Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Unit Building, Sunshine Beach Geotechnical investigations Dewatering It should be noted that although no water table was recorded at the time of investigations, during periods of prolonged heavy rainfall, short term water tables may develop. All footing, excavation and retaining wall design should allow for the possibility of higher groundwater levels. Reuse of Soils The soils to be excavated for the basement on the site are sands, silty.sands and some clayey sands. These soils are suitable for reuse as engineered fill if recompacted under a geotechnical overview. Some of these soils are acid sulphate soils however and their excavation and reuse should be undertaken in accordance with an approved acid sulphate soils management plan. Should you wish to discuss any aspect of this report, please contact Ron McMahon at Coffey's 's Kunda Park office. For and on behalf of COFFEY GEOTECHNICS PTY LTD PZ _RON MCMAHON ATTACHMENTS: Important information about your Coffey Report Figure 1-A Coffey Borehole Logs Caffay Geotechnics GEOTKPAR1I334AAV/A 22 January 2008 ee ee
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.