ascertained. For maximum environmental protection and to reduce maintenance costs the silt basket should always be in place within the unit. Fox Environmental Systems Pty Ltd offers a full service for the maintenance of the BPT600 units in SE Queensland. Contact our Service Manager on (07) 5437 8455 for information and costing.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.