Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
To lift grate remove 2x MB bolts. Schematic Detail of BPT600 System Class B Grate Silt Basket with High Flow By-Pass Silt Basket with High Flow Bypass To Stormwater 150 O.D. Outlet Pipe __Invert Level 320mm SPECIFICATIONS Material 12mm MDPE Hydrocarbons Chamber Volume 330 litres wrapped behind Grate Class ‘B/Galvanised battle. Treated Flow Rate 5 litres/second Maximum Flow Rate 20 litres/second Solids Capacity 50 litres | Sih Basket Capaci 50 lit Pre-cleaned water Sediment vapacly Y amm 99% exits via balfled ri Ox ENVIRONMENTAL Hydrocarbon Capture >95% outlet Available Options SYSTEMS Retention at Bytlow rate 100% 225mm Stormwater Outlet This Drawing ond design ia the Property Class 'D’ Grate of Fox Environmental Systems. Pty Ltd. It - mui be used for any other purpose Note: Inverts will change. than thot for which it wos issued. This Request detalls it required. drawing must not be shown or tent to anyone without the written parmission of the Fox Environmental Systems Pty Ltd. Project: System Specifications Drawing Title: PROCESS DETAILS BPT600 Assembly The Fox Model 8PT600 is a baffled pollutant trap with a high flow by-pass. It is designed for use in open areas where trash and other debris cannot be controlled and a potential for minor quantities of hydrocarbons exists. The unit has a controlled flow rate through the sift basket where trash and silt are removed. Runoff then enters the main _ chamber and exits via the battle, retaining minor quantities of hydrocarbons that may be present. 08/03/2007 tf the rain intensity exceeds the treatable flow rate the high flow by-pass allows excess runoff to exit directly via the baffle The Fox BPT600 has an efticiency of greater than 99% for the capture and retention of silts and solids smaller than ‘3mm. A4 - SPEC-1016
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.